ES-401 Record of Rejected K/As Form ES-401-4 Waterford 3 11/10/2006 Tier /

Group Randomly Selected K/A Reason for Rejection 1/2 RO 003/AK3.03 Knowledge of the reasons for the following responses as they apply to the Dropped Control Rod: Turbine automatic runback with reactor in order to balance power output.

Rejected due to KA not applicable to Waterford 3 and similarities with Operating Test.

Replaced with 005/AK3.04 2/1 RO 007/A1.01 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS controls including: Maintaining Quench Tank water level within limits.

Rejected due to this K/A being too similar to question 87 on the SRO portion of this exam. Replaced system with 013, but maintained A1.01.

2/2 RO 028/K2.01 Knowledge of bus power supplies to the following: Hydrogen Recombiners.

Rejected due to over sampling of power supply K/As. A3 was not originally selected for Tier 2 group 2, No A3 K/As existed for 028.

Replaced with 041/A3.02 1/1 SRO 054/AA2.02 Ability to determine and interpret the following as they apply to the Loss of Main Feedwater (MFW): Differentiation between loss of all MFW and trip of one MFW pump.

Rejected due to similarity with Operational Exam.

Replaced with AA2.06 1/1 SRO E55/2.2.25 Knowledge of bases in technical specifications for limiting conditions for operations and safety limits.

Rejected due to no technical specification bases relating to SBO.

Replaced with 2.4.48 (kept E55).

2/1 SRO 061/A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup of MFW pump during AFW operation.

Rejected due to Low Operational value for discriminatory SRO level question.

Replaced with A2.03 1/2 SRO 037/2.1.34 Ability to maintain primary and secondary plant chemistry within allowable limits.

Rejected the Generic K/A due to having low validity regarding Operations decisions relating both primary and secondary chemistry control to SGTL.

Replaced with 2.4.11 NUREG-1021, Revision 9

SRO/RO written Revisions NRC comments/Operations Feedback RO NRC/OPS COMMENT RESOLUTIONS COMMENT RESOLUTION 1.

2.

3.

NRC 4.

Change to Direct From Bank.

Done NRC 5.

A & C have 2 actions, stem asks for one.

Stem asks What is required instead of What ONE action is required 6.

OPS 7.

Editorial changes based on Operations feedback to add realism for common fault of both trains of SDC Stated that both SDC trains are lost due to a common fault.

8.

9.

10.

NRC 11.

466°F implausible.

Chaged to 449°F (Sat temp for 550 psia) 12.

OPS 13.

NRC 14.

Provide NRC LO to prove RO level.

Editorial changes based on Operations feedback for common nomenclature for equipment ventilation LO provided to NRC Changed verify equipment ventilation to open Control Room and PAC doors.

15.

16.

17.

18.

19.

20.

21.

OPS 22.

Editorial changes based on Operations feedback for accepted nomenclature Changed Refueling Ventilation with RAB Normal Ventilation to Containment Purge is in the Refueling Mode, which is more in-line with Operations.

23.

NRC 24.

Change to fundamental Done 25.

OPS 26.

Editorial changes based on Operations feedback swapped distractors for human factoring added initial condition to clarify valve alignment Swapped answers B and C.

RO NRC/OPS COMMENT RESOLUTIONS COMMENT RESOLUTION 27.

28.

29.

30.

31.

32.

OPS 33.

Editorial changes based on Operations feedback Added conditions to stem to allow SIAS reset for distractors C&D to be more plausible to Operations 34.

35.

36.

37.

NRC 38.

Tests knowledge of ECCS, not effect of loss.

Changed to ask for the effect of a loss of ECCS NRC 39.

Change to fundamental, Provide NRC LO to prove RO level.

Done 40.

41.

42.

OPS 43.

Editorial changes based on Operations feedback.

Moved the A designation to the stem of the question.

OPS 44.

Editorial changes based on Operations feedback.

Corrected MS-417 valve number in distractor D. Added depressurize steam header to distracters A and C to more closely match procedure verbiage.

45.

46.

OPS 47.

Editorial changes based on Operations feedback.

Added valve number and noun name to SI-116A(B) in stem for clarification.

NRC 48.

Change to high cognitive Done NRC 49.

Only meets part of K/A.

Added statement for using procedure to mitigate consequences of failure.

NRC 50.

D is not credible with conditions in stem. Need refs to verify B is not correct. New Question (cognitive level 2)

Complete revision. Original procedure did not contain enough actions for enough good distracters. Now using High Activity in CCW.

51.

52.

NRC 53.

B and C easily eliminated.

Rephrased stem to make B and C plausible.

NRC 54.

Provide NRC LO to prove RO level.

LO provided to NRC.

NRC 55.

Wording in stem eliminates Shield Building.

Convinced NRC of the plausibility of Shield Building.

RO NRC/OPS COMMENT RESOLUTIONS COMMENT RESOLUTION 56.

57.

NRC 58.

Change to Direct From Bank.

Done NRC 59.

Spell out OOS. Need to reverse question to malfunction effect on NIS.

Created new question.

60.

NRC 61.

Spell out OOS. Need refs to verify distracters.

Spelled out OOS. Linked stem to procedure.

62.

63.

NRC OPS 64.

Editorial changes based on Operations feedback, removed unnecessary wording.(direct) Change to Direct From Bank.

Removed and then take Action a, which added no value to the stem.

Changed to Direct from Bank.

NRC 65.

Change GPM to GPD.

Done 66.

NRC 67.

Stem implies further action required.

Added if any to stem.

NRC 68.

Kirk - Rewrite. C & D not plausible.

Created new question.

NRC 69.

Kirk - Rewrite.

Created new question.

70.

71.

NRC OPS 72.

Editorial changes based on Operations feedback, (explanation) Kirk - F. D is not clear.

Reworded to make more plausible for Operations.

Reworded to be more in-line with Operations.

NRC 73.

Kirk - Tie to procedure. B may be true. D not plausible.

Tied to procedure. Reworded stem to ensure B is clearly false. Revised D.

74.

NRC 75.

D not credible with 1-hr action item.

Changed D to indicate the valve fails as-is.

This is a true statement, but outweighed by protecting personnel in the CR.

SRO NRC COMMENT RESOLUTIONS NRC COMMENT W3 RESOLUTIONS NRC 76.

Delete most from stem. Create new distracter C (LOCA & SGTR not credible)

Deleted most. Added LOOP condition to stem and to distracter C.

NRC 77.

Rewrite to give conditions and ask correct actions for K/A match.

Provided conditions in the stem and actions in the answers. Converted from LOCA to SGTR.

NRC 78.

Delete from stem that other DCT fans are operable. Insert are in distracter D.

Corrected as described.

OPS 79.

Editorial changes based on Operations feedback.

Changed distracter C to 60 % to make conditions not as close to solid pressurizer.

NRC 80.

Delete 2nd part of question that has desired/undesired statements. Update Explanation.

Corrected as described.

OPS 81.

Editorial changes based on Operations feedback.

Changed value in stem to 35°F to give margin from 28qF subcooled margin limit.

OPS 82.

Editorial changes based on Operations feedback.

Reworded stem to more closely follow accepted procedural guidance.

NRC 83.

Need new question Rejected old K/A. Added K/A of 2.4.11. Created new question 84.

85.

86.

NRC 87.

Give NRC OP-008-003, Precaution 3.1.2 as a reference Corrected as described.

NRC 88.

Tie to procedure Corrected as described.

NRC 89.

Tie to procedure. Spell out OOS.

Corrected as described.

NRC OPS 90.

Editorial changes based on Operations feedback. Spell out OOS Spelled out OOS Added clarification to stem to clarify fault caused loss of Bus.

91.

92.

NRC 93.

Tie to procedure (OP-009-004)

Corrected as described.

94.

95.

OPS 96.

Editorial changes based on Operations

feedback, Changed SM only to DPM, SM only is too close to SM or designee per procedure.

NRC OPS 97.

Editorial changes based on Operations feedback. Tie to procedure (OP-005-001)

Removed unnecessary wording. Removed determine need for evacuation from 3 distracters Corrected as described.

98.

NRC 99.

Add to stem that maintenance personnel are in Cntmt OPS saw the answers to this question and procedure trivia.

Rephrased question and added all new answers (no longer need to add maintenance personnel are in Cntmt). This question was seen by OPS as trivia knowledge.

100.

Blue previously approved by NRC, Operations comments incorporated Red NRC Comments Questions 7, 13, 22, 26, 33, 43, 44, 47, 64, 72, 79, 81, 82, 90, 96, and 97 were revised beyond NRC comments and require review.

JPM COMMENT RESOLUTIONS Gen Bold only Critical Steps Gen Initiating Cue: Add IAW procedure if you are going to provide candidate a procedure.

Gen Investigate writing a TEAR to include Elec Safety Training in Requal (Lymanss comment)

Gen Investigate writing a DR to see if RCPs starts are delayed too long (Perrys comment)

A Delete Note on p 3 that Examinee may initiate boration.

Initiating Cue: Add You are the ATC operator.

B Step 8:

Spell out HPSI.

Add note to not use radio to direct NAO if JPM is performed with another JPM (prevent cueing other candidate).

C Does not meet definition of Alternate Path.

D Step 14: Malfunction is RC07C (not A)

E Delete Step 16.

F G

Step 4: Add that candidate will have to cycle CS Open/Closed to close valves.

H I

Initiating Cue: Add IAW procedure J

Initiating Cue: Add IAW procedure.

Initial Conditions: PDP 90 is energized K

ADMIN COMMENT RESOLUTIONS RO1 Provide good straight edges with graphs, and/or allow use of RefLib for graphs.

RO2 Opened Band on step 7 and 11 based on operations feedback RO3 RO4 SRO1 SRO2 SRO3 SRO4 Rework Initiating Cue. CRS review is prior to start of pcdr. Will not get to the point of checking Meteorological conditions. Met shouldnt be signed off.

SRO5 Step 2: should be EP-001-020.

Per Chief examiner request Critical tasks Bolded Add IAW procedure if procedure provided to candidate.

ES-401 W3-11-2006 Written Examination Form ES-401-9 Review Worksheet (password: ) (TAC#: )

Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 1

F 2

S (B) 2 H

4 S

(N) Are ROs required to know the reason for these steps from memory in the procedure and the bases?

3 H

3 S

(N) 4 F

2 S

(B) (NRC02) 5 H

3 X

E (M) Distractors A and C have 2 actions, stem asks for "one" 6

H 3

S (N) 7 H

3 S

(B) (NRC02) 8 H

3 S

(B) 9 H

3 S

(N)

Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1.

Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.

2.

Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).

3.

Check the appropriate box if a psychometric flaw is identified:

The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).

The answer choices are a collection of unrelated true/false statements.

One or more distractors is (are) not credible.

One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4.

Check the appropriate box if a job content error is identified:

The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).

The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).

The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

The question requires reverse logic or application compared to the job requirements.

5.

Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).

6.

Based on the reviewers judgment, is the question as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?

7.

At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

33 of 34 NUREG-1021, Draft Revision 9

ES-401 2

Form ES-401-9 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 10 F

2 S

(N) 11 H

3 X

E (M) (NRC03) Cant see reasonable mistake/error that would yield a 466F answer.

12 H

3 S

(N) 13 H

3 S

(B) 14 F

4 S

(B) 15 F

3 S

(N) 16 F

3 S

(N) 17 H

4 S

(M) 18 F

3 S

(B) (NRC02) 19 F

3 S

(N) 20 H

3 S

(N) 21 F

3 S

(N) 22 F

3 S

(B) (NRC02) 23 F

3 S

(N) 24 F

3 S

(N) 25 F

3 S

(N) 26 H

3 S

(N) 27 F

3 S

(N) 28 H

3 S

(N) 29 H

3 S

(N) 34 of 34 NUREG-1021, Draft Revision 9

ES-401 2

Form ES-401-9 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/

S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 30 H

3 S

(B) (NRC02) 31 H

3 S

(N) 32 H

3 S

(N) 33 H

3 S

(N) 34 H

3 S

(N) 35 H

3 S

(N) 36 H

3 S

(N) 37 H

3 S

(N) 38 F

3 X

U (B) Q appears to test for the knowledge of the ECCS system instead of the effect of a ESFAS loss.

39 F

3 S

(B) 40 H

3 S

(M) (NRC02) 41 F

3 S

(N) 42 H

3 S

(N) 43 F

2 S

(B) 44 H

3 S

(B) 45 F

2 S

(N) 46 F

3 S

(B) 47 H

3 S

(B) 48 H

2 S

(N) 34 of 34 NUREG-1021, Draft Revision 9

ES-401 2

Form ES-401-9 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 49 F

3 X

U (B) (NRC00) Only meets part A of KA.

50 F

3 X

.U (B) (NRC02) Distractor D is not a credible response for the conditions discussed in the stem. Need additional references to verify B is not correct as well 51 H

3 S

(B) 52 F

2 S

(B) 53 F

3 X

U (N) B and C can be eliminated based on stem asking for design of IA system. B and C relate to systems/components served by IA 54 H

3 S

(B) 55 F

3 X

X U

(B) Stem refers to containment vacuum relief, leads on to eliminate Shield Bldg.

56 H

3 S

(N) 57 F

3 S

(B) 58 H

3 S

(B) (NRC04) 59 F

3 X

U (N) KA is effect of malfunction of component interconnections will have on NIS, question is effect of NIS failure on interconnected component. More like KA 6.01.

60 H

3 S

(N) 61 F

3 S

(B) (NRC03) 62 F

3 S

(B) 63 H

3 S

(B) 64 F

3 X

X U

(B) Concentrations given in stem to reduce gases provide a cue to Oxygen. Grammatical clues in sentence structure make distractors C &

D not plausible.

65 F

3 X

E (N) Need to change GPM to GPD in stem.

66 F

2 S

(B) 34 of 34 NUREG-1021, Draft Revision 9

ES-401 2

Form ES-401-9 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 67 H

3 X

U (B) D is only answer with may continue, stem asks for required action implies something needs to be done.

68 H

3 X

X U

(N) D is only answer which has equipment damage. Distractors C&D are not plausible.

69 F

2 X

U (N) Only place there is irradiated fuel is in the core which is in the containment. Since the RX head exceeds 2000lbs, you can eliminate Distractors B and D.

70 H

2 S

(N) 71 H

3 S

(B) (NRC04) 72 F

2 E

(B) (NRC02) Explanation for Distractor D is not clear.

73 F

2 X

U (B) (NRC03) Stem should state IAW Procedure OP-901414 or Distractor B could also be true.

74 F

2 S

(B) 75 H

2 X

U (N) D not a credible distractor with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action item.

76 H

3 X

X U

(N) Dont use term "most appropriate" C not credible since SGTR is special case of LOCA.

77 F

3 X

U (N) Question gives the immediate action and asks when it is applicable rather than giving conditions and requiring knowledge of actions required.

78 H

2 X

U (N) Stem incorrectly states that "All other A and B DCT Fans are operable, then D states " DCT fans are inoperable".

79 H

2 S

(M) 80 F

3 X

U (N) A and C can be eliminated because question says that CRS should direct the RO to ensure the desired effect on the RCS temp.

81 H

2 S

(N) 82 H

3 S

(N) 83 F

3 X

U (M) KA is ability to maintain primary and secondary chemistry in spec.,

This question is about reason for spec.

84 H

2 S

(B) (NRC04) 85 H

2 S

(N) 86 H

2 S

(M)

34 of 34 NUREG-1021, Draft Revision 9

ES-401 2

Form ES-401-9 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 87 H

2 E

(N) W here is the requirement that running all four CFCs is prohibited?

88 H

2 X

U (N) Second half of KA to use procedures to correct, control, mitigate is not covered.

89 F

2 X

U (N) KA is to predict impact of the loss of DCand use procedures to correct, control, mitigate. Question asks time limit.

90 H

3 S

(N) 91 H

3 S

(M) (NRC02) 92 F

2 S

(N) 93 H

3 X

E (N) KA is predict impact of fire damage due to failure of FPS to actuate.

This question is how to correct a failure of FPS due to inadvertent CIAS.

You need to add the procedure to the question.

94 H

3 S

(N) 95 H

2 S

(N) 96 F

2 S

(N) 97 F

2 X

U (M) Need to add a reference procedure to meet the K/A.

98 F

2 S

(N) 99 F

2 X

X U

(N) Stem doesnt give information on personnel in containment. Is C still correct if no personnel in containment?

100 F

2 S

(M)

Last two NRC Exams: 2003 & 2004 # used on exam: RO 5, 3-03 & 2-04 SRO 1, 04 34 of 34 NUREG-1021, Draft Revision 9