Issue date | Title | Topic | |
---|---|---|---|
RA-11-004, Brunswick Unit 1 & 2, Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report | 31 March 2011 | Brunswick Unit 1 & 2, Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report | |
ML110900413 | 31 March 2011 | Notification of Inspection and Request for Information for NRC PI&R Inspection | Probabilistic Risk Assessment Operator Manual Action Operability Determination Maintenance Rule Program |
ML110910508 | 31 March 2011 | NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 0 (Part 2) | Safe Shutdown Fire Barrier Large early release frequency Maintenance Rule Program Fire Protection Program Fire Watch |
ML110950366 | 31 March 2011 | Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report | |
ML110890209 | 30 March 2011 | Notice of Meeting with Shearon Harris Nuclear Plant to Discuss Human Improvement Plan and to Introduce New Site Management Team | |
TAC:ME5970 | 30 March 2011 | ||
RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 | 30 March 2011 | Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 | Incorporated by reference Stolen Affidavit |
TAC:L24550 | 30 March 2011 | ||
HNP-11-033, Withdrawal of Application for Revision to Technical Specification Core Operating Limits Report (COLR) References for Realistic Large Break LOCA (Rlbloca) Analysis | 28 March 2011 | Withdrawal of Application for Revision to Technical Specification Core Operating Limits Report (COLR) References for Realistic Large Break LOCA (Rlbloca) Analysis | |
ML110800487 | 21 March 2011 | Notice of Meeting with Carolina Power & Light Co. to Discuss NRC Reactor Oversight Process Annual Assessment of the Shearon Harris Nuclear Plant | Open House |
ML110770514 | 14 March 2011 | Notification of Licensed Operator Initial Examination 05000400-11-302 | |
ML110730671 | 9 March 2011 | Shearon Harris Nuclear Plant, NRC Emergency Preparedness Annual Inspection Report 05000400-10-502 | |
IR 05000400/2010502 | 9 March 2011 | ||
ML110630456 | 4 March 2011 | Annual Assessment Letter - Shearon Harris Nuclear Power Plant (Report 05000400-11-001) | |
ML110630459 | 4 March 2011 | EOC Report 22, Inspection/Activity Plan, 03/01/2011 - 06/30/2012 | |
RA-11-009, Independent Spent Fuel Storage Installation, Crystal River, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2, Independent Spent Fuel Storage Installation - NRC Correspondence Distribution List Update | 2 March 2011 | Independent Spent Fuel Storage Installation, Crystal River, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2, Independent Spent Fuel Storage Installation - NRC Correspondence Distribution List Update | License Renewal |
ML110610794 | 1 March 2011 | Requalification Program Inspection Shearon Harris Nuclear Plant | |
ML110670686 | 28 February 2011 | Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 - Response to Request for Additional Information on the Carolina Power and Light Company and Florida Power Corporation Cyber Security Plan, Revision 0 | Cyber Security Cyber attack |
ML110590577 | 28 February 2011 | Email Attachment, Rlbloca Round 2 RAIs Qs | Fuel cladding |
ML110590620 | 28 February 2011 | E-mail, Rlbloca Round 2 RAIs Qs | |
RA-11-005, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 - Response to Request for Additional Information on the Carolina Power and Light Company and Florida Power Corporation Cyber Security Plan, Re | 28 February 2011 | Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 - Response to Request for Additional Information on the Carolina Power and Light Company and Florida Power Corporation Cyber Security Plan, Rev | Cyber Security Cyber attack |
HNP-11-020, NRC Correspondence Distribution List Update | 24 February 2011 | NRC Correspondence Distribution List Update | |
RA-11-006, Onsite Property Insurance Coverage | 23 February 2011 | Onsite Property Insurance Coverage | |
ML110550211 | 22 February 2011 | Annual Report Form for Drug and Alcohol Tests, for Period 2010 | |
ML110550223 | 21 February 2011 | Single Positive Test Form, for Other, Collected on 06/29/2010 | |
ML110550230 | 21 February 2011 | Single Positive Test Form, for Other, Collected on 09/16/2010 | |
ML110530084 | 18 February 2011 | E-mail, Acceptance Review of ME5409 and ME5410 Application for Revision of TS 5.3.1 and COLR References for M5 Cladding: 1/13/11 | |
ML110530079 | 18 February 2011 | E-mail, Acceptance Review of ME5410, Application for Exemption for M5 Cladding: 1/19/11 | Exemption Request |
TAC:ME5410 | 18 February 2011 | ||
ML11243A122 | 16 February 2011 | Attachment 1, Response to Request for Additional Information Regarding License Amendment Request Measurement Uncertainty Recapture Power Uprate, HNP Calculation HNP-I/INST-1010, Rev. 4 | Boric Acid Anticipated operational occurrence Hydrostatic Operability Determination Grace period Power Uprate Measurement Uncertainty Recapture Negative Flux Rate Trip |
ML110550215 | 16 February 2011 | CFR Part 26, Subpart I - Managing Fatigue, for the Period Ending 2010 | |
ML110550224 | 16 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 08/17/2010 | |
ML110550226 | 16 February 2011 | Single Positive Test Form, for Random, Collected on 09/02/2010 | |
ML110550231 | 16 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 09/29/2010 | |
ML110550234 | 16 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 09/27/2010 | |
ML110550237 | 16 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 09/29/2010 | |
ML110550240 | 16 February 2011 | Single Positive Test Form, for Random, Collected on 11/17/2010 | |
ML110550227 | 16 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 09/15/2010 | |
ML110550217 | 15 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 06/01/2010 | |
ML110550221 | 10 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 06/22/2010 | |
ML110550218 | 10 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 06/07/2010 | |
HNP-11-017, 90-Day Inservice Inspection (ISI) Summary Report | 10 February 2011 | 90-Day Inservice Inspection (ISI) Summary Report | |
ML110380497 | 8 February 2011 | Notice of Forthcoming Preapplication Meeting with Carolina Power & Light Company and Representatives Regarding Shearon Harris Nuclear Plant, Unit 1 | |
HNP-11-011, Annual Report in Accordance with Technical Specification 6.9.1.2 | 2 February 2011 | Annual Report in Accordance with Technical Specification 6.9.1.2 | |
HNP-11-016, NRC Correspondence Distribution List Update | 1 February 2011 | NRC Correspondence Distribution List Update | |
HNP-11-006, Updated Response to RAI Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. | 31 January 2011 | Updated Response to RAI Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. | Loop seal Mission time |
HNP-11-014, Notification of NPDES Permit Renewal Application | 31 January 2011 | Notification of NPDES Permit Renewal Application | Boric Acid Grab sample Hydrostatic Biofouling |
IR 05000400/2010005 | 28 January 2011 | IR 05000400-10-005; October 1, 2010 - December 31, 2010; Shearon Harris Nuclear Power Plant, Unit 1; Equipment Alignment, Maintenance Effectiveness, Plant Modifications, Post-Maintenance Testing, Surveillance Testing | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Time to boil Weld Overlay Internal Flooding Probabilistic Risk Assessment Temporary Modification Significance Determination Process Process Control Program Eddy Current Testing Liquid penetrant Pressure Boundary Leakage Fire Protection Program Inattentive Manual Operator Action |
HNP-11-013, Completion of Regulatory Commitment Regarding Relief Request I3R-08 | 27 January 2011 | Completion of Regulatory Commitment Regarding Relief Request I3R-08 | |