Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13336A709 | 31 December 2013 | Staff Evaluation Related to Review of 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 | Fuel cladding |
ML13326A502 | 24 December 2013 | Safety Evaluation Related to Request for Approval of Revised Loss-of-Coolant Accident (LOCA) Dose Calculations for the ANO-1 Control Room Based on Alternate Source Term | |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns | Unanalyzed Condition |
IR 05000313/2013009 | 23 December 2013 | NRC Triennial Fire Protection Inspection Report (05000313-13-009 and 05000368-13-009) and Notice of Enforcement Discretion | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Operator Manual Action Emergency Lighting Significance Determination Process B.5.b Mitigating Strategies Maintenance Rule Program Fire Protection Program |
1CAN121302, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years | 20 December 2013 | License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years | Probabilistic Risk Assessment Large early release frequency Moisture barrier |
TAC:MF3279 | 20 December 2013 | ||
TAC:MF3278 | 17 December 2013 | ||
ML13351A102 | 17 December 2013 | Notification of Generic Fundamentals Examinations for 2014 | Generic Fundamentals Examination |
0CAN121302, License Amendment Request - Cyber Security Plan Implementation Schedule | 17 December 2013 | License Amendment Request - Cyber Security Plan Implementation Schedule | Cyber Security |
TAC:MF3277 | 17 December 2013 | ||
2CAN121303, Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-422 | 12 December 2013 | Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-422 | Shutdown Margin |
ML13269A208 | 12 December 2013 | Cover Memo from B. Caldwell to M. Markley RAI for Arkansas Nuclear One (ANO) Revision 15 Security Plan Review | |
1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits | 11 December 2013 | Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits | Fuel cladding |
PNO-IV-13-004, A: Entergy, Update Arkansas Nuclear One, Unit 2, Fire in Auxiliary Transformer | 10 December 2013 | PNO-IV-13-004A: Entergy, Update Arkansas Nuclear One, Unit 2, Fire in Auxiliary Transformer | |
Press Release-IV-13-037, NRC Monitoring Event at Arkansas Nuclear One | 9 December 2013 | Press Release-IV-13-037: NRC Monitoring Event at Arkansas Nuclear One | |
ML13343A245 | 9 December 2013 | PNO-IV-13-004 Arkansas Nuclear One, Unit 2, Notification of Unusual Event | |
2CAN121302, Response to Request for Additional Information Adoption of National Fire Protection Association Standard NFPA-805 | 4 December 2013 | Response to Request for Additional Information Adoption of National Fire Protection Association Standard NFPA-805 | Safe Shutdown Probabilistic Risk Assessment Thermoset Power Operated Valves Fire Protection Program |
ML13336A784 | 26 November 2013 | Response to Request for Additional Information (RAI) Pursuent to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements | Fukushima Dai-Ichi |
0CAN111302, Supplemental Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 26 November 2013 | Supplemental Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |
TAC:MF0194 | 26 November 2013 | ||
ML13326A345 | 22 November 2013 | NRR E-mail Capture - RAI Related to the Adoption of (TSTF)-422, Revision 2 | |
ML13326A333 | 21 November 2013 | NRR E-mail Capture - Acceptance Review Result for Relief No. ANO2-ISI-016 | Dissimilar Metal Weld |
TAC:MF2320 | 21 November 2013 | ||
ML13324A952 | 18 November 2013 | Closure of Investigation (Ol 4-2013-002) | |
ML13304A899 | 15 November 2013 | Reassignment to the DORL Plant Licensing IV-2 and Decommissioning Transition Branch Effective 11/3/2013 | |
1CAN111302, Response to Request for Additional Information ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) | 14 November 2013 | Response to Request for Additional Information ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) | Safe Shutdown Offsite Circuit |
2CAN111305, Unit 2, Response to Request for Additional Information Related to Relief Request ANO2-ISI-004 | 11 November 2013 | Unit 2, Response to Request for Additional Information Related to Relief Request ANO2-ISI-004 | |
2CAN111301, Response to Request for Additional Information, Adoption of National Fire Protection Association Standard NFPA-805 | 7 November 2013 | Response to Request for Additional Information, Adoption of National Fire Protection Association Standard NFPA-805 | Hot Short Safe Shutdown Mission time Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Operator Manual Action Temporary Modification Multiple Spurious Operation Emergency Lighting Thermoset Continuous fire watch Fire Protection Program Early Warning Fire Detection Very Early Warning Fire Detection |
ML13311B381 | 7 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (QAPM) | |
1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) | 5 November 2013 | Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) | |
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | 4 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | |
IR 05000313/2013004 | 1 November 2013 | IR 05000313-13-004 & 05000368-13-004; 07/01/2013 - 09/30/2013, Arkansas Nuclear One, Units 1 and 2, Integrated Resident and Regional Report | Boric Acid Time of Discovery High Radiation Area Water Inventory Control Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Functionality Assessment Significance Determination Process Large early release frequency Fire Protection Program |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13281A502 | 29 October 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Safe Shutdown Earthquake Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
ML13301A675 | 28 October 2013 | NRR E-mail Capture - RAI Related to the LAR on Adoption of TSTF-431, Revision 3, Change in TS End States (BAW-2441) | |
TAC:MF5107 | 23 October 2013 | ||
TAC:MF3251 | 23 October 2013 | ||
0CAN101301, Units 1 and 2 - Revision 16 of the ANO Security Plan | 23 October 2013 | Units 1 and 2 - Revision 16 of the ANO Security Plan | |
1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R24 | 23 October 2013 | Unit 1, Steam Generator Tube Inspection Report - 1R24 | Nondestructive Examination |
1CAN101305, Unit 1, Response to Additional Request for Additional Information Related to 10 CFR 50.46 30-Day Report | 22 October 2013 | Unit 1, Response to Additional Request for Additional Information Related to 10 CFR 50.46 30-Day Report | |
1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) | 21 October 2013 | Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) | Through-Wall Leak |
ML13282A360 | 9 October 2013 | Request for Additional Information, Relief Request ANO2-ISI-004 - Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations | |
TAC:MF2319 | 9 October 2013 | ||
ML13282A582 | 9 October 2013 | Acceptance Review Email, Relief Request ANO2-ISI-004 - Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations | |
1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 | 8 October 2013 | Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 | Liquid penetrant DM weld |
ML13274A115 | 1 October 2013 | Correction E-mail, Request for Additional Information, 10 CFR 50.54(f) Request for Information on Recommendation 9.3, Emergency Preparedness - Staffing, Phase 1 Staffing Assessment | Fukushima Dai-Ichi |
2CAN091302, Updated Seismic Walkdown Report | 30 September 2013 | Updated Seismic Walkdown Report | Safe Shutdown Unanalyzed Condition Boric Acid Safe Shutdown Earthquake Finite Element Analysis Fukushima Dai-Ichi Earthquake Maintenance Rule Program Scaffolding |
1CAN091301, Updated Seismic Walkdown Report | 30 September 2013 | Updated Seismic Walkdown Report | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Probabilistic Risk Assessment Finite Element Analysis Fukushima Dai-Ichi Earthquake Maintenance Rule Program Scaffolding |
IR 05000313/2013405 | 30 September 2013 | Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats; IR 05000313-13-405 and 05000368-13-405 | |
ML13273A342 | 30 September 2013 | Request for Additional Information Email, 10 CFR 50.54(f) Request for Information on Recommendation 9.3, Emergency Preparedness - Staffing, Phase 1 Staffing Assessment | Fukushima Dai-Ichi |