NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA RESPONSE NUMBER

- 8REoU4o

, 2008-0016 1 0 ° RESPONSE TO FREEDOM OF o INFORMATION ACT (FOIA) / PRIVACY RESPONSE ACT (PA) REQUEST TYPE 4 P REQUESTER DATE KENDALL CLINTON NOV 1 6 20071 PART I. -- INFORMATION RELEASED D* No additional agehcy records subject to the request have been located.

H* Requested records are available through another public distribution program. See Comments section.

APPENDICES Agency records subject to the request that are identified in the listed appendices are already available for A public inspection and copying at the NRC Public Document Room.

APPENDICES Agency records subject to the request that are identified in the listed appendices are being made available for B public inspection and copying at the NRC Public Document Room.

[* Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 11555 Rockville Pike, Rockville, MD 20852-2738.

APPENDICES Agency records subject to the request are enclosed.

- Records subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.

{* We are continuing to process your request.

D* See Comments.

PART LA -- FEES AMOUNT

  • You will be billed by NRC for the amount listed. H] None. Minimum fee threshold not met.

$ H You will receive a refund for the amount listed. Fees waived.

See comments for details PART I.B -- INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE H-] No agency records subject to the request have been located.

D- the Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for reasons stated in Part II.

D* This determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Clearly state on the envelope and inthe letter that it is a "FOIA/PA Appeal."

PART I.C COMMENTS (Use attached Comments continuation Daqe if reauired)

The incoming FOIA/PA-2008-0016 is located in ADAMS at ML072890135.

Records with an ML accession number are available in the NRC's Public Electronic Reading Room at www.nrc.gov/reading-rm/adams/html. For assistance in obtaining any records, please contact the NRC's Public Document Room (PDR) at 1-800-397-4209 or email at pdr@nrc.gov.

SIGNATURE - FREEDOM OF INf ORMATION ACT AND PRIVACY ACT OFFICER Russell A. Nichols '(.-wQ tt- , -

NRC 6-1 ORM464Par 98)PRITEDON 1 ECYLED APE Ths frm as dsiged sin Inorm NRC FORM 464 Part 1 (6-1998) PRINTED ON RECYCLED PAPER This form was designed using InForms

FOIAIRA - 2008-0016 APPENDIX A RECORDS ALREADY PUBLICLY AVAILABLE ACCESSION NO. DATE NUMBER DESCRIPTION(PAGE COUNT)

1. 06/05/06 ML061*570034 LER 06-002-00 for Joseph Farley, Unit regarding Main Steam Isolation Valve Failure to Close. (4 pages)
2. 08/02/07 ML072200446 Joseph Farley Preliminary Yellow Finding. (27 pages)
3. 08/17/07 ML072320116 Joseph Farley supplemental Inspection IP95001 for a White Cooling Water performance Indicator. (19 pages)
4. 08/27/07 ML072390309 Notice of Public Meeting Southern Nuclear Operating Co. Inc. To Discuss Preliminary Yellow Finding for Farley. (5 pages)
5. 08/29/07 ML072410424 Press Release 11-07-040 - NRC to Meet with Souther Nuclear about Inspection Finding at Farley Nuclear Power Plant. (1 page)
6. 08/31/07 ML072430412 Farley 2007 Mid Cycle Letter - Performance Review and Inspection Plan. (5 pages)
7. 09/10/07 ML072530970 Joseph Farley Component Cooling Water Pump Breaker Failures. (1 page)
8. 09/17/07 ML072600107 Press Release 11-07-045 - NRC Sets Public Meeting with Farley on Sept. 20 in Dothan to discuss Inspection of Cooling Water System Breaker Failures. (1 page)
9. 09/17/07 ML072600112 Notice of Public Meeting with Southern Nuclear Operating company to discuss the results of an Augmented Inspection Team Inspection of Component Cooling Water system Breaker Failures at Joseph Farley. (5 pages)
10. 09/19/07 ML072620428 Press Release-11-07-046,,Teiephone Bridge Line Established for Public Meeting Between NRC and Farley Nuclear Power Plant. (1 page)
11. 09/28/07 ML072710594 Update to Component Cooling Water Pump Breaker Failures. (1 page)
12. 10/29/07 ML073030191 Letter from J. Johnson, Southern Company to NRC on Operability Evaluation of AREVA Cutler-Hammer Breakers. (16 pages).

I 0 t FOiA/PA-2008-0016 APPENDIX B RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted identify with *)

NO. DATE DESCRIPTIONI(PAGE COUNT)

1. 06/14/07 Email from M. Ashley, NRR to M. Franovich, NRR, T. Reis, NRR and S. Richards, NRR on SERP - Prelim Yellow - Farley - Wed June 20, 1pm. (1 page)
2. 08/29/07 Email from K. Cotton, NRR to J. Lubinski, NRR on Farley Update.

(3 pages)

3. 09/07/07 Email from M. Ashley, NRR to F. Brown, NRR, J. Circle, NRR, M.

Franovich, NRR and R. Martin, NRR on Reg conference with Farley on Yellow issues on Loss of RHR train. (1 page) 09/10/7 Email from K. Cotton, NRR to T. McGinty, NRR on Farley. (1 4.

page)

5. 09/10/07 Email from K. Cotton, NRR to S. Shaeffer, RII on Farley. (1 page)
6. 09/14/07 Email from K. Cotton, NRR to C. Haney, NRR on Action: Briefing at the Hill re: Farley inspection. (1 page)
7. 09/18/07 Email from T. McGinty, NRR to K. Cotton, NRR on Action: Briefing at the Hill re: farley inspection. (1 page)
8. 09/18/07 Email from D. Decker, NRR to K. Cotton, NRR et al. Re: Farley AITNRC slides.ppt. (1 page)
9. 09/18/07 Email from K. Cotton, NRR to S. Shaeffer, RII on Final Farley AITNRC slides.ppt. (8 pages)
10. 09/18/07 Email from D. Decker, NRR to K. Cotton, NRR et al. Action:

Briefing at the Hill re: farley inspection. (2 pages)

11. 09/18/07 Email from T. McGinty, NRR to S. Alexander, NRR and K. Cotton, NRR on Action: Briefing at the Hill re: farley inspection. (2 pages)
12. 09/18/07 Email from S. Alexander, NRR to D. Decker, NRR et al. Re:

Farley AITNRC slides.ppt. (2 pages)

13. 09/19/07 Email from D. Decker, NRR to K. Cotton, NRR et al. Re: Final copy Farley AITNRC slides.ppt. (8 pages)

. . -- b

14. 09119/07 Email from D. Decker, NRR to K. Cotton, NRR et al. on Re: Farley AITNRC slides.ppt. (1 page)
15. 09/19/07 Email from S. Alexander, NRR to D. Decker, NRR et al. Re: Final copy Farley AITNRC slides.ppt. (1 page)
16. 09/19/07 Email from T. McGinty, NRR to B. Boger, NRR, J. Dyer, NRR, C.

Haney, NRR and J. Wiggins, NRR on Summary: Today brief of Senate EPW Committee Staff on the Farley AIT. (1 page)

17. 10/03/07 Email from M. King, NRR to G. Wilson, NRR and K. Cotton, NRR FYI Fwd: Unit 2 Farley trip. (1 page)
18. 10/22/07 Email from M. Ashley, NRR to R. Martin, NRR and G. Wilson, NRR Re: Supplemental AIT Charter for Farley. (1 page)
19. 10/25/07 Email from M. McConnell, NRR to R. Martin, NRR Re: Briefing on Farley Breaker Inspection. (1 page)
20. 10/25/07 Email from T. McGinty, NRR to M. Franovich, NRR et al. Fwd:

Confirmation of Action for Farley. (4 pages)

21. 10/30/07 Email from G. Wilson, NRR to K. Miller, NRR, M. McConnell, NRR and R. Martin, NRR Re: Inspection of Cutler Hammer? (1 page)