UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVE N.E., SUITE 1200 ATLANTA, GEORGIA 30303 March 31, 2011 Mr. Christopher L. Burton Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Burton:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Shearon Harris reactor facility during the weeks of July 11 - 15 and July 25 - 29, 2011. The inspection team will be led by Mike King, a Senior Reactor Inspector from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Problem Identification and Resolution, issued on February 26, 2010.

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On March 31, 2011, Mr. King confirmed with Mr. John Caves of your staff, arrangements for the two-week onsite inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than June 27, 2011. Please contact Mr. King with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

CP&L 2 If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. King will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. King at (404) 997-4511.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 50-400 License Nos.: NPF-63

Enclosure:

INFORMATION REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION cc w/encl: (See page 3)

PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

ML110900413__ X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRP SIGNATURE MFK1 GTH1 NAME MKing GHopper DATE 03/31/2011 03/31/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

CP&L 3 cc w/encl: W. Lee Cox, III Brian C. McCabe Section Chief Manager, Nuclear Oversight Radiation Protection Section Shearon Harris Nuclear Power Plant N.C. Department of Environmental Progress Energy Commerce & Natural Resources Electronic Mail Distribution Electronic Mail Distribution Donald L. Griffith Public Service Commission Training Manager State of South Carolina Shearon Harris Nuclear Power Plant P.O. Box 11649 Progress Energy Columbia, SC 29211 Electronic Mail Distribution Chairman LaQuisha M. Parks North Carolina Utilities Commission Manager Electronic Mail Distribution Support Services Shearon Harris Nuclear Power Plant Robert P. Gruber Electronic Mail Distribution Executive Director Public Staff - NCUC David H. Corlett 4326 Mail Service Center Supervisor Raleigh, NC 27699-4326 Licensing/Regulatory Programs Progress Energy Chair Electronic Mail Distribution Board of County Commissioners of Wake County David T. Conley P.O. Box 550 Senior Counsel Raleigh, NC 27602 Legal Department Progress Energy Ernest J. Kapopoulos Jr.

Electronic Mail Distribution Plant General Manager Carolina Power and Light Company Donna B. Alexander Shearon Harris Nuclear Power Plant Manager, Nuclear Regulatory Affairs Electronic Mail Distribution (interim)

Progress Energy Chair Electronic Mail Distribution Board of County Commissioners of Chatham County John H. O'Neill, Jr. P.O. Box 1809 Shaw, Pittman, Potts & Trowbridge Pittsboro, NC 27312 2300 N. Street, NW Washington, DC 20037-1128 Senior Resident Inspector U.S. Nuclear Regulatory Commission Joseph W. Donahue Shearon Harris Nuclear Power Plant Vice President U.S. NRC Nuclear Oversight 5421 Shearon Harris Rd Progress Energy New Hill, NC 27562-9998 Electronic Mail Distribution

CP&L 4 Letter to Chris Burton from George T. Hopper dated March 31, 2011

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION Distribution w/encl:

C. Evans, RII EICS L. Evans, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource

INFORMATION REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (July 11-15 and July 25-29, 2011)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since September 14, 2009. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral and action request/nuclear condition report (AR/NCR) extension process If any of the procedures requested above were revised after September 14, 2009, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions
3. List of all AR/NCRs initiated including the following information for each AR/NCR:

a) AR/NCR Number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) AR/NCR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)

AR/NCR Problem Priority System Component Org Status AR/NCR A RHR Pump 2 RHR 2-RHR- ENG Open 001 failed flow criteria PMP-A per SR 5.0.5.4 Enclosure

2

4. List of outstanding corrective actions including the following information for each action:

a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc) c) Brief, but complete corrective action description d) Associated AR/NCR number e) Corrective action initiation date f) Number of Extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)

Corrective Type Description AR/NCR Initiation Extensions Due Status Action # Date Date 0034 CAPR Revise AR/NCR 01/05/08 2 06/15/08 Closed Procedure 0058 NGK-003-4585

5. List of control room deficiencies with a brief description and corresponding AR/NCR and/or work order (WO) number
6. List of operator workarounds and operator burdens with a brief description and corresponding AR/NCR number
7. List of all currently extended AR/NCRs or overdue, sorted by initiation date, with the following information:

a) AR/NCR #

b) Priority or Significance c) AR/NCR title and short description

8. List of all AR/NCRs that have been voided or cancelled. Please provide the following information for each AR/NCR:

a) AR/NCR Number b) Brief, but complete problem description c) Reason voided or cancelled

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since September 14, 2009. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1) b) Reason for being placed in (a)(1)

Enclosure

3 c) Planned actions and their status

10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.

Please include actions completed and current status.

11. List of corrective maintenance work orders. Please include the following information for each work order:

a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (example shown below)

Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/08 03/15/09 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.

12. Corrective action closeout packages, including AR/NCRs with description of corrective actions, for all NRC findings and Licensee identified violations. Please include a cross reference linking NRC Finding numbers and LIVs to appropriate AR/NCR numbers.
13. Corrective action closeout packages, including AR/NCRs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate AR/NCR number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)

and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.,) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., AR/NCR #) for the documents that evaluated the aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
16. Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc)
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends Enclosure

4

18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of AR/NCRs initiated by department, human performance errors by department, and others as may be available
19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
20. List of AR/NCRs related to equipment aging issues in the top ten risk significant systems since September 14, 2006 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Please provide the following information for each AR/NCR:

a) AR/NCR number b) Priority c) AR/NCR problem description

21. If performed, please provide any recent self-assessment of the site safety culture.
22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
23. List of all root cause evaluations with a brief description
24. Copy of Probabilistic Risk Assessment importance measures report, if available
25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems Enclosure