Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TAC:MD589518 December 2007
ML07354072018 December 2007Tech Spec Pages for Amendments 244 and 222 Application to Eliminate License Conditions for Reporting Violations Using the Consolidated Line Item Improvement ProcessFire Protection Program
ML07344021818 December 2007License Amendment, Application to Eliminate License Conditions for Reporting Violations Using the Consolidated Line Item Improvement Process
ML07346048817 December 2007Docketing of Updated Permits Submitted to the USNRC Staff Via-E-mail by PPL Susquehanna. LLC for the Susquehanna Steam Electric Station, Units 1 and 2 License Renewal Environmental Review
ML07288005113 December 2007Summary of Telephone Conference Call Held on 10/03/07, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning FireAging Management
ML07347073213 December 2007ROP 8 - Susquehanna - Change to Inspection Plan, 12/13/07
ML07345045110 December 2007Radioactive Waste Management System and Effluent Control System Description from Susquehanna Steam Electric Station Final Safety Analysis Report, Revision 62, Berwick, PennsylvaniaGrab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Process Control Program
Earthquake
Fuel cladding
Accidental discharge
ML0733903067 December 2007Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment to Increase the Maximum Reactor Power LevelZebra Mussel
License Renewal
Biofouling
Environmental Justice
Power Uprate
Measurement Uncertainty Recapture
ML0733902897 December 2007(SSES 1 and 2) - Correction to Final Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate
PLA-6308, Electrical Power Systems Technical Specification 3.8.1 - Supplement PLA-63085 December 2007Electrical Power Systems Technical Specification 3.8.1 - Supplement PLA-6308
PLA-6306, Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement30 November 2007Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - SupplementMELLLA
ML07337082430 November 2007Operator Licensing Examination Approval (Susquehanna Steam Electric Station)
ML07332038328 November 2007(SSES 1 and 2) - Final Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate (TAC Nos. MD3309 and MD3310)
Press Release-I-07-061, NRC Cites Former Susquehanna Nuclear Plant Operator27 November 2007Press Release-I-07-061: NRC Cites Former Susquehanna Nuclear Plant Operator
ML07330019826 November 2007EN-07-064, Mr. Keith Davis, Confirmatory Order (Effective Immediately)
IR 05000387/200740219 November 2007IR 05000387-07-402, and IR 05000388-07-402, on 10/15/2007 - 10/19/2007, Susquehanna Steam Electric Station, Physical ProtectionAffidavit
ML07285111016 November 2007Summary of Telephone Conference Call Held on October 3, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC Concerning Open Items Pertaining to the Susquehanna, Units 1 and 2, License Renewal ApplicationAging Management
Offsite Circuit
TAC:MD476614 November 2007
PLA-6302, Request for Additional Information (RAI) for the Review of the Plants License Renewal Application (LRA) Section 2.3.114 November 2007Request for Additional Information (RAI) for the Review of the Plants License Renewal Application (LRA) Section 2.3.1Aging Management
NL-07-1959, 10 CFR 21 Report, Notification of Potential Defect Associated with Areva Model MA-VR-350 4160 V Circuit Breakers14 November 200710 CFR 21 Report, Notification of Potential Defect Associated with Areva Model MA-VR-350 4160 V Circuit Breakers
ML07313005514 November 2007Request for Additional Information (RAI) - Electrical Power Systems Technical Specification (TS) 3.8.1
IR 05000387/200700414 November 2007IR 05000387-07-004, 05000388-07-004; 07/01/2007 - 09/30/2007; Susquehanna Steam Electric Station, Units 1 and 2; Routine Integrated ReportUltimate heat sink
Fire Barrier
Temporary Modification
Significance Determination Process
Job Performance Measure
Scram Discharge Volume
Operability Determination
Maintenance Rule Program
Fire Protection Program
Scaffolding
Power change
Operability Assessment
ML07324109212 November 2007Revisions to Technical Requirements ManualShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
Earthquake
Hourly Fire Watch
ML0731000821 November 2007Notification of Potential 10 CFR Part 21 of an Error in BWR MCPR CalculationAnticipated operational occurrence
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07302000125 October 2007FRN - Power Uprates (Susquehanna), November 14, 2007
ML07285025524 October 2007Requests for Additional Information for the Review of the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal ApplicationAging Management
ML07289065224 October 2007Summary of July 19th Conference Call Between NRC DLR Environmental Staff; PPL Susquehanna, LLC; and PPL Generating Regarding PPL Generation'S Letter of Intent to File a Combined License Application for a Potential New Unit at the SSES Site
ML07276027624 October 200709/26/2007 Summary of Telephone Conference Call Between the NRC and PPL Susquehanna, LLC Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal ApplicationAging Management
ML07264013424 October 2007Summary of Telephone Conference Call with PPL Susquehanna, LLC Concerning Requests for Additional InformationAging Management
Press Release-I-07-055, - NRC Assigns New Inspectors to Susquehanna Station23 October 2007Press Release-I-07-055 - NRC Assigns New Inspectors to Susquehanna StationNew Resident Inspector
PLA-6283, Response to Request for Additional Information Regarding Review of License Application (LRA) Sections 4.2.3, 4.2.4, 4.2.5, 4.2.7 and 4.7.318 October 2007Response to Request for Additional Information Regarding Review of License Application (LRA) Sections 4.2.3, 4.2.4, 4.2.5, 4.2.7 and 4.7.3Hydrostatic
Aging Management
PLA-6293, Request for Additional Information (RAI) for the Review of the License Renewal Application (LRA) Section B.2.2116 October 2007Request for Additional Information (RAI) for the Review of the License Renewal Application (LRA) Section B.2.21Aging Management
PLA-6289, Request for Additional Information (RAI) for the Review of the License Renewal Application (LRA) Section 4.7.1 PLA-628916 October 2007Request for Additional Information (RAI) for the Review of the License Renewal Application (LRA) Section 4.7.1 PLA-6289
ML07311051511 October 2007Letter to Rani Franovich from David Densmore, U.S. Fish and Wildlife Service Usfws Project #2007-1111
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML07285012210 October 2007BWRVIP-145NP, BWR Vessel and Internals Project, Evaluation of Susquehanna Unit 2 Top Guide and Core Shroud Material Samples Using RAMA Fluence Methodology
ML0728303348 October 2007Notification of Potential Part 21 Report - Areva Minimum Critical Power RatioAnticipated operational occurrence
ML0727801655 October 2007SRM-M071005 - Affirmation Session: SECY-07-0164 - Eric Joseph Epstein'S Appeal of LBP-07-10 Susquehanna LLC Extended Power Uprate.
ML0727803045 October 2007M071005 - Affirmation Session: SECY-07-0164 - PPL Susquehanna LLC (Susquehanna Steam Electric Station, Units 1 & 2) Extended Power Uprate - Eric Joseph Epstein'S Appeal of LBP-07-10
M071005, M071005 - Affirmation Session: SECY-07-0164 - PPL Susquehanna LLC (Susquehanna Steam Electric Station, Units 1 & 2) Extended Power Uprate - Eric Joseph Epstein'S Appeal of LBP-07-105 October 2007M071005 - Affirmation Session: SECY-07-0164 - PPL Susquehanna LLC (Susquehanna Steam Electric Station, Units 1 & 2) Extended Power Uprate - Eric Joseph Epstein'S Appeal of LBP-07-10
PLA-6076, Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application - Supplement5 October 2007Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application - SupplementPower Uprate
ML0728903505 October 2007TRM2, Rev. 40, Technical Requirements Manual Unit 2.Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
Control of Heavy Loads
ML0728901935 October 2007Changes to Technical Specifications Bases ManualHot Short
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Squib
Scram Discharge Volume
Power Operated Valves
Fuel cladding
ML0728903485 October 2007Rev. 41 to Technical Requirements ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Control of Heavy Loads
ML0728901945 October 2007Technical Specification Bases ManualHot Short
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Squib
Scram Discharge Volume
Power Operated Valves
Fuel cladding
ML0727802635 October 2007Commission Memorandum and Order (CLI-07-25)Ultimate heat sink
PLA-6280, License Renewal Application Evaluation of Errors in the Severe Accident Mitigation Alternatives Analysis2 October 2007License Renewal Application Evaluation of Errors in the Severe Accident Mitigation Alternatives Analysis
PLA-6277, Follow-up to Request for Additional Information for the Review of the License Renewal Application (LRA) Section 4.1.320 September 2007Follow-up to Request for Additional Information for the Review of the License Renewal Application (LRA) Section 4.1.3
ML07263022220 September 2007Summary of Category 1 Working-Level Meeting with PPL to Discuss Pre-Audit Preparations Regarding Anticipated Transient Without Scram (ATWS) and Long-Term Stability Solution Implementation