Schedule Extension to Implement License Amendment No. 234
ML111020457
Person / Time
Site: Pilgrim
Issue date: 03/28/2011
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.11.024
Download: ML111020457 (1)


Text

Entergy Nuclear Operations, Inc.

'w Entergy Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Safety Assurance March 28, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Schedule Extension to Implement Pilgrim License Amendment No. 234

REFERENCES:

1. NRC Letter, "Pilgrim Nuclear Power Station-Issuance of Amendment Regarding Pressure and Temperature (P-T) Limit Curves and Relocation of P-T Curves to the Pressure and Temperature Limits Reporf' (TAC No. ME3253), dated January 26, 2011 LETTER NUMBER: 2.11.024

Dear Sir or Madam,

NRC issued License Amendment No. 234 on January 26, 2011, (Reference 1) with a 60-day implementation schedule. Accordingly, the implementation must be completed on or before March 27, 2011. By this letter, Entergy requests a 30-day extension to complete the implementation of the Amendment.

Pilgrim licensing staff has informed the NRC Project Manager on or about March 23, 2011 that Pilgrim would require an additional 30 days to complete the implementation of License Amendment 234. This is due to resource impacts of the forced outage in February 2011 and on-going refueling outage (RFO)-18 preparations. The requested 30-day extension does not impact current Pilgrim operation until the shutdown for RFO-18 because the existing P-T curves in the Technical Specification are valid for the remaining operating cycle until the plant is shut down for RFO-18.

There are no commitments made in this submittal.

If you have any questions, please call Mr. Joseph Lynch, Pilgrim Licensing Manager at 508-830-8403.

Sincerely, Step N. Sy Director, Nuclear Safety Assurance cc: Regional Administrator, Region 1 Mr. Richard Guzman, Project Manager U.S. Nuclear Regulatory Commission Plant Licensing Branch I-1 475 Allendale Road Office of Nuclear Reactor Regulation King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission One White Flint North, O-8C2 Senior Resident Inspector 11555 Rockville Pike Pilgrim Nuclear Power Station Rockville, MD 20852 M_?I