Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
TAC:MD630419 December 2007
ML07257012619 December 2007Safety Evaluation of Proposed Modification to NRC Approved Alternative for Weld Overlay on Dissimilar Metal Welds of Pressurizer NozzlesWeld Overlay
Nondestructive Examination
Dissimilar Metal Weld
IR 05000348/200701019 December 2007IR 05000348-07-010 and 05000364-07-010; 9/10-14/07; Joseph M. Farley Nuclear Plant, Units 1 and 2; Augmented InspectionFunctionality Assessment
Operability Determination
ML07361059619 December 2007Comment (30) of Dale M. Lloyd on Behalf of Southern Nuclear Operating Company Re Proposed Rules Pr 52, Consideration of Aircraft Impacts for New Nuclear Power Reactor Designs.
ML07348024110 December 2007IR 05000348-08-006 & 05000364-08-006, on 02/26-28/2008 & 03/17-21/2008 and 03/31-04/04/2008, Southern Nuclear Operating Co. Inc Notification of Triennial Fire Protection Baseline InspectionSafe Shutdown
Fitness for Duty
Fire Barrier
Fire impairment
Temporary Modification
Fire Protection Program
NL-07-2245, Generic Letter 2004-02 Response Extension Request - Chemical Effects7 December 2007Generic Letter 2004-02 Response Extension Request - Chemical EffectsSafe Shutdown Earthquake
Weld Overlay
Coatings
Job Performance Measure
Foreign Material Exclusion
Fuel cladding
Dissimilar Metal Weld
ML0733809554 December 2007Summary of Public Exit Meeting - Joseph M. Farley Nuclear Plant - to Discuss the Results of an Extended Augmented Inspection Team Inspection for Additional Residual Heat Removal System Breaker Failure
NL-07-2175, Reply to a Notice of Violation; EA-07-173, NRC Inspection Report 05000348, 364/200701130 November 2007Reply to a Notice of Violation; EA-07-173, NRC Inspection Report 05000348, 364/2007011Coatings
Condition Adverse to Quality
NL-07-2217, Special Report No 2007-001-00, Inoperable Radiation Monitor R-60D28 November 2007Special Report No 2007-001-00, Inoperable Radiation Monitor R-60D
ML07333014019 November 2007Attendee List for Public Exit Meeting
Press Release-II-07-053, NRC to Hold Public Meeting in Dothan on Nov. 19 to Discuss Extended Farley Breaker Failure Inspection Results16 November 2007Press Release-II-07-053: NRC to Hold Public Meeting in Dothan on Nov. 19 to Discuss Extended Farley Breaker Failure Inspection Results
ML07324118916 November 2007FOIA/PA-2008-0016 - Resp 1 - Partial
ML07319029915 November 2007AIT Re-Exit Public Meeting Announcement
NL-07-2099, Response to Initiative for Electronic Distribution of Correspondence14 November 2007Response to Initiative for Electronic Distribution of Correspondence
NL-07-1959, 10 CFR 21 Report, Notification of Potential Defect Associated with Areva Model MA-VR-350 4160 V Circuit Breakers14 November 200710 CFR 21 Report, Notification of Potential Defect Associated with Areva Model MA-VR-350 4160 V Circuit Breakers
Press Release-II-07-052, - NRC Increases Oversight of Both Farley Nuclear Plant Units and Issues Confirmatory Action Letter on Breakers13 November 2007Press Release-II-07-052 - NRC Increases Oversight of Both Farley Nuclear Plant Units and Issues Confirmatory Action Letter on Breakers
NL-07-2116, Pressurizer Nozzle Full Structural Weld Overlays Nondestructive Examination Results - Fall 2007 Outage (1R21)12 November 2007Pressurizer Nozzle Full Structural Weld Overlays Nondestructive Examination Results - Fall 2007 Outage (1R21)Weld Overlay
Nondestructive Examination
Dissimilar Metal Weld
ML0731304039 November 2007Follow-up Assessment Letter
ML0731304449 November 2007Breaker Confirmatory Action Letter
ML0729807997 November 2007Units and 2, Request for Additional Information Regarding Pressurizer Nozzle Weld Overlay ISI-GEN-ALT-07-01Weld Overlay
Dissimilar Metal Weld
NL-07-2113, Operability Evaluation of Areva Cutler-Hammer Breakers5 November 2007Operability Evaluation of Areva Cutler-Hammer Breakers
NL-06-2801, Technical Specification Amendment Request, Containment Leakage Rate Testing Program5 November 2007Technical Specification Amendment Request, Containment Leakage Rate Testing Program
NL-07-2065, Pressurizer Nozzle Structural Weld Overlay Evaluation Report2 November 2007Pressurizer Nozzle Structural Weld Overlay Evaluation ReportWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
NL-07-1962, Eighteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report1 November 2007Eighteenth Maintenance/Refueling Outage Steam Generator Tube Inspection ReportNondestructive Examination
NL-07-1998, Cycle 22 Core Operating Limits Report31 October 2007Cycle 22 Core Operating Limits ReportShutdown Margin
IR 05000348/200701131 October 2007Final Significance Determination for a Yellow Finding and Notice of Violation (NRC Inspection Report Nos. 05000348-07-011 and 05000364-07-001, Joseph M. Farley Nuclear Plant). EA-07-173
ML07304048331 October 2007Supplemental Augmented Inspection Team Charter to Evaluate a Farley 1B Residual Heat Removal (RHR) Pump 4.16-kV Breaker FailureSignificance Determination Process
IR 05000348/200700430 October 2007IR 05000348-07-004 and 05000364-07-004, on 07/01/2007 - 09/30/2007; Joseph M. Farley Nuclear Plant, Units 1 & 2, Routine Integrated ReportFire Barrier
Operability Determination
ML07324135030 October 2007Email from G. Wilson, NRR to K. Miller, NRR, M. Mcconnell, NRR and R. Martin, NRR Inspection of Cutler Hammer
NL-07-2057, Operability Evaluation of Areva Cutler-Hammer Breakers29 October 2007Operability Evaluation of Areva Cutler-Hammer Breakers
ML07298001426 October 2007EN-07-060 - Joseph M. Farley Nuclear Plant, Unit 2, Issuance of Final Significance Determination & Notice of ViolationCondition Adverse to Quality
Significance Determination Process
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07324134925 October 2007Email from T. Mcginty, NRR to M. Franovich, NRR Et Al. Fwd: Confirmation of Action for Farley
ML07324134725 October 2007Email from M. Mcconnell, NRR to R. Martin, NRR Briefing on Farley Breaker Inspection
ML07298067024 October 2007Meeting Presentation on GEH Chemical Effects Testing Update
Press Release-II-07-050, NRC Extends Augmented Inspection Team Inquiry at Farley23 October 2007Press Release-II-07-050: NRC Extends Augmented Inspection Team Inquiry at Farley
ML07324134622 October 2007Email from M. Ashley, NRR to R. Martin, NRR and G. Wilson, NRR Supplemental AIT Charter for Farley
PNO-II-07-009, B: Joseph M. Farley Nuclear Plant Unit 1, Update - Extended Farley Augmented Inspection Team22 October 2007PNO-II-07-009B: Joseph M. Farley Nuclear Plant Unit 1, Update - Extended Farley Augmented Inspection Team
IR 05000348/200750112 October 2007IR 05000348-07-501, 05000364-07-501, on 09/10-14/2007, Joseph M. Farley Nuclear Plant, Baseline Inspection
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
NL-07-1958, Relief Request RR-60 (Version 3.0) Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)10 October 2007Relief Request RR-60 (Version 3.0) Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)Boric Acid
High Radiation Area
VT-2
NL-07-1612, FNP-ISI-ALT-01, Version 1.0, Proposed Alternative in Accordance with 10 CFR 50.55(a)(3)(i)8 October 2007FNP-ISI-ALT-01, Version 1.0, Proposed Alternative in Accordance with 10 CFR 50.55(a)(3)(i)
ML0732413453 October 2007Email from M. King, NRR to G. Wilson, NRR and K. Cotton, NRR Fyi Fwd: Unit 2 Farley Trip
IR 05000348/20052043 October 2007Letter to Mr. R. Johnson Joseph M. Farley Nuclear Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report Nos. 5000348/2005204 and 05000364/2005204
ML0727601462 October 2007Region II Management Change in Operator Licensing
ML07271059428 September 2007PNO-II-07-009A - Update to Component Cooling Water Pump Breaker Failures
NL-07-1861, Comment (2) of L. M. Stinson on Behalf of Southern Nuclear Operating Co. Inc., Supporting the Comments Submitted by the Nuclear Energy Institute by the Ltr Dated 09/25/2007 Re Draft Regulatory Guide 1021 on Managing the Safety/Security In24 September 2007Comment (2) of L. M. Stinson on Behalf of Southern Nuclear Operating Co. Inc., Supporting the Comments Submitted by the Nuclear Energy Institute by the Ltr Dated 09/25/2007 Re Draft Regulatory Guide 1021 on Managing the Safety/Security Inte
ML07275047021 September 2007MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21Commercial Grade Dedication