~Entergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 March 1,2011 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.
50-293 License No.
DPR-35 Fitness-for-Duty Program Annual Performance Data Report For the Period January 2010 - December 2010 LETTER NUMBER: 2.11.014
Dear Sir or Madam:
This letter transmits the Pilgrim Nuclear Power Station (PNPS) Fitness-for-Duty Program Annual Performance Data Report for the period from January 2010 through December 2010 in accordance with the requirements of 10 CFR 26.717(e). This letter also transmits Single Positive Test Forms (SPTF) and data for the Fatigue Management Program, for the same period in accordance with 10 CFR 26.203(e).
There are no regulatory commitments made in this letter.
If you have any questions, please contact the undersigned at 508-830-8403.
Very truly yours, Joseph R. Lynch Licensing Manager JRL/ rmb Attachments: 1. Pilgrim 2010 Performance Data Report and Single Positive Test Forms (8 pages)
- 2. Pilgrim 2010 Fatigue Management Program Performance Data Report (1 page)
Y6~Q9j KI~I&
Fitness-for-Duty Program Annual Performance Data Report For the Period January 2010 - December 2010 Letter 2.11.014 Page 2 of 2 cc:
Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 (w/o Attachments)
Sr. Resident Inspector, Pilgrim Station Mr. Richard V. Guzman, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 Letter 2.11.014 Pilgrim 2010 Performance Data Report and Single Positive Test Forms (8 pages)
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Fitness-For-Duty Program Performance Data Report For the Period January through December 2010 INTRODUCTION 10 CFR 26.717(e) requires that nuclear power plant licensees periodically collect, compile and submit Fitness-for-Duty program performance data. Specifically, this performance data must include:
- 1.
The random testing rate;
- 2.
Drugs for which testing is conducted and cutoff levels, including results of tests using lower cutoff levels, tests for drugs not included in the Department of Health and Human Services (HHS) panel, and any special analyses of dilute specimens permitted.;
- 3.
Populations tested;
- 4.
Numbers of tests administered and results of those tests sorted by population tested (i.e., individuals in applicant status, permanent licensee employees, contractor/ vendor, etc.);
- 5.
Conditions under which the tests were performed (i.e., pre-access, for cause, post-event, follow-up, and random);
- 6.
Substances identified;
- 7.
Number of subversion attempts by type;
- 8.
Summary of management actions; and
- 9.
A summary of all instances during the calendar year when the licensee waived the work hour controls; and a summary of corrective actions, if any, resulting from the analyses of these data, including fatigue assessments. [Reference 10 CFR 26.203(e)]
Fitness-for-Duty program performance data for Entergy's Pilgrim Nuclear Power Station for the period January through December 2010 are provided below and in the attached tables. Data on random testing rate and a summary of management actions (items 1 and 8) are given below. Data for the remaining items (2, 3, 4, 5, 6 and 7) are given in the attached tables (Enclosure 1). The data for Fatigue Management Program Annual Performance Report (item 9, in Enclosure 2), for the period from January thru December 2010 is also included.
An additional section not required by 10 CFR 26 is included in this report. The additional section summarizes events related to Pilgrim Station's Fitness-For-Duty program and lessons learned.
RANDOM TEST RATE For the entire year of 2010, a total of 52.87% of the workforce was tested.
SUMMARY
OF MANAGEMENT ACTIONS Entergy used the definition of "Management Actions" implicit in Subpart D ("Management actions and sanctions to be imposed") to determine the content of this section.
Pre-Access Testinq During this period, a total of one hundred and eighty (180) pre-access tests were administered. The breakdown is sixty seven (67) licensee employees, zero (0) long term contractors and one hundred thirteen (113) short term contractors. None of the licensee employees tested positive. Of the short term contractors, two (2) tested positive for marijuana and were denied access to all Entergy plants for a minimum of three (3) years.
Random Testing A total of four hundred and fifty seven (457) random tests were performed. Four hundred and two (402) were licensee employees and fifty five (55) were short term contractors.
There were no positive random tests.
For Cause Testing One (1) for-cause test was performed. This was a licensee employee and was conducted based upon observed behavior. The test result was negative.
Follow-up Testing A total of six (6) follow-up tests were performed during this period. Four (4) of these were for one (1) licensee employee; the other two (2) were short term contractors. All of the results were negative.
Post Event There was one (1) post event test conducted on a licensee employee. There were three (3) post event tests conducted on short term contractors. None of these tests were positive.
Other This category includes tests repeated because the results of the specimen were negative, but the specimen was determined by the laboratory to have either a low specific gravity or a low concentration of creatinine. Since the inception of the new rule, there have been no specimens repeated since the testing is now conducted to the lowest level of detection (LOD) by the laboratory and determined to be negative.
Events Reported There were no events during this time period that required reporting to the NRC. No performance indicators were identified during this period.
Lessons Learned and Program Events There were no notable lessons learned or program events identified during this period.
Fitness For Duty Program Annual Performance Data Report - Personnel Subject to IOCFR26 Section I - Company Data Company: Entergy - Pilgrim Station Annual Report Period: 01/01/2010 To 12/31/2010 Location: Entergy - Pilgrim Station 600 Rocky Hill Road Drugs Tested For Screen/Confirmation ng Plymouth, MA 02360 Marijuana 50/15 Cocaine 300/150
Contact:
Dave Burke Opiates 2000/300 Security Manager Amphetamines 1000/500 Phencyclidine 25/25 Alcohol (%BAC) 0.04% BAC Phone:
(508) 830-8320 Random Testing Rate Not Less Than 50% Annually Section II - Testing Results Licensee Employee Long-Term Contractor Short-Term Contractor Total Avg. Workforce
_2-K Category Tested Positive Tested Positive Tested Positive Tested Positive FOLLOW-UP 4
0 0
0 2
0 6
0 FOR-CAUSE 1
0 0
0 0
0 1
0 POST EVENT 1
0 0
0 3
0 4
0 PRE-ACCESS 67 0
0 0
113 2
180 2
RANDOM 402 0
0 0
55 0
457 0
Total 475 0
0 0
173 2
648 2
Section III - Breakdown of Confirmed Positive Tests for Specific Substances Alcohol Ampheta-Cocaine Marijuana Marijuana Opiates Opiates Phenycli-Refused Total mines 50 100 300 2000 dine CONTRACTOR 0
0 0
2 0
0 0
0 0
2 LICENSEE EMPLOYEE 0
0 0
0 0
0 0
0 0
0 Total 0
0 0
2 0
0 0
0 0
2 Note: Discrepancies in the totals in this section versusSection II indicate that one or more tests detected multiple drugs.
Refer to Section III for the declaration of these tests and their corresponding drugs.
Generated on 2/9/2011 Page 1 of 2
Section IV - Random Testing Results For Year 52.87 %
Section V - Dilute Results Special analysis of dilute specimens permitted under 26.163 (a) (2)
Dilute Total:
0 Section VI - Subversion Attempts Physical Evidence Refusal To Cooperate Observed Actions Others Total CONTRACTOR 0
0 0
0 0
LICENSEE EMPLOYEE 0
0 0
0 0
0 0
0 0
0 Section VII - Management Actions 14 Day Terms 1 Year Denial 3 Year Denial 5 Year Denial Permanent Total CONTRACTOR 0
0 2
0 0
2 LICENSEE EMPLOYEE Total 0
0 2
0 0
2 Generated on 219/2011 Page 2 of 2
AUtriT1rp li b n~-we USR 0
1-6 NRC FFD Program Performance Data Reporting System Single Positive Test Form for the EIE General Submission Portal Nato:
Unique Reference Number (Licensee Supplied) PNP-2010-002
- 1) All fields are required except those marked 'optional' 1
- 12)
Entries in some form fields may result in Information Submission Update - check this box only if this is an update to a previous submission, in being auto-populated into other form fields.
which case you must use the same Unique Reference Number.
- 3) Use Adobe Reader 8 or later for this form to work Select Facility
- properly, Pilgrim [50-293]
Date of Collection (mm/dd/yyyy) 121 /2010 Reason for Testing - 26.717(b)(5)
Pre-Access Testing Reason (optional)
Pre-Access I
FInitial Authorization Employment Type-26.717(b)(3)
Contractor/Vendor Labor Category - 26.717(b)(3)
Please elaborate ther Snow Plow Diver Refusal - 26.717(b)(7) & 26.75 Was this collection refused (Yes I No)?
Test Results - 26.717(b)(4)
Test Validity FV a id Test Type(s) for Result(s) Reported Alcohol Testing Drug and Alcohol jBreath Was this collection observed (Yes / No)? - 26.717(b)(7) & 26.1 Substance - 26.717(b)(2) & (b)(4)
Additional Substance (as applicable)
Marijuana 1131ease Select
]
I Drug Testing Additional Substance (as applicable)
Please Select Use NRC Cutoff (Yes I No) Yes Use NRC Cutoff (Yes I No)
I'*
Use NRC Cutoff (Yes I No)*
Is this a 24-Hour Reporting Event (Yes/No)? - 26.719(b)
No Subversion Attempts - 26.717(b)(7) and 26.75(b)
If this result relates to a subversion attempt, select one or more of the following choices as applicable.
If not a subversion attempt. do not select any of the four boxes.
Physical Evidence Observed Actions/Behaviors 0
13 Refusal to Cooperate 0
Other 0
Management Actions - 26.717(b)(8)
Individual Sanction 3-Year Denial Reason(s) for the Action (select all that apply):
Dg MRO Confirmation 0
First drug or alcohol positive 0
Resignation/Withdrawal O Subversion 0
Subsequent positive test result from testing O Misuse 0
Violation of 5-hour abstinence rule
[]
Other.
0 Sale. Use or Possession in PA Person(s) Responsible for Information Provided Person I (required):
Dian Wilson
]Securty Coordinator dwilso3@entergy..om First Name Last Name Position Title Email Address Person 2 (op ti onal):
First Name Last Name Position Tile Email Address Final Step (Required) - NRC will consider this form an official submission only when the Validate & Lock' button has been selected and all errors (i.e., those highlighted in red) have been corrected. The 'Validate & Lock" button will change to "Locked' after the data validation process has been successfully completed and the form is ready for submission.
Form Locked On: IFeb 23, 2011 at 8:33:39 AM J to L
oal I
singe potve
-Teo Formverx 1.-24
U SA R S
'pet; I*ol 0
~
i th 0yioni NRC FFD Program Performance Data Reporting System Single Positive Test Form for the EIE General Submission Portal Note:
edPNP
-2010 -001 I) All fields are required except those marked oplional'.
U
- 2) Entries in some form fields may result in Information Submission Update - check this box only if this is an update to a previous submission, in being auto-populated itnto other form fields.
which case you must use the same Unique Reference Number.
- 3) Use Adobe Reader 8 or later for this form to work Select Facility properly.
Pilgrim 150-293]
]
Date of Collection (mm/dd/yyyy)l06/17/2010 Reason for Testing-26.717(b)(5)
Pre-Access Tes:
Pre-Access ilnitial Authori Employment Type-26.717(b)(3)
Contractor/Vendor Labor Category-26.717(b)(3)
Please elaborate Othr alpersnforc Refusal - 26.717(b)(7) & 26.75 Was this collection refused (Yes / No)?
ting Reason (optional) zation redit Union Branch at Staetson Test Results - 26.717(b)(4)
Test Validity lValid Test Type(s) for Result(s) Reported Alcohol Testing Drug and Alcohol Breath]
Was this collection observed (Yes a No)? - 26.717(b)(7) & 26.1 Substance - 26.717(b)(2) & (b)(4)
Additional Substance (as applicable)
IMrijuana I
1Pleaseselect Z
Drug Testing Urine Additional Substance (as applicable)
Please Select Use NRC Cutoff (Yes / No) Yen Use NRC Cutoff (Yes / No)I*'*
Use NRC Cutoff (Yes I No)
Is this a 24-Hour Reporting Event (Yes/No)? - 26.719(b)
Subversion Attempts-26.717(b)(7) and 26.75(b)
If this result relates to a subversion attempt, select one or more of the following choices as applicable.
If not a subversion attempt do not select any of the four boxes.
Physical Evidence Observed Actions/Behaviors 01 11 Refusal to Cooperate 11 Other 01 Management Actions - 26.717(b)(8)
Individual Sanction 3-Year Denial Reason(s) for the Action (select all that apply):
0 MRO Confirmation 0
First drug or alcohol positive n
Subversion 0
Misuse 0
Violation of 5-hour abstinence rule 0
Sale, Use or Possession in PA 0
Resignation/Withdrawal El Subsequent positive test result from testing o Other.
Person(s) Responsible for Information Provided Person I (required):
Di.n.n. e,.
I Io secutoordinator IZ d.so3@onteergy.com First Name Last Name Position Tide Email Address Person 2 (optional):
First m
Name Last Name Position Tile Email Address Final Step (Required) - NRC will consider this form an official submission only when the "Validate & Lock" button has been selected and all errors (i.e., those highlighted in red) have been corrected. The "Validate & Lock" button will change to "Locked" after the data validation process has been successfully completed and the form is ready for submission.
Form Locked On:lFeb 23, 2011 at 8:29:34 AM S[".to,,
ca.PK.thl*slRep.p.t you -navm lam,0~ 0010100 OttO
ý
-All.
_-ý I
S=ngle v'ow Towl -om verw-n i.2-24 Letter 2.11.014 Pilgrim 2010 Fatigue Management Program Performance Data Report (1 page)
Fatigue Rule Waivers Issued for 2010 Facility: Pilgrim Nuclear Power Station Period of Report: 1/1/2010 - 12/31/2010 Facility Outage During Report Period: No WORK HOUR LIMIT OPERATIONS MAINTENANCE SECURITY HP / RADPRO CHEMISTRY FIRE BRIGADE (B)
Online Outage Online Outage Online Outage Online Outage Online Outage Online Outage 16h max in 24h 1
0 11 0
0 0
0 0
0 0
0 0
26h max in 48h 0
0 11 0
0 0
0 0
0 0
0 0
72 max in 7d 0
0 5
0 0
0 0
0 0
0 0
0 Rest Breaks:.
Online Outage Online Outage Online Outage Online Outage Online Outage Online Outage 1 Oh between work periods 2
0 2
0 0
0 0
0 0
0 0
0 34h in any 9-days 0
0 2
0 0
0 0
0 0
0 0
0
,Minimum Oays.ff-Qnlin..
i ý.
1 MVDO /wk; 8h shift 0
0 0
0 0
0 2 MDO/wk; 10h shift 0
1 0
0 0
0 2 a__DO /wk; 12 hr shift_
0_
2.5 MDO/wk; 12 hr shift0 0
0 0
0 3 MVDO /wk; 12 hr shift NNEAMAE FA*
m 6
.Minimum'Days Off 4....
0u e'i J'..*
° SMDO days (rolling) 00 3 MDO 15 day period 0
0 0
0 4 aVD O / 15 d a y p e rio d O M N I,,
NUMBER OF WAIVERS PER INDIVIDUAL EMPLOYEE C)
NUMBER OF WAIVERS OPERATIONS MAINTENANCE SECURITY HP /RADPRO CHEMISTRY FIRE BRIGADE (13) 6 1
7 6
0 0
0 2
1 5
0 0
0 0
3 0
1 0
0 0
0 4
0 2
0 0
0 0
5 0
0 0
0 0
0 6
0 0
0 0
0 0
Highest number of waivers for 2
4 1
0 0
0 an individual employee I
I I
II