Technical Specifications, Issuance of Amendments Required Action End States Consistent with Technical Specification Task Force TSTF-423
ML072760334
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/27/2007
From:
Office of Nuclear Reactor Regulation
To:
Sands S,NRR/DORL, 415-3154
Shared Package
ML071390414 List:
References
TAC MD3581, TAC MD3582, TSTF-423
Download: ML072760334 (23)


Text

RPS Electric Power Monitoring 3.3.8.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met in MODE 1, 2, or 3.

D. Required Action and D.1 Initiate action to Immediately associated Completion restore one electric Time of Condition A or power monitoring B not met in MODE 4 or assembly to OPERABLE 5 with RHR SDC status for inservice isolation valves open. power supply(s) supplying required instrumentation.

OR D.2 Initiate action to Immediately isolate the RHR SDC System.

E. Required Action and E.1 Initiate action to Immediately associated Completion fully insert all Time of Condition A or insertable control B not met in MODE 5 rods in core cells with any control rod containing one or withdrawn from a core more fuel assemblies.

cell containing one or more fuel assemblies.

(continued)

LaSalle 1 and 2 3.3.8.2-2 Amendment No.184 '171

ECCS-Operating 3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. High Pressure Core 8.1 Verify by Immediately Spray (HPCS) System administrative means inoperable. RCIC System is OPERABLE when RCIC is required to be OPERABLE.

AND B.2 Restore HPCS System 14 days to OPERABLE status.

C. Two low pressure ECCS C.1 Restore one low 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> injection/spray pressure ECCS subsystems inoperable, injection/spray subsystem to OPERABLE status.

D. ADS accumulator backup D.1 Restore ADS 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> compressed gas system accumulator backup bottle pressure compressed gas system

< 500 psig. bottle pressure

Ž 500 psig.

OR D.2 Declare associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ADS valves inoperable.

E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, B, or C not met.

(continued)

LaSalle I and2 3.5.1-2 Amendment No. 184/1.71

ECCS-Operating 3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. One required ADS valve F.1 Restore required ADS 14 days inoperable. valve to OPERABLE status .

G. Required Action and G.1 Be in MODE 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition F not met.

H. Two or more required H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ADS valves inoperable.

AND H.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to

  • 150 psig.

I. HPCS and one or more 1.1 Enter LCO 3.0.3. Immediately low pressure ECCS injection/spray subsystems inoperable.

OR Three or more ECCS injection/spray subsystems inoperable.

oPR One or more ECCS injection/spray subsystems and one or more required ADS valves inoperable.

I ý~ o1 P r!' 3 .5ý.1I-3' Amendment No. 18P4, 471

Primary Containment 3.6.1.1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment LCO 3.6.1.1 Primary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.I Restore primary 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, containment to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. I LaSalle I and 2 3.6.1.1-1 Amendment No.184 /71

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.6 3.6 CONTAINMENT SYSTEMS 3.6.1.6 Suppression Chamber-to-Drywell Vacuum Breakers LCO 3.6.1.6 Each suppression chamber-to-drywell vacuum breaker shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One suppression A.1 Restore the vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> chamber-to-drywell breaker to OPERABLE vacuum breaker status.

inoperable for opening.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

C. One suppression C.1 Close both manual 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> chamber-to-drywell isolation valves in vacuum breaker not the affected line.

closed.

AND C.2 Restore the vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> breaker to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C ^ua not met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

LaSalle 1 and 2 3.6. 1.6-1 Amendment No. 18-4/171

Suppression Chamber-to-Drywell Vacuum Breakers 3.6. 1.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two or more E.1 Enter LCO 3.0.3. Immediately suppression chamber-to-drywell vacuum breakers inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1 ------------------- NOTES----------------

1. Not required to be met for vacuum breakers that are open during Surveillances.
2. Not required to be met for vacuum breakers open when performing their intended function.

Verify each vacuum breaker is closed. 14 days SR 3.6.1.6.2 Perform a functional test of each vacuum 92 days breaker.

AND Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after any discharge of steam to the suppression chamber from the safety/relief valves (continued)

LaSalle 1 and 2 3.6.!.6-2 Amendment No. 184/171

RHR Suppression Pool Cool i ng 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression A.1 Restore RHR 7 days pool cooling subsystem suppression pool inoperable, cooling subsystem to OPERABLE status.

B. Required Action and B. Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

C. Two RHR suppression C.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pool cooling suppression pool subsystems inoperable, cooling subsystem to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C AND not met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> LaSalle I and 2 3.6.2.3-1 Amendment No. 184/171

RHR Suppression Pool Spray 3.6.2.4 3.6 CONTAINMENT SYSTEMS 3.6.2.4 Residual Heat Removal (RHR) Suppression Pool Spray LCO 3.6.2.4 Two RHR suppression pool spray subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression A.1 Restore RHR 7 days pool spray subsystem suppression pool inoperable, spray subsystem to OPERABLE status.

B. Two RHR suppression B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pool spray subsystems suppression pool inoperable, spray subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

LaSalle I and 2 3.6.2.4-1 Amendment No. 184/171

Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, containment to 2, or 3. OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

(continued)

LaSalle 1 and 2 3.6.4.1-1 Amendment No. 184 471

SGT System 3.6.4.3 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Standby Gas Treatment (SGT) System LCO 3.6.4.3 Two SGT subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SGT subsystem A.1 Restore SGT subsystem 7 days inoperable, to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met in MODE 1, 2, I

or 3.

C. Required Action and ------------ NOTE -------------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met during movement of irradiated C.1 Place OPERABLE SGT Immediately fuel assemblies in the subsystem in secondary containment, operation.

during CORE ALTERATIONS, or during OR OPDRVs.

(continued)

LaSalle I and 2 3.6.4.3-1 Amendment No. 184/ 171

SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND C.2.2 Suspend CORE Immediately ALTERATIONS.

AND C.2.3 Initiate action to Immediately suspend OPDRVs.

D. Two SGT subsystems D.1 Be in MODE 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable in MODE 1, 2, or 3.

E. Two SGT subsystems E.1 ---------NOTE ---------

inoperable during LCO 3.0.3 is not movement of irradiated applicable.

fuel assemblies in the ---------------------

secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in the secondary containment.

AND (continued)

LaSalle I and 2 3. 6.4 .3-2 Amendment No.184 171

RHRSW System 3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. --------NOTE --------- B.1 ---------NOTE--------

Only applicable to Enter applicable Unit 2 during Conditions and replacement of the Required Actions of Division 1 CSCS LCO 3.4.9, "Residual isolation valves Heat Removal (RHR) during Unit I Shutdown Cooling Refueling 11 while System-Hot Unit I is in Mode 4,5, Shutdown," for RHR or defueled. shutdown cooling subsystem made One RHRSW subsystem inoperable by RHRSW inoperable. System.

Restore RHRSW 10 days subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Conditions A or B not met.

D. Both RHRSW subsystems D.1 ---------NOTE--------

inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.9 for RHR shutdown cooling subsystems made inoperable by RHRSW System.

Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

(continued) j.7.i- Amendmen t No. 184 /I 71 LaSalie 1 and 2

RHRSW System 3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition D AND not met.

E.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify each RHRSW manual, power operated, 31 days and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.

LaSalle ! and 2 '1.7.!-3 dAmendment No, 184/1-71

CRAF System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Control Room Area Filtration (CRAF) System LCO 3.7.4 Two CRAF subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRAF subsystem A.1 Restore CRAF 7 days inoperable, subsystem to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A not met in MODE 1, 2, or 3.

(continued)

LaSalle I and 2 3.7.4-1 Amendment No.184 '171

CRAF System 3.7.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and ------------NOTE-----------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A -----------------------------

not met during movement of irradiated C.1 Place OPERABLE CRAF Immediately fuel assemblies in the subsystem in secondary containment, pressurization mode.

during CORE ALTERATIONS, or during OR OPDRVs.

C.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND C.2.2 Suspend CORE Immediately ALTERATIONS.

AND C.2.3 Initiate action to Immediately suspend OPDRVs.

D. Two CRAF subsystems D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable in MODE 1, 2, or 3.

(continued)

LaSalle I and 2 3.7.4-2 Amendment No. 184 471

Control Room Area Ventilation AC System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Control Room Area Ventilation Air Conditioning (AC) System

[CO 3.7.5 Two control room area ventilation AC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room area A.1 Restore control room 30 days ventilation AC area ventilation AC subsystem inoperable, subsystem to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A I not met in MODE 1, 2, or 3.

(continued)

LaSalle I and 2 3.7.5-1 Amendment No. 1 8 4 / 1 7 1

Control Room Area Ventilation AC System 3.7.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and -------------NOTE -------------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met during movement of irradiated C.1 Place OPERABLE Immediately fuel assemblies in the control room area secondary containment, ventilation AC during CORE subsystem in ALTERATIONS, or during operation.

OPDRVs.

OR C.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND C.2.2 Suspend CORE Immediately ALTERATIONS.

AND C.2.3 Initiate action to Immediately suspend OPDRVs.

D. Two control room area D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ventilation AC subsystems inoperable in MODE 1, 2, or 3.

(continued)

LaSalle I and 2 3.7.5-2 Amendment No. 184/171

Main Condenser Offgas 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Main Condenser Offgas LCO 3.7.6 The gross gamma activity rate of the noble gases measured prior to the holdup line shall be s 340,000 pCi/second after decay of 30 minutes.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated and steam jet air ejector (SJAE) in operation.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Gross gamma activity A.1 Restore gross gamma 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> rate of the noble activity rate of the gases not within noble gases to within limit, limit.

B. Required Action and B.1 Isolate all main 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion steam lines.

Time not met.

OR B.2 Isolate SJAE. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR B.3 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I

I LaSalle I and 2 3.7.6-1 Amendment No. 184 /171

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME G. -------- NOTES --------- G.1 Restore required 6 days Division 2 DG to

1. Only applicable to OPERABLE status.

Unit 1 during replacement of the Unit 2 Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4,5, or defueled.

2. Only applicable to Unit 2 during replacement of the Unit I Division 2 CSCS isolation valves during Unit 1 Refueling 12 while Unit I is in MODE 4,5, or defueled.

Division 2 DG and the required opposite unit Division 2 DG inoperable.

H. Required Action and H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, B, C, D, E, or F not met.

I. Required Action and 1.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition G AND not met.

1.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

LaSalle 1 and 2 3.8.i1-7 Amendment No. 184/1i7i

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME J. Three or more required J.1 Enter LCO 3.0.3. Immediately AC sources inoperable.

SURVEILLANCE REQUIREMENTS


NOTES ------------------------------------

1. SR 3.8.1.1 through SR 3.8.1.20 are applicable only to the given unit's AC electrical power sources.
2. SR 3.8.1.21 is applicable to the required opposite unit's DG.

SURVEILLANCE - FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each required offsite circuit.

SR 3.8.1.2 ------------------- NOTES -------------------

1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.

When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.

3. A single test of the common DG at the specified Frequency will satisfy the Surveillance for both units.

Verify each required DG starts from standby 31 days conditions and achieves steady state voltage ! 4010 V and A 4310 V and frequency

Ž 58.8 Hz and a 61.2 Hz.

(continued)

LaSalle 1 and 2 3.8.1-8 Lmenme. No nd2.84 A 71

DC Sources-Operating 3.8.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND not met for the Division 1 or 2 125 F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> VDC electrical power subsystem.

OR Required Action and associated Completion Time of Condition E not met.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition B not met.

SURVEILLANCE REQUIREMENTS NOTES -..--------------------------------

1. SR 3.8.4.1 through SR 3.8.4.3 are applicable only to the given unit's DC electrical power sources.
2. SR 3.8.4.4 is applicable only to the opposite unit DC electrical power source.

SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater 7 days than or equal to the minimum established float voltage.

(continued)

LaSalle 1 and 2 3.8.4-3 Amendment No.i84 1i77i

Distribution Systems-Operating 3.8.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One or both Division 1 B.1 Restore Division 1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 2 125 V DC and 2 125 V DC electrical power electrical power AND distribution distribution subsystems inoperable, subsystem(s) to 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from OPERABLE status. discovery of failure to meet LCO 3.8.7.a C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met.

D. One or more required --------------NOTE----------

opposite unit Division Enter applicable Conditions 2 AC or DC electrical and Required Actions of LCO power distribution 3.8.1 when Condition C subsystems inoperable, results in the inoperability of a required offsite circuit.

D.1 Restore required 7 days opposite unit Division 2 AC and DC electrical power distribution subsystem(s).

E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition D AND not met.

E.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

I ~ U ri~d ,2-~

Amendnt No. .184 A 71

Distribution Systems-Operating 3.8.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. One or both Division 3 F.1 Declare associated Immediately AC or DC electrical supported features power distribution inoperable.

subsystems inoperable.

G. Division 1 250 V DC G.A Declare associated Immediately electrical power supported features subsystem inoperable, inoperable.

H. Two or more electrical H.1 Enter LCO 3.0.3. Immediately power distribution subsystems inoperable that, in combination, result in a loss of function.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and 7 days voltage to required AC and DC electrical power distribution subsystems.