Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07354036619 December 2007Inspection Plan 1/1/08 - 12/31/08
RS-07-165, License Amendment Request Regarding Spent Fuel Storage Pool Criticality13 December 2007License Amendment Request Regarding Spent Fuel Storage Pool CriticalityFLEX
Double blade guide
Earthquake
RS-07-156, Company, Llc/Amergen Energy Company, LLC Response to the Request for Additional Information (RAI) Regarding Resolution of NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident.7 December 2007Company, Llc/Amergen Energy Company, LLC Response to the Request for Additional Information (RAI) Regarding Resolution of NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident.
ML07299042229 November 2007Fleet, Request for Additional Information Use of the Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of the ASME Code RequirementsVT-2
Dissimilar Metal Weld
TAC:MD393819 November 2007
ML07225041119 November 2007License Amendments to Provide Consistency with Quality Assurance Topical Report
ML07333109419 November 2007Tech Specs for Amendments to Provide Consistency with Quality Assurance Topical ReportSafe Shutdown
Safeguards Contingency Plan
Fire Protection Program
IR 05000373/20070099 November 2007IR 05000373-07-009, 05000374-07-009, on 08/27/07 - 09/28/07, LaSalle County Station, Units 1 and 2; Component Design Basis InspectionSafe Shutdown
Ultimate heat sink
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Time Critical Operator Action
Battery sizing
Fire Protection Program
Operability Assessment
Power Uprate
ML0729203076 November 2007RAI
IR 05000037/20230072 November 2007IR 050003723-07-004 & 05000374-07-004, on 07/01/2007 - 09/30/2007, LaSalle County Station, Units 1 & 2; Surveillance Testing and Radioactive Material Processing and Transportation ReportHigh winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Temporary Modification
Tornado-Generated Missile
Significance Determination Process
Annual Radiological Environmental Operating Report
Siren
Exclusive Use
ML0731000821 November 2007Notification of Potential 10 CFR Part 21 of an Error in BWR MCPR CalculationAnticipated operational occurrence
ML07296017031 October 2007Public Meeting Summary on the Reactor Oversight ProcessTime of Discovery
Mission time
Probabilistic Risk Assessment
Zebra Mussel
Significance Determination Process
Maintenance Rule Program
Power change
Downpower
ML07296069031 October 2007Proposed Changes to Public Radiation Safety SDP
ML07310038931 October 2007Technical Specifications, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability.Safe Shutdown
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Recently irradiated fuel
Fire Protection Program
ML07255039331 October 2007License Amendment, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability.Safe Shutdown
Earthquake
Recently irradiated fuel
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07284019819 October 2007SDP Notebook Transmittal Letter (Public Version)Significance Determination Process
ML07291026218 October 2007Forthcoming Meeting with Exelon Generating Company to Discuss LaSalle County Station (Lscs), Unit 2 Spent Fuel Pool Storage
ML07271017017 October 2007License Amendment, Revise Technical Specifications, Section 5.5.7, Inservice Testing Program.Incorporated by reference
TAC:MD360412 October 2007
ML07289074712 October 2007Technical Specifications, Revise Technical Specifications, Section 5.5.7, Inservice Testing Program.
RS-07-143, Withdrawal of Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.12 October 2007Withdrawal of Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.
TAC:MB546711 October 2007
RS-07-130, Response to Request for Additional Information Related to Relief Request I3R-05, Post-Tensioning Inspection Scheduling Requirement for Sites with Two Plants.11 October 2007Response to Request for Additional Information Related to Relief Request I3R-05, Post-Tensioning Inspection Scheduling Requirement for Sites with Two Plants.
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML0728303348 October 2007Notification of Potential Part 21 Report - Areva Minimum Critical Power RatioAnticipated operational occurrence
RS-07-134, Co. and Amergen Energy Co., LLC, Response to Request for Additional Information Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements5 October 2007Co. and Amergen Energy Co., LLC, Response to Request for Additional Information Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code RequirementsNondestructive Examination
VT-2
EVT-1
Liquid penetrant
ML0727603302 October 2007LaSalle Requalification Program Inspection
ML07277042728 September 2007Modification No. 002 to Contract No. DR-16-06-300
RS-07-131, Request for Relief from ASME OM Code for the Third Inservice Testing Interval - RP-0228 September 2007Request for Relief from ASME OM Code for the Third Inservice Testing Interval - RP-02
ML07276033427 September 2007Technical Specifications, Issuance of Amendments Required Action End States Consistent with Technical Specification Task Force TSTF-423Offsite Circuit
ML07193040627 September 2007License Amendment, Issuance of Amendments Required Action End States Consistent with Technical Specification Task Force TSTF-423Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Fuel cladding
TAC:MD598826 September 2007
ML07262037326 September 2007Relief Request Third 10-Year Pump and Valve Inservice Testing Program (TAC Nos. MD5988, MD5989, MD5992 Through MD5995)Stroke time
Incorporated by reference
Power-Operated Valves
ML07260069417 September 2007Morning Report 3-2007-0020 - Exelon Nuclear Announces Executive Realignment
ML07255003017 September 2007RAI Related to Relief Request 13R-05 for Post-Tensioning System Inspection Schedule
RA-07-079, Submittal of Program Plan Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inspection (Cisi) Interval12 September 2007Submittal of Program Plan Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inspection (Cisi) IntervalWeld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
RA07-081, Cycle 12, Revision 4 Core Operating Limits Report (COLR)12 September 2007Cycle 12, Revision 4 Core Operating Limits Report (COLR)Safety Limit Minimum Critical Power Ratio
MELLLA
RS-07-129, Supplemental Information to Support the Request for Relief from ASME OM Code for the Third Ten-year Inservice Testing Interval11 September 2007Supplemental Information to Support the Request for Relief from ASME OM Code for the Third Ten-year Inservice Testing IntervalStroke time
Power-Operated Valves
ML0725308487 September 2007Upcoming LaSalle Problem Identification and Resolution (Pi&R) Inspection, Request LetterTemporary Modification
ML0725003527 September 2007Announces Executive Realignment
RS-07-124, Additional Information Supporting Request for a License Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.7 September 2007Additional Information Supporting Request for a License Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.
IR 05000373/20074026 September 2007IR 05000373-07-402, and IR 05000374-07-402, on 07/31/2007 - 08/03/2007, LaSalle County Station, Routine Security Baseline Inspection - Cover Letter
ML0722904195 September 2007Fleet, RAI Relief Request to Use of the Boiling Water Reactor Vessel and Internals Project GuidelinesNondestructive Examination
EVT-1
TAC:MD53525 September 2007
TAC:MD68674 September 2007
RS-07-122, Withdrawal of Request for Relief from ASME OM Code for the Third Inservice Testing Interval4 September 2007Withdrawal of Request for Relief from ASME OM Code for the Third Inservice Testing Interval
ML07243020031 August 2007Mid-Cycle Performance Review and Inspection Plan - LaSalle County Station, Units 1 and 2
ML07233020920 August 2007Task Order No. 106 Under Delivery Order No. NRC-03-03-037
RA07-066, 2007 Triennial Chlorine Survey Report, Submitting Amendments 38 and 20 to Licenses NPF-011 and NPF-01817 August 20072007 Triennial Chlorine Survey Report, Submitting Amendments 38 and 20 to Licenses NPF-011 and NPF-018