Annual Assessment Letter - Shearon Harris Nuclear Power Plant (Report 05000400-11-001)
ML110630456
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/04/2011
From: Musser R A
NRC/RGN-II/DRP/RPB4
To: Burton C L
Progress Energy Carolinas
Shared Package
ML110630451 List:
References
IR-11-001
Download: ML110630456 (5)


See also: IR 05000400/2011001

Text

March 4, 2011

Carolina Power and Light Company Mr. Christopher Vice President Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT: ANNUAL ASSESSMENT LETTER - SHEARON HARRIS NUCLEAR POWER PLANT (REPORT 05000400/2011001)

Dear Mr. Burton:

On February 9, 2011, the NRC staff completed its end-of-cycle performance review of the Shearon Harris Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2010 through December 31, 2010. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan. The NRC determined that overall, Shearon Harris operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan details the inspections scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. We also plan on conducting several infrequently performed inspections which include: initial operator licensing examinations and TI 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray System."

CPL 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (404) 997-4603 with any questions you may have regarding this letter.

Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63

Enclosure:

Harris Inspection/Activity Plan cc w/encl.: (See page 3)

CPL 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (404) 997-4603 with any questions you may have regarding this letter.

Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63

Enclosure:

Harris Inspection/Activity Plan cc w/encl.: (See page 3)

XG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE XG NON-SENSITIVE ADAMS: XG Yes ACCESSION NUMBER:Letter: ML110630456 Pkg.: ML110630451_ X SUNSI REVIEW COMPLETE RAM OFFICE RII:DRP RII:DRP SIGNATURE JGW1 RAM NAME JWorosilo RMusser DATE 03/01/2011 03/01/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: S:\DRP\PERIODIC ASSESSMENTS & REPORTS\EOC & MID-CYCLE\2010\END-OF-CYCLE\INPUTS\RPB4\HARRIS\2010 EOC LETTER HARRIS.DOC CPL 3 cc w/encl: Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc. Electronic Mail Distribution Vacant Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Donald L. Griffith, Training Manager Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc. Electronic Mail Distribution LaQuisha M. Parks, Manager Support Services Progress Energy Carolinas, Inc. Electronic Mail Distribution David H. Corlett, Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept. Progress Energy Service Company, LLC Electronic Mail Distribution Christos Kamilaris, Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Joseph W. Donahue, Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution W. Lee Cox, III, Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Robert P. Gruber, Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Herb Council, Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Sally Kost, Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998

CPL 4 Letter to Christopher from Randall A. Musser dated March 4, 2011

SUBJECT: ANNUAL ASSESSMENT LETTER - SHEARON HARRIS NUCLEAR POWER PLANT (REPORT 05000400/2011001) Distribution w/encl: C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC ROP Reports Institute of Nuclear Power Operations (INPO) RidsNrrPMShearonHarris Resource