MONTHYEAR1CAN031202, Unit 1, 10 CFR 50.46 Report Significant Change in Peak Cladding Temperature2012-03-20020 March 2012 Unit 1, 10 CFR 50.46 Report Significant Change in Peak Cladding Temperature Project stage: Request ML12300A3652012-10-26026 October 2012 E-mail Request for Additional Information, 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: RAI ML12313A4402012-11-0808 November 2012 E-mail Request for Additional Information, Review of 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: RAI 1CAN121203, Unit 1, Response to Request for Additional Information Related to 10 CFR 50.46 30-Day Report2012-12-17017 December 2012 Unit 1, Response to Request for Additional Information Related to 10 CFR 50.46 30-Day Report Project stage: Response to RAI ML13080A3502013-03-21021 March 2013 E-mail Request for Additional Information, Round 2, Review of 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: RAI 1CAN041301, Unit 1, Response to Request for Additional Information Related to 10 CFR 50.46 30-Day Report2013-04-10010 April 2013 Unit 1, Response to Request for Additional Information Related to 10 CFR 50.46 30-Day Report Project stage: Response to RAI ML13232A3542013-08-20020 August 2013 Request for Additional Information Email, Round 3, Review of 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: RAI 1CAN101305, Unit 1, Response to Additional Request for Additional Information Related to 10 CFR 50.46 30-Day Report2013-10-22022 October 2013 Unit 1, Response to Additional Request for Additional Information Related to 10 CFR 50.46 30-Day Report Project stage: Request ML13336A7092013-12-31031 December 2013 Staff Evaluation Related to Review of 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: Approval 2013-10-22
[Table View] |
|
---|
Category:Letter type:
MONTHYEAR1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R312024-08-13013 August 2024 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 1CAN072402, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 2024-08-13
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Licensing Arkansas Nuclear One 1CAN101305 October 22, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Response to Additional Request for Additional Information Related to 10 CFR 50.46 30-Day Report Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51
References:
- 1. Entergy letter dated March 20, 2012, 10 CFR 50.46 Report -
Significant Change in Peak Cladding Temperature (1CAN031202)
(ML12080A120)
- 2. NRC email dated November 8, 2012, RAI on the Review of 10 CFR 50.46 30-day Report (ML12313A440)
- 3. AREVA letter dated December 6, 2012, Generic RAI Response to a 30-Day 10 CFR 50.46 Report of Significant PCT Change, (AREVA Letter NRC:12:062) (ML12342A381)
- 4. Entergy letter dated December 17, 2012, Response to Request for Additional Information Related to 10 CFR 50.46 30 Day Report (1CAN121203) (ML12353A489)
- 5. NRC email dated March 21, 2013, Request for Additional Information - TAC No. ME9719 (ML13080A350)
- 6. AREVA letter dated March 28, 2013, Generic RAI Response to a 30-Day 10 CFR 50.46 Report of Significant PCT Change, (AREVA Letter NRC:13:014)
- 7. Entergy letter dated April 10, 2013, Response to Request for Additional Information (1CAN041301) (ML13101A267)
- 8. NRC email dated August 20, 2013, RAI No. 3 regarding ANO-1 30-day report for ECCS model changes pursuant to the requirements of 10 CFR 50.46(a)(1)(i) (ML13232A354)
1CAN101305 Page 2 of 3
Dear Sir or Madam:
Entergy Operations, Inc. (Entergy) submitted a 30-day report to inform the NRC of two errors in the Arkansas Nuclear One, Unit 1 (ANO-1) Emergency Core Cooling System evaluation model (Reference 1). The errors resulted in no net changes to the Peak Clad Temperature calculated for the Large Break Loss-of-Coolant Accident. Each individual error as well as the sum of the absolute values of the two errors is greater than the requirement of 10 CFR 50.46.
On reviewing the submittal, the NRC staff requested additional information (RAI) to continue the review and issued Reference 2. References 3 and 4 provided the responses to the request.
Reference 5 provided the NRCs subsequent RAI. In response to this RAI, AREVA has prepared a generic response to address these questions. This response is provided by Reference 6. ANO-specific response was provided by Reference 7.
Subsequently, the NRC transmitted an additional RAI regarding References 1 and 4 (Reference 8). The purpose of this submittal is to provide a response to the RAI.
This submittal contains no regulatory commitments.
Should you have any questions, please contact me.
Sincerely, Original signed by Stephenie L. Pyle SLP/rwc
Attachment:
Response to Request for Additional Information Regarding 30-Day Response for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46(a)(1)(i)
1CAN101305 Page 3 of 3 cc: Mr. Steven A. Reynolds Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852
ATTACHMENT TO 1CAN101305 Response to Request for Additional Information Regarding 30-Day Response for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46(a)(1)(i)
Attachment to 1CAN101305 Page 1 of 2 Response to Request for Additional Information Regarding 30-Day Response for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46(a)(1)(i)
Request for Additional Information By letter dated March 20, 2012 ((Agencywide Documents Access and Management System (ADAMS) Accession No. ML12080A120), Entergy Operations, Inc. the licensee for Arkansas Nuclear One, Unit 1 (ANO-1) sent a notice reporting a change or error discovered in an evaluation model or in the application of such a model that affects the peak cladding temperature calculation. This report was submitted pursuant to the requirements of 10 CFR 50.46, which requires, in part, that licensees report a change in the evaluation model used resulting in a significant change in PCT (greater than 50°F). The intent of this requirement is to enable the staff to establish the safety significance of this change (See FR Volume 53, No. 180, pp. 35996-36005).
On October 15, 2012, the staff issued a Request for Additional Information (RAI) to the licensee (ADAMS Accession Number ML12279A036) regarding the 30-day report which stated the following:
10 CFR 50.46(a)(3)(ii) states: " ... If the change or error is significant, the applicant or licensee shall provide this report within 30 days and include with the report a proposed schedule for providing a reanalysis or taking other action as may be needed to show compliance with 50.46 requirements ... "
The PCT for LBLOCA for Arkansas Nuclear One, Unit 1, has changed by an absolute value of 160°F since the analysis was performed.
Simply reporting the changes and errors in the methodology does not satisfy the intent of the regulation.
The licensee responded to the RAI on December 17, 2012 (ADAMS Accession Number ML12353A489). The RAI response does not include a proposed schedule for providing a reanalysis. In the response, the licensee states that the PCT error evaluations are supported by explicit analyses using the B&W plant ECCS evaluation model. Since a schedule for reanalysis was not provided, justify how generic analysis for the B&W plant ECCS evaluation model constitutes taking other action to show compliance with Section 50.46. In particular, while the submitted RAI response addresses the acceptance criteria contained in 10 CFR 50.46(b), the response does not address the requirement, at 10 CFR 50.46(a)(1)(i), to calculate ECCS cooling performance in accordance with an acceptable evaluation model. In light of the presently reported, significant, estimated effects of errors and changes, explain how the present ECCS cooling performance has been calculated in accordance with an acceptable evaluation model, such that any other action, as provided in 10 CFR 50.46(a)(3), has been taken to show compliance with 10 CFR 50.46 requirements, including those contained in 10 CFR 50.46(a)(1).
1CAN101305 Page 2 of 2
Response
The evaluation that supports the 2012 10 CFR 50.46 Loss of Coolant Accident (LOCA)
Report for Babcock & Wilcox (B&W) Plants denotes other actions taken to show compliance with 10 CFR 50.46 requirements. The evaluation demonstrated the requirements of 10 CFR 50, Appendix K for a conservative model were fully met based on a reported estimated net zero change in peak clad temperature (PCT). The evaluation concluded the actual net PCT would decrease; therefore, the existing model results remain conservative and acceptable. As the reported net PCT did not change, local oxidation and whole core hydrogen generation from the original model are unaffected and remain in compliance. In addition, the coolable core geometry and long-term cooling impacts remain unchanged and fully meet 10 CFR 50.46(b) requirements. Emergency Core Cooling System (ECCS) cooling performance was calculated with errors corrected and this result comes from an acceptable evaluation model that complies with 10 CFR 50.46(a)(1)(i) and 50.46(a)(1)(ii). The analytical technique used approximates realistically the behavior of the reactor system during a loss-of-coolant accident. As such, there is a high level of probability that the criteria will not be exceeded.
In lieu of submitting a proposed schedule for providing a reanalysis, the actions already taken as described above are considered sufficient to satisfy the intent of 10 CFR 50.46(a)(3)(ii), specifically or taking other action as may be needed to show compliance with 10 CFR 50.46 requirements.