Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07053007231 December 2006Wat - Init Exam - 11/2006 - Draft Written ExamBoric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Fuel cladding
Power change
ML06362041827 December 2006Response to Request for Additional Information (RAI) Regarding Rf 13 Steam Generator Tube Inspections
ML06356037022 December 2006Comments and Information Related to Steam Generator Batwing Degradation and Continued Plant Operation
ML06346025821 December 2006Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure)
TAC:MD315220 December 2006
W3F1-2006-0070, Entergy Actions to Address RF14 Batwing Failures20 December 2006Entergy Actions to Address RF14 Batwing FailuresGrab sample
Flow Induced Vibration
ML06349019819 December 2006Closeout of Bulletin 2005-02, Emergency Preparedness and Response Actions for Security-based Events
TAC:MC789019 December 2006
W3F1-2006-0068, Core Operating Limits Report - Cycle 15 Revision 014 December 2006Core Operating Limits Report - Cycle 15 Revision 0Shutdown Margin
Coatings
ML06347059914 December 2006Plant Service List
ML06346044013 December 2006Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050)
W3F1-2006-0063, 10 CFR 50.46 Thirty-Day Report for Changes to the Plant Emergency Core Cooling System Performance Analysis6 December 200610 CFR 50.46 Thirty-Day Report for Changes to the Plant Emergency Core Cooling System Performance AnalysisCoatings
Fuel cladding
TAC:MD10485 December 2006
ML0633803175 December 2006Enclosure 1 - Addressee List
ML07053010523 November 2006Wat - Init Exam - 11/2006 - Final OutlineShutdown Margin
W3F1-2006-0065, Initial Exam - 11/2006 - Licensee Post Exam Comments22 November 2006Initial Exam - 11/2006 - Licensee Post Exam CommentsShutdown Margin
ML07053062022 November 2006Init Exam - 11/2006 - Licensee Post Examination Comments
IR 05000382/200600416 November 2006IR 05000382-06-004, on 07/08/2006 - 10/07/2006, Waterford, Unit 3, Post-Maintenance TestingStroke time
Temporary Modification
Significance Determination Process
ML07053009213 November 2006Wat - Init Exam - 11/2006 - Final Operating ExamBoric Acid
Shutdown Margin
Met Tower
Job Performance Measure
Downpower
CNRO-2006-00052, Notification of Management Changes13 November 2006Notification of Management Changes
ML07053006310 November 2006Init Exam - 11/2006 - Draft OutlinesShutdown Margin
ML07053011610 November 2006Init Exam - 11/2006 - Written Exam Comments
ML0705300459 November 2006Init Exam - 11/2006 - Public Forms
ML0631206047 November 2006Init Exam - 11/2006 - Notification of NRC Initial Operator Licensing Examination Approval
W3F1-2006-0059, Core Operating Limits Report - Cycle 14 Revision 0 Change 17 November 2006Core Operating Limits Report - Cycle 14 Revision 0 Change 1Shutdown Margin
Coatings
W3F1-2006-0057, Supplement to License Amendment Request to Delete Vendor Recommended Diesel Generator Surveillance Requirement7 November 2006Supplement to License Amendment Request to Delete Vendor Recommended Diesel Generator Surveillance Requirement
ML06304072130 October 2006Response to NRC Inspection Report 05000382-06-003 Notice of Violation
IR 05000382/200600726 October 2006IR 05000382-06-007 on 10/02/2006 - 10/05/2006 for Waterford Steam Electric Station, Unit 3; Security Baseline Inspection - Letter OnlyAffidavit
CNRO-2006-00049, Arkansas, Units 1 & 2, and Waterford 3 - Updated Correspondence Service List25 October 2006Arkansas, Units 1 & 2, and Waterford 3 - Updated Correspondence Service List
ML06277032419 October 2006Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)
ML06293030218 October 2006Response to NRC Inspection Report 05000382/2006009 Notice of Violation
ML06244019812 October 2006Request for Withholding Information from Public Disclosure (CAW-06-2118)
ML06270064211 October 2006Request for Additional Information Regarding Steam Generator Tube Inspections
TAC:MC87966 October 2006
ML0628400856 October 2006Technical Specification Pages - Issuance of Amendment Removal of Limitation to Perform Surveillances Only During Shutdown
ML0619304216 October 2006License Amendment #210 Core Operating Limits ReportCoatings
Fuel cladding
ML0621200286 October 2006Issuance of Amendment Removal of Limitation to Perform Surveillances Only During Shutdown
TAC:MC87676 October 2006
ML0628400756 October 2006Technical Specification Pages - Issuance of Amendment #210 Core Operating Limits ReportShutdown Margin
Coatings
IR 05000382/20060105 October 2006IR 05000382-06-010, on 08/07-25/2006, Waterford, Unit 3, Triennial Fire Protection InspectionSafe Shutdown
Fire Barrier
Enforcement Discretion
Fire impairment
Emergency Lighting
Significance Determination Process
Continuous fire watch
Fire Protection Program
Fire Watch
ML0622302812 October 2006GGNS, IP1, IP2, IP3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits - Letter to Entergy Operations, Inc. Enclosing Safety EvaluationMururoa
ML0621902422 October 2006GGNS, IP-1, IP-2, IP-3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Request for Use of Delta Protection'S Self Fed Single Use Mururoa Blu Suit Systems - Letter to Entergy Operations, Inc. Enclosing Safety EvaluationMururoa
ML0621201542 October 2006GGNS, IP-1, IP-2, IP-3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Application to Use Effective Dose Equivalent Weighting Factors for External Exposure
W3F1-2006-0053, Reply to Notice of Violation: EA-06-13629 September 2006Reply to Notice of Violation: EA-06-136
ML06272017228 September 2006Tech Spec Pages for Amendment 208 Regarding Partial Approval of Request Associated with the Ultimate Heat Sink Dry Cooling Tower FansUltimate heat sink
CNRO-2006-00045, Entergy Operations Inc. - Proof of Financial Protection (10 CFR 140.15); River Bend, Grand Gulf, Arkansas Nuclear One, Waterford 328 September 2006Entergy Operations Inc. - Proof of Financial Protection (10 CFR 140.15); River Bend, Grand Gulf, Arkansas Nuclear One, Waterford 3
ML06248011428 September 2006Issuance of Amendment Re; Partial Approval of Request Associated with the Ultimate Heat Sink Dry Cooling Tower FansUltimate heat sink
Tornado Missile
Probabilistic Risk Assessment
Tornado Missile Protection
TORMIS
ML06277031828 September 2006Transmittal of Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Proprietary/Non-Proprietary)
TAC:MC506528 September 2006
W3F1-2006-0052, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation, Waterford Steam Electric Station, Unit 326 September 2006License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation, Waterford Steam Electric Station, Unit 3Packing leak
Grab sample
Safe Shutdown Earthquake
Pressure Boundary Leakage
Power change