Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-11-004, Brunswick Unit 1 & 2, Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report31 March 2011Brunswick Unit 1 & 2, Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report
ML11090041331 March 2011Notification of Inspection and Request for Information for NRC PI&R InspectionProbabilistic Risk Assessment
Operator Manual Action
Operability Determination
Maintenance Rule Program
ML11091050831 March 2011NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 0 (Part 2)Safe Shutdown
Fire Barrier
Large early release frequency
Maintenance Rule Program
Fire Protection Program
Fire Watch
ML11095036631 March 2011Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report
ML11089020930 March 2011Notice of Meeting with Shearon Harris Nuclear Plant to Discuss Human Improvement Plan and to Introduce New Site Management Team
TAC:ME597030 March 2011
RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.5030 March 2011Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50Incorporated by reference
Stolen
Affidavit
TAC:L2455030 March 2011
HNP-11-033, Withdrawal of Application for Revision to Technical Specification Core Operating Limits Report (COLR) References for Realistic Large Break LOCA (Rlbloca) Analysis28 March 2011Withdrawal of Application for Revision to Technical Specification Core Operating Limits Report (COLR) References for Realistic Large Break LOCA (Rlbloca) Analysis
ML11080048721 March 2011Notice of Meeting with Carolina Power & Light Co. to Discuss NRC Reactor Oversight Process Annual Assessment of the Shearon Harris Nuclear PlantOpen House
ML11077051414 March 2011Notification of Licensed Operator Initial Examination 05000400-11-302
ML1107306719 March 2011Shearon Harris Nuclear Plant, NRC Emergency Preparedness Annual Inspection Report 05000400-10-502
IR 05000400/20105029 March 2011
ML1106304564 March 2011Annual Assessment Letter - Shearon Harris Nuclear Power Plant (Report 05000400-11-001)
ML1106304594 March 2011EOC Report 22, Inspection/Activity Plan, 03/01/2011 - 06/30/2012
RA-11-009, Independent Spent Fuel Storage Installation, Crystal River, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2, Independent Spent Fuel Storage Installation - NRC Correspondence Distribution List Update2 March 2011Independent Spent Fuel Storage Installation, Crystal River, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2, Independent Spent Fuel Storage Installation - NRC Correspondence Distribution List UpdateLicense Renewal
ML1106107941 March 2011Requalification Program Inspection Shearon Harris Nuclear Plant
ML11067068628 February 2011Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 - Response to Request for Additional Information on the Carolina Power and Light Company and Florida Power Corporation Cyber Security Plan, Revision 0Cyber Security
Cyber attack
ML11059057728 February 2011Email Attachment, Rlbloca Round 2 RAIs QsFuel cladding
ML11059062028 February 2011E-mail, Rlbloca Round 2 RAIs Qs
RA-11-005, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 - Response to Request for Additional Information on the Carolina Power and Light Company and Florida Power Corporation Cyber Security Plan, Re28 February 2011Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 - Response to Request for Additional Information on the Carolina Power and Light Company and Florida Power Corporation Cyber Security Plan, RevCyber Security
Cyber attack
HNP-11-020, NRC Correspondence Distribution List Update24 February 2011NRC Correspondence Distribution List Update
RA-11-006, Onsite Property Insurance Coverage23 February 2011Onsite Property Insurance Coverage
ML11055021122 February 2011Annual Report Form for Drug and Alcohol Tests, for Period 2010
ML11055022321 February 2011Single Positive Test Form, for Other, Collected on 06/29/2010
ML11055023021 February 2011Single Positive Test Form, for Other, Collected on 09/16/2010
ML11053008418 February 2011E-mail, Acceptance Review of ME5409 and ME5410 Application for Revision of TS 5.3.1 and COLR References for M5 Cladding: 1/13/11
ML11053007918 February 2011E-mail, Acceptance Review of ME5410, Application for Exemption for M5 Cladding: 1/19/11Exemption Request
TAC:ME541018 February 2011
ML11243A12216 February 2011Attachment 1, Response to Request for Additional Information Regarding License Amendment Request Measurement Uncertainty Recapture Power Uprate, HNP Calculation HNP-I/INST-1010, Rev. 4Boric Acid
Anticipated operational occurrence
Hydrostatic
Operability Determination
Grace period
Power Uprate
Measurement Uncertainty Recapture
Negative Flux Rate Trip
ML11055021516 February 2011CFR Part 26, Subpart I - Managing Fatigue, for the Period Ending 2010
ML11055022416 February 2011Single Positive Test Form, for Pre-Access, Collected on 08/17/2010
ML11055022616 February 2011Single Positive Test Form, for Random, Collected on 09/02/2010
ML11055023116 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/29/2010
ML11055023416 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/27/2010
ML11055023716 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/29/2010
ML11055024016 February 2011Single Positive Test Form, for Random, Collected on 11/17/2010
ML11055022716 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/15/2010
ML11055021715 February 2011Single Positive Test Form, for Pre-Access, Collected on 06/01/2010
ML11055022110 February 2011Single Positive Test Form, for Pre-Access, Collected on 06/22/2010
ML11055021810 February 2011Single Positive Test Form, for Pre-Access, Collected on 06/07/2010
HNP-11-017, 90-Day Inservice Inspection (ISI) Summary Report10 February 201190-Day Inservice Inspection (ISI) Summary Report
ML1103804978 February 2011Notice of Forthcoming Preapplication Meeting with Carolina Power & Light Company and Representatives Regarding Shearon Harris Nuclear Plant, Unit 1
HNP-11-011, Annual Report in Accordance with Technical Specification 6.9.1.22 February 2011Annual Report in Accordance with Technical Specification 6.9.1.2
HNP-11-016, NRC Correspondence Distribution List Update1 February 2011NRC Correspondence Distribution List Update
HNP-11-006, Updated Response to RAI Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors.31 January 2011Updated Response to RAI Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors.Loop seal
Mission time
HNP-11-014, Notification of NPDES Permit Renewal Application31 January 2011Notification of NPDES Permit Renewal ApplicationBoric Acid
Grab sample
Hydrostatic
Biofouling
IR 05000400/201000528 January 2011IR 05000400-10-005; October 1, 2010 - December 31, 2010; Shearon Harris Nuclear Power Plant, Unit 1; Equipment Alignment, Maintenance Effectiveness, Plant Modifications, Post-Maintenance Testing, Surveillance TestingSafe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Time to boil
Weld Overlay
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Process Control Program
Eddy Current Testing
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Inattentive
Manual Operator Action
HNP-11-013, Completion of Regulatory Commitment Regarding Relief Request I3R-0827 January 2011Completion of Regulatory Commitment Regarding Relief Request I3R-08
HNP-11-012, Completion of Regulatory Commitment Regarding Relief Request I3R-0627 January 2011Completion of Regulatory Commitment Regarding Relief Request I3R-06