Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))31 March 2011Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)31 March 2011Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)
TAC:ME345328 March 2011
ML11102045728 March 2011Schedule Extension to Implement License Amendment No. 234
ML11087102628 March 2011Certificate of Service for Pilgrim Watch Post-Hearing Memorandum
ML11087106828 March 2011Watch Post-Hearing MemorandumAging Management
Chernobyl
ML11070001328 March 2011Request for Withholding Information from Public Disclosure - Pilgrim Nuclear Power Station Revised TSs for Setpoint Tolerance Increase Dated March 15, August 30, September 21, 2010, and January 31, 2011 - GEH Proprietary Documents
ML11065000928 March 2011Issuance of Amendment No. 235 Revised Technical Specifications for Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety ValvesSafe Shutdown
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
MELLLA
Fire Protection Program
Weak link
IR 05000293/201120224 March 2011FOF Inspection Report 05000293-11-202 - Cover LetterAffidavit
ML11082024323 March 2011Renewal Hearing - Review Request: Draft Conference Call Summary 2/24Aging Management
TAC:ME585721 March 2011
ML11075040521 March 2011Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements
ML11077002516 March 2011License Renewal Application Annual Update Supplemental InformationAging Management
ML11077002616 March 2011License Renewal Application Supplemental InformationCoatings
Aging Management
ML11071000212 March 2011Watch Memorandum Regarding Fukushima
ML11070032911 March 2011NRC Staff Submittal to the Board and All Entities on the Attached Service List the Enclosed Decision in Entergy Nuclear Vermont Yankee, L.L.C. and Entergy Nuclear Operations, Inc., CLI-11-02Aging Management
Open House
ML11069125910 March 2011NRC Staff Supplement 40 to Hearing File Index
ML1107406999 March 2011Transcript of Hearing Regarding Pilgrim Nuclear Power Station in Plymouth, Massachusetts on 03/09/3011, Pages 784-1018Probabilistic Risk Assessment
Aging Management
Chernobyl
ML1107406976 March 2011Exhibit 2 - Pilgrim Watch Closing Argument on Threshold Issue of Contention 3 (February 3, 2011 Order)
ML1106305784 March 2011NRC Staff'S Proposed Findings of Fact and Conclusions of Law, and Order in the Form of an Initial DecisionProbabilistic Risk Assessment
Aging Management
Environment Report
Backfit
ML1106304424 March 2011Watch Findings of Fact Conclusions of Law Sama RemandHigh winds
License Renewal
Backfit
Affidavit
ML1107400394 March 2011Relief Request PRR-21, Application of NRC Approved In-Service Inspection of Pilgrim Relief Request PRR-19, (Jet Pump Instrumentation Nozzle Weld RPV-N9A-1 Repair Plan) for Reactor Pressure Vessel N14-1, N14-NV..Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML1106305794 March 2011Entergy'S Proposed Findings of Fact and Conclusions of Law on Meteorological Matters Raised in Pilgrim Watch Contention 3Probabilistic Risk Assessment
Aging Management
License Renewal
Affidavit
ML1106304404 March 2011Certificate of Service for Pilgrim Watch Findings of Fact and Conclusions of Law, SAMA Remand
IR 05000293/20100014 March 2011Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2010001)Aging Management
License Renewal
ML1106101873 March 2011Request for Additional Information to Support the Review of Pilgrim Nuclear Power Station Cyber Security Plan (Id: 2.10.034)Cyber Security
ML1106203633 March 2011Memorandum and Order (Ruling on Timeliness of Mean Consequence Values Issue)License Renewal
Affidavit
IR 05000293/20114031 March 2011EA-10-237, Pilgrim - Final Significance Determination for a Security-Related Greater than Green Finding and Notice of Violation (NRC Inspection Report No. 05000293-11-403)Affidavit
ML1106107361 March 2011Fitness-for-Duty Program Annual Performance Data Report for the Period January 2010 - December 2010Fitness for Duty
Fatigue Rule
ML11055072124 February 2011Certificate of Service for Pilgrim Watch Reply to Entergy'S and the NRC Staff'S Oppositions to Pilgrim Watch'S Request for Hearing on a New Contention
ML11070051324 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/13/2010
Press Release-I-11-004, Licensing Board Grants Motion Expediting March 9th Proceedings Plymouth, Mass., on Pilgrim License Renewal Contention24 February 2011Press Release-I-11-004: Licensing Board Grants Motion Expediting March 9th Proceedings Plymouth, Mass., on Pilgrim License Renewal ContentionAging Management
ML11055072224 February 2011Watch Reply to Entergy'S and the NRC Staff'S Oppositions to Pilgrim Watch'S Request for Hearing on a New ContentionHigh winds
Anticipated operational occurrence
Incorporated by reference
Aging Management
ML11054071523 February 2011Revised Notice and Order (Regarding Hearing and Oral Argument)
ML10340069223 February 20112.206 Response to Mary Lampert Letter Inaccessible Cables and Hydrogeological Assessment at PilgrimAging Management
ML11054065623 February 2011NRC Staff Supplement 39 to Hearing File and Mandatory Disclosures
ML11056023623 February 2011Renewal Hearing - Pilgrim Buried Pipe Draft RAI
ML11053028822 February 2011Order (Addressing Joint Motion, Motion in Limine, Proposed Findings of Fact and Conclusions of Law/Concluding Statements of Position, and Argument to Be Held March 9, 2011)Probabilistic Risk Assessment
License Renewal
Affidavit
ML11056023122 February 2011Renewal Hearing - Pilgrim Follow-up
ML11061039718 February 2011Marked-up and Re-typed Technical Specification and Bases Pages for the Proposed License Amendment Related to Setpoint and Setpoint Tolerance Increases for Safety Relief Valves (SRV) and Spring Safety Valves (Ssv).Safe Shutdown
Pressure boundary leak
Fire Protection Program
ML11055013918 February 2011Transcript of Pre-Hearing Conference: Pilgrim Nuclear, on February 18, 2011, Pages 754 -783
Press Release-I-11-002, Licensing Board to Hold Evidentiary Hearing on March 9th in Plymouth, Mass., on Pilgrim License Renewal Contention16 February 2011Press Release-I-11-002: Licensing Board to Hold Evidentiary Hearing on March 9th in Plymouth, Mass., on Pilgrim License Renewal Contention
ML11047033816 February 2011Joint Motion Requesting Resolution of Contention 3 Meteorological Issues on Written Submissions
ML11046048715 February 2011Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades
ML11046056215 February 2011Renewal Hearing - Modified RAI
ML11004041915 February 2011Summary of Telephone Conference Call Held on December 6, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operating, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application (Tac No. MC9669)Aging Management
ML11054033015 February 2011Response to Request for Additional Information (Rai), Dated January 5, 2011 on the Cyber Security PlanCyber Security
ML11048005415 February 2011Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades
ML11046003515 February 2011Renewal Hearing - Pilgrim: Draft RAIsAging Management
ML11045031414 February 2011Certificate of Service for Pilgrim Watch Reply to NRC Staff'S Answers Opposing Pilgrim Watch Amended Contention in Its Reply to Entergy'S and NRC Staff'S Answers Opposing Pw'S January 14, 2011 Request for Hearing on New Contention (February