MONTHYEARHNP-09-055, Application for Revision to Technical Specification Core Operating Limits Report References2009-07-21021 July 2009 Application for Revision to Technical Specification Core Operating Limits Report References Project stage: Request HNP-10-028, Response to Request for Additional Information Regarding Amendment to Allow the Use of Thermal-Hydraulic Analysis Code-RELAPS 5 for Non-LOCA Accident Transients2010-03-0303 March 2010 Response to Request for Additional Information Regarding Amendment to Allow the Use of Thermal-Hydraulic Analysis Code-RELAPS 5 for Non-LOCA Accident Transients Project stage: Response to RAI HNP-10-073, Additional Information Regarding Amendment to Allow the Use of Thermal-Hydraulic Analysis Code S-RELAP5 for Non-LOCA Accident Transients2010-07-28028 July 2010 Additional Information Regarding Amendment to Allow the Use of Thermal-Hydraulic Analysis Code S-RELAP5 for Non-LOCA Accident Transients Project stage: Other HNP-10-124, Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report (COLR) References for M5 Cladding2011-01-13013 January 2011 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report (COLR) References for M5 Cladding Project stage: Request ML1105300842011-02-18018 February 2011 E-mail, Acceptance Review of ME5409 and ME5410 Application for Revision of TS 5.3.1 and COLR References for M5 Cladding: 1/13/11 Project stage: Acceptance Review ML1105300792011-02-18018 February 2011 E-mail, Acceptance Review of ME5410, Application for Exemption for M5 Cladding: 1/19/11 Project stage: Request ML11250A1822011-09-0202 September 2011 NRR E-mail Capture - RAI Regarding TAC No. ME5409 (Harris-M5 Cladding) Project stage: RAI ML11276A1882011-10-0303 October 2011 NRR E-mail Capture - RAI Regarding TAC No. ME5409 (Harris-M5 Cladding) Project stage: Other HNP-11-090, Response to Request for Additional Information Regarding TAC No. ME5409 (Harris-M5TM Cladding)2011-10-0606 October 2011 Response to Request for Additional Information Regarding TAC No. ME5409 (Harris-M5TM Cladding) Project stage: Response to RAI ML11313A1622012-02-0606 February 2012 Environmental Assessment and Finding of No Significant Impact Project stage: Other ML11313A1632012-02-0606 February 2012 Federal Register Notice, Environmental Assessment and Finding of No Significant Impact Project stage: Other ML12025A1622012-02-24024 February 2012 Federal Register Notice - Exemption Regarding Use of M5 Alloy Fuel Rod Cladding Project stage: Other ML12025A1612012-02-24024 February 2012 Transmittal Letter - Exemption Regarding Use of M5 Alloy Fuel Rod Cladding Project stage: Other HNP-12-027, Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5(tm) Cladding Implementation Schedule2012-02-24024 February 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5(tm) Cladding Implementation Schedule Project stage: Request NRC-2012-0034, Federal Register Notice - Exemption Regarding Use of M5 Alloy Fuel Rod Cladding2012-02-24024 February 2012 Federal Register Notice - Exemption Regarding Use of M5 Alloy Fuel Rod Cladding Project stage: Other ML12080A2172012-03-20020 March 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages Project stage: Request ML12058A1332012-03-30030 March 2012 Issuance of Amendment the Use of Arevas M5 Advance Alloy in Fuel Cladding and Fuel Assembly Components Project stage: Approval 2011-10-06
[Table View] |
Text
From:
Mozafari, Brenda Sent:
Friday, February 18, 2011 12:36 PM To:
'Bass, Kimberly'; 'dave.corlett@pgnmail.com'; 'john.caves@pgnmail.com' Cc:
Lingam, Siva
Subject:
FW: Acceptance review of ME5409 and ME 5410 Application for revision ofTS 5.3.1 and COLR References for M5 Cladding. 1/13/2011 Importance:
High Acceptance review of ME5409 Application for revision ofTS 5.3.1 and COLR References for M5 Cladding. 1/13/2011 The purpose of this letter is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR),
an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2020 email: brenda.mozafari@nrc.gov