ML13336A784

From kanterella
Jump to navigation Jump to search

Response to Request for Additional Information (RAI) Pursuent to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements
ML13336A784
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/26/2013
From: Jeremy G. Browning
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
OCAN111301
Download: ML13336A784 (9)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Jeremy G. Browning Site Vice President Arkansas Nuclear One 0CAN111301 November 26, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Response to Request for Additional Information (RAI) Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

REFERENCES:

1. NRC letter to Entergy, Request for Information (RFI) Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (0CNA031208) (ML12053A340)
2. Electrical Power Research Institute (EPRI) Seismic Walkdown Guidance for Resolution of Fukushima NTTF Recommendation 2.3: Seismic, EPRI Report 1025286, dated 2012 (ML12188A031)
3. NRC Letter to Entergy, RAI Associated with NTTF Recommendation 2.3, Seismic Walkdowns, dated November 1, 2013 (0CNA111301) (ML13304B418)
4. Entergy letters to NRC, Seismic Walkdown Report - Entergys Response to NRC RFI Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the NTTF Review of Insights from the Fukushima Dai-ichi Accident), dated November 27, 2012 (1CAN111201) (ML12342A219) and (2CAN111201) (ML12342A051)
5. Entergy letters to NRC, Updated Seismic Walkdown Report, dated September 30, 2013 (1CAN091301) (ML13283A067) and (2CAN091302) (ML13283A064)

0CAN111301 Page 2 of 3

6. Internal NRC memorandum from Lisa M. Regner to Matthew A.

Mitchell, Summary of the September 12, 2013, Public Meeting to Discuss Implementation of Japan Lessons-Learned NTTF Recommendation 2.3, Seismic Walkdowns, dated October 4, 2013 (ML13266A424)

Dear Sir or Madam:

On March 12, 2012, the NRC issued a letter requesting information per Title 10 to the Code of Federal Regulations, Section 50.54(f) (Reference 1). The letter requested licensees to conduct seismic hazard walkdowns to verify current plant configuration with the CLB. The NRC endorsed an EPRI guidance document that resulted from this effort (Reference 2) because the NRC staff determined that the use of the guidance would address the information requested in Reference 1. Entergy Operations, Inc. (Entergy) submitted the walkdown reports for Arkansas Nuclear One (ANO) by References 4 and 5.

Following the staffs initial review of the walkdown reports, regulatory site audits were conducted at a sampling of plants. By internal NRC correspondence (Reference 6) the NRC summarized the public webinar conducted on September 12, 2013, and provided written questions identifying the areas where additional information could assist the NRC staff in completing their reviews of the walkdown reports. These questions were consolidated and on November 1, 2013, Reference 3 was issued by the NRC containing an RAI. Entergy is providing a response to the RAI (Reference 3) for ANO. The attachment provides additional information not required by the original request for information (Reference 1) to assist the NRC staff in completing their review of the Seismic Hazard Walkdowns conducted at ANO.

This letter contains no new regulatory commitments. If you have any questions regarding this submittal, please contact Stephenie Pyle at 479.858.4704.

I declare under penalty of perjury that the foregoing is true and correct. Executed on November 26, 2013.

Sincerely, Original signed by Jeremy G. Browning JGB/nbm

Attachment:

RAI Responses to Support the NRC Review of Seismic Walkdown Inspections

0CAN111301 Page 3 of 3 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission Attn: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam OWFN - Mailstop O-8 B1 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Robert J. Fretz Jr.

OWFN - Mailstop 4A15A 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Robert L. Dennig OWFN - Mailstop 10E1 11555 Rockville Pike Rockville, MD 20852-2378

Attachment to 0CAN111301 Request for Additional Information (RAI) Responses to Support the NRC Review of Seismic Walkdown Inspections

Attachment to 0CAN111301 Page 1 of 5 RAI Responses to Support the NRC Review of Seismic Walkdown Inspections RAI 1: Conduct of the walkdowns, determination of potentially adverse seismic conditions (PASCs), dispositioning of issues, and reporting As a result of the audits and walkdown report reviews, the Staff noted that licensees interpretations of the seismic walkdown guidance varied, which resulted in meaningful differences in the process used to disposition identified issues and in the documentation that was provided to the NRC Staff. In particular, the application of engineering judgment in determining what constituted a PASC; the threshold for conducting licensing basis evaluations (LBEs); and determining what information was to be reported to the NRC Staff varied.

The NRC Staff intended that conditions initially marked no (N) or unknown (U) in the field by the seismic walkdown engineers (SWEs) for which an analysis or calculation was performed would be considered as PASCs and that an analysis or calculation constituted a LBE. The walkdown guidance allows for analysis as part of engineering judgment; however, the intent was to allow for only simple analyses that could be readily performed in support of engineering judgment. Further, the walkdown activities were intended to allow for transparency in the licensees process to demonstrate that PASCs were appropriately identified, that they were addressed in an appropriate manner, and the basis documented such that the current condition of the plant was clearly consistent with the current licensing basis (CLB) with regards to seismic capability.

During the audits, the Staff identified examples of field observations that were deemed not to be PASCs. However, the basis for the determination was not clearly recorded. In some cases, the field checklists were amplified by noting that the basis was engineering judgment. During site audit discussions, the Staff was able to trace the basis for the engineering judgments and found that many cases they were appropriate. It is expected that these situations would not be included in the walkdown report.

There were other situations that a PASC and LBE were not reported; however, it was found during the audit that a calculation, analysis (more than just simple), or evaluation was conducted but informally. An example is a confirmatory calculation performed to demonstrate that six anchor bolts out of eight was not a seismically adverse condition.

Another example would be an analysis to demonstrate that an existing, slightly short weld was as seismically sound as the prescribed weld length in the plant design documentation. The Staff expected these types of conditions and evaluations to be captured in the licensees normal plant processes (e.g., condition report (CR) or corrective action program (CAP)) and also reported in the walkdown report since they were potentially adverse seismic conditions that required more than applying judgment or simple analysis to address.

The NRC Staff also found that the process that was used to deal with a field observation that was deemed to be a PASC was also not completely described or captured in the report. In many cases, the licensee reported that a LBE was not performed. However, during the audits it was clear that a LBE (or an equivalent determination method) was performed and used in determining whether a PASC should be entered into the CAP.

The Staff expects that these conditions would be reported in the walkdown report.

Attachment to 0CAN111301 Page 2 of 5 On the whole, through the audits the Staff found that it was able to conclude that the intent of the guidance was met when the licensees overall process was completely explained, the information was updated to reflect the actual process and resulted were updated. The self-assessments conducted by the licensees of the audited plants also identified the lapse in the description of the process used by the licensee to identify a PASC and disposition it.

Therefore, in order to clarify the process that was followed, provide a description of the overall process used by the licensee (and its contractors) to evaluate observations identified in the field by the SWEs. The process should include how a field observation was determined to be a PASC or not and how the bases for determinations were recorded. Once a determination was made that an observation was a PASC, describe the process for creating a condition report (or other tracking mechanism), performing the licensing basis evaluation (or other determination method), and the resultant action, such as entering it into the CAP or documenting the result and basis.

Also, in order to confirm that the reported information supports concluding that the plant meets the CLB, please follow one of the following three acceptable alternatives:

a) Provide a supplement to the table or text from the original walkdown report, if needed, to include similar conditions as the above examples and situations and for conditions for which a calculation, analysis (if more than a simple analysis),

or evaluation was used for a determination. The supplement should include a short description of each condition, how it was dispositioned, and the basis for the disposition, as follows: 1) for each condition that was entered into the CAP, provide the CAP reference number, initiation date, and (if known) the planned completion date, or 2) for all other conditions, provide the result of the LBE (or other determination method), the basis for the result, and how (or where) the result was captured in the plant's documentation or existing plant process.

b) Following the plant's standard procedures, confirm that a new CAP entry has been made to verify if appropriate actions were taken when reporting and dispositioning identified PASCs (including conditions for which a calculation, analysis (if more than a simple analysis), or evaluation was used for a determination). The eventual CAP closeout, including the process followed and actions taken, should be in sufficient detail to enable NRC resident inspectors to follow-up.

c) If no new conditions are identified for addition to the supplement or the CAP entry mentioned above is deemed not necessary, provide a statement of confirmation that all potentially seismic adverse conditions (including conditions for which a calculation, analysis (if more than a simple analysis), or evaluation was used for a determination) identified during the walkdowns and walk-bys were addressed and included in the report to the NRC.

Attachment to 0CAN111301 Page 3 of 5 In November of 2012 and September of 2013, Entergy Operations, Inc. (Entergy) documented the results of the seismic walkdown effort undertaken for resolution of Near-Term Task Force (NTTF) Recommendation 2.3: Seismic, in accordance with the Electric Power Research Institute (EPRI) Guidance, and provided the information necessary for responding to Enclosure 3 to the 10 CFR 50.54(f) letter (Reference 1). This industry guidance document, EPRI Report 1025286 (Reference 2) was formally endorsed by the NRC on May 31, 2012. The NRC provided this RAI on November 1, 2013 (Reference 3). Entergy has committed to using this NRC-endorsed guidance as the basis for conducting and documenting seismic walkdowns for resolution of NTTF Recommendation 2.3: Seismic. As a result of that commitment Entergy prepared a fleet procedure in strict accordance with the EPRI guidance for completing the walkdowns with uniform fleet results. In order to complete the walkdowns, Entergy hired Enercon Engineering to perform the walkdowns with site assistance and oversee the peer review process.

Seismic walkdowns were performed in accordance with Section 4 of the EPRI Guidance for all items on the Seismic Walkdown Equipment List (SWEL) (SWEL 1 plus SWEL 2), except for those determined to be inaccessible and deferred (see Section 6.3 of Reference 4). To document the results of the walkdown, a Seismic Walkdown Checklist (SWC) with the same content as that included in Appendix C of the EPRI Guidance was created for each item.

Additionally, where permitted by plant operations, photographs were taken of each item and included on the corresponding final revision of the SWC.

During the course of the seismic walkdowns and area walk-bys, the objective of the SWE teams was to identify existing degraded, non-conforming, or unanalyzed plant conditions with respect to its current seismic licensing basis. When an unusual condition was observed by a SWE team in the field, the condition was noted on the SWC or Area Walk-by Checklist (AWC) form and discussed between the two SWEs to agree upon whether it was a potentially adverse seismic condition. These initial conclusions were based on conservative engineering judgment and the training required for SWE qualification. The walkdown sheets were annotated where appropriate with supporting reference or justification for the basis of its acceptance. The walkdown sheets included explanation on why some field conditions were not identified as PASC if they were previously addressed or documented by another process, i.e., Seismic Qualification Utility Group, modification, or previous CR.

For conditions that were reasonably judged as insignificant to seismic response, the disposition was included on the SWC or AWC form and the appropriate question was marked Y indicating that no associated potentially adverse seismic condition was observed. Unusual or uncertain conditions were reported to site personnel for further resolution through the CAP (see Section 8.2 of Reference 5). These conditions were generally related to housekeeping.

For conditions that were judged as potentially significant to seismic response, the condition, if practical, was photographed and the appropriate question on the SWC or AWC was marked N indicating that a potentially adverse seismic condition was observed. The condition was then immediately reported to site personnel for further resolution and was documented for reporting in Attachment E of Reference 5. These conditions were generally related to housekeeping, non-conforming anchorage, or spatial interaction.

Attachment to 0CAN111301 Page 4 of 5 Conditions observed during the seismic walkdowns and area walk-bys determined to be potentially adverse seismic conditions are summarized in Attachment E of Reference 5, including how each condition has been addressed and its current status. Each potentially adverse seismic condition is addressed either with an LBE to determine whether it requires entry into the CAP or by entering it into the CAP directly. The decision to conduct an LBE or enter the condition directly into the CAP was made on a case-by-case basis based on the perceived efficiency of each process for eventual resolution of each specific condition.

Unusual conditions that were not seismically significant were entered into the CAP directly.

Further resolution of these conditions is not tracked or reported as part of the NTTF 2.3 Seismic Walkdown Program except by noting the CR numbers generated on the applicable SWCs and AWCs.

After review of the Entergy report (Reference 5), Entergy confirms that the reported information supports the conclusion that the plant meets its CLB in accordance with alternative (c) listed in the RAI Question 1. No new conditions are identified for all of the PASCs identified during the walkdowns and walk-bys. All items were addressed and included in the report (Reference 5) to the NRC.

RAI 2: Conduct of the Peer Review Process As a result of the walkdown report reviews, the NRC Staff noted that some descriptions of the peer reviewers and the peer review process that was followed were varied and, in some cases, unclear. In some cases, the Staff could not confirm details of the process, such as if the entire process was reviewed by the peer review team, who were the peer reviewers, what was the role of each peer reviewer, and how the reviews affected the work, if at all, described in the walkdown guidance.

Therefore, in order to clarify the peer review process that was actually used, please confirm whether the following information on the peer review process was provided in the original submittal, and if not, provide the following.

(a) Confirmation that the activities described in the walkdown guidance on page 6-1 were assessed as part of the peer review process.

(b) A complete summary of the peer review process and activities. Details should include confirmation that any individual involved in performing any given walkdown activity was not a peer reviewer for that same activity. If there were cases in which peer reviewers reviewed their own work, please justify how this is in accordance with the objectives of the peer review efforts.

Also, if there are differences from the original submittal, please provide a description of the above information. If there are differences in the review areas or the manner in which the peer reviews were conducted, describe the actual process that was used.

Attachment to 0CAN111301 Page 5 of 5 The peer review for the NTTF Recommendation 2.3 Seismic Walkdowns was performed in accordance with Section 6 of the EPRI Guidance. The peer review team was supplied by Enercon Engineering and was not part of the walkdown teams. The peer review included an evaluation of the following activities:

  • Review of the selection of the structures, systems, and components that are included in the SWEL;
  • Review of a sample of the checklists prepared for the seismic walkdowns and area walk-bys;
  • Sample in-field observations;
  • Review of licensing basis evaluations and decisions for entering the potentially adverse conditions in to the plants CAP; and
  • Review of the final submittal report.

At least two members of the peer review team (see Table 4.2 of Reference 5) were involved in the peer review with the team member with the most relevant knowledge and experience taking the lead for that particular activity. A designated overall Peer Review Team Leader provided oversight related to the process and technical aspects of the peer review, paying special attention to the interface between peer review activities involving different members of the peer review team. A more detailed description of the peer review is described in Section 9.0 and Attachment G of Reference 5.

References:

1. NRC letter to Entergy, Request for Information (RFI) Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the NTTF Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (0CNA031208) (ML12053A340)
2. EPRI Seismic Walkdown Guidance for Resolution of Fukushima NTTF Recommendation 2.3: Seismic, EPRI Report 1025286, dated 2012 (ML12188A031)
3. NRC Letter to Entergy, RAI Associated with NTTF Recommendation 2.3, Seismic Walkdowns, dated November 1, 2013 (OCNA111301) (ML13304B418)
4. Entergy letters to NRC, Seismic Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the NTTF Review of Insights from the Fukushima Dai-ichi Accident), dated November 27, 2012 (1CAN111201) (ML12342A219) and (2CAN111201) (ML12342A051)
5. Entergy letters to NRC, Updated Seismic Walkdown Report, dated September 30, 2013 (1CAN091301) (ML13283A067) and (2CAN091302) (ML13283A064)