ML070530116

From kanterella
Jump to navigation Jump to search
Init Exam - 11/2006 - Written Exam Comments
ML070530116
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/10/2006
From:
NRC Region 4
To:
Entergy Operations
References
50-285/06-301
Download: ML070530116 (13)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Waterford 3 11/10/2006 Tier / Randomly Group Selected K/A Reason for Rejection 1/2 RO 003/AK3.03 Knowledge of the reasons for the following responses as they apply to the Dropped Control Rod: Turbine automatic runback with reactor in order to balance power output.

Rejected due to KA not applicable to Waterford 3 and similarities with Operating Test.

Replaced with 005/AK3.04 2/1 RO 007/A1.01 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS controls including: Maintaining Quench Tank water level within limits.

Rejected due to this K/A being too similar to question 87 on the SRO portion of this exam. Replaced system with 013, but maintained A1.01.

2/2 RO 028/K2.01 Knowledge of bus power supplies to the following: Hydrogen Recombiners.

Rejected due to over sampling of power supply K/As. A3 was not originally selected for Tier 2 group 2, No A3 K/As existed for 028.

Replaced with 041/A3.02 1/1 SRO 054/AA2.02 Ability to determine and interpret the following as they apply to the Loss of Main Feedwater (MFW): Differentiation between loss of all MFW and trip of one MFW pump.

Rejected due to similarity with Operational Exam.

Replaced with AA2.06 1/1 SRO E55/2.2.25 Knowledge of bases in technical specifications for limiting conditions for operations and safety limits.

Rejected due to no technical specification bases relating to SBO.

Replaced with 2.4.48 (kept E55).

2/1 SRO 061/A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup of MFW pump during AFW operation.

Rejected due to Low Operational value for discriminatory SRO level question.

Replaced with A2.03 1/2 SRO 037/2.1.34 Ability to maintain primary and secondary plant chemistry within allowable limits.

Rejected the Generic K/A due to having low validity regarding Operations decisions relating both primary and secondary chemistry control to SGTL.

Replaced with 2.4.11 NUREG-1021, Revision 9

SRO/RO written Revisions NRC comments/Operations Feedback RO NRC/OPS COMMENT RESOLUTIONS COMMENT RESOLUTION 1.

2.

3.

NRC 4. Change to Direct From Bank. Done NRC 5. A & C have 2 actions, stem asks for Stem asks What is required instead of one. What ONE action is required 6.

OPS 7. Editorial changes based on Stated that both SDC trains are lost due to a Operations feedback to add realism common fault.

for common fault of both trains of SDC 8.

9.

10.

NRC 11. 466°F implausible. Chaged to 449°F (Sat temp for 550 psia) 12.

OPS 13.

NRC 14. Provide NRC LO to prove RO level. LO provided to NRC Editorial changes based on Changed verify equipment ventilation to Operations feedback for common open Control Room and PAC doors.

nomenclature for equipment ventilation 15.

16.

17.

18.

19.

20.

21.

OPS 22. Editorial changes based on Changed Refueling Ventilation with RAB Operations feedback for accepted Normal Ventilation to Containment Purge is nomenclature in the Refueling Mode, which is more in-line with Operations.

23.

NRC 24. Change to fundamental Done 25.

OPS 26. Editorial changes based on Swapped answers B and C.

Operations feedback swapped distractors for human factoring added initial condition to clarify valve alignment

RO NRC/OPS COMMENT RESOLUTIONS COMMENT RESOLUTION 27.

28.

29.

30.

31.

32.

OPS 33. Editorial changes based on Added conditions to stem to allow SIAS reset Operations feedback for distractors C&D to be more plausible to Operations 34.

35.

36.

37.

NRC 38. Tests knowledge of ECCS, not effect Changed to ask for the effect of a loss of of loss. ECCS NRC 39. Change to fundamental, Provide Done NRC LO to prove RO level.

40.

41.

42.

OPS 43. Editorial changes based on Moved the A designation to the stem of the Operations feedback. question.

OPS 44. Editorial changes based on Corrected MS-417 valve number in distractor Operations feedback. D. Added depressurize steam header to distracters A and C to more closely match procedure verbiage.

45.

46.

OPS 47. Editorial changes based on Added valve number and noun name to Operations feedback. SI-116A(B) in stem for clarification.

NRC 48. Change to high cognitive Done NRC 49. Only meets part of K/A. Added statement for using procedure to mitigate consequences of failure.

NRC 50. D is not credible with conditions in Complete revision. Original procedure did not stem. Need refs to verify B is not contain enough actions for enough good correct. New Question (cognitive distracters. Now using High Activity in CCW.

level 2) 51.

52.

NRC 53. B and C easily eliminated. Rephrased stem to make B and C plausible.

NRC 54. Provide NRC LO to prove RO level. LO provided to NRC.

NRC 55. Wording in stem eliminates Shield Convinced NRC of the plausibility of Shield Building. Building.

RO NRC/OPS COMMENT RESOLUTIONS COMMENT RESOLUTION 56.

57.

NRC 58. Change to Direct From Bank. Done NRC 59. Spell out OOS. Need to reverse Created new question.

question to malfunction effect on NIS.

60.

NRC 61. Spell out OOS. Need refs to verify Spelled out OOS. Linked stem to distracters. procedure.

62.

63.

NRC 64. Editorial changes based on Removed and then take Action a, which OPS Operations feedback, removed added no value to the stem.

unnecessary wording.(direct) Change Changed to Direct from Bank.

to Direct From Bank.

NRC 65. Change GPM to GPD. Done 66.

NRC 67. Stem implies further action required. Added if any to stem.

NRC 68. Kirk - Rewrite. C & D not plausible. Created new question.

NRC 69. Kirk - Rewrite. Created new question.

70.

71.

NRC 72. Editorial changes based on Reworded to make more plausible for OPS Operations feedback, Operations.

(explanation) Kirk - F. D is not Reworded to be more in-line with Operations.

clear.

NRC 73. Kirk - Tie to procedure. B may be Tied to procedure. Reworded stem to ensure true. D not plausible. B is clearly false. Revised D.

74.

NRC 75. D not credible with 1-hr action item. Changed D to indicate the valve fails as-is.

This is a true statement, but outweighed by protecting personnel in the CR.

SRO NRC COMMENT RESOLUTIONS NRC COMMENT W3 RESOLUTIONS NRC 76. Delete most from stem. Create new Deleted most. Added LOOP condition to stem and distracter C (LOCA & SGTR not credible) to distracter C.

NRC 77. Rewrite to give conditions and ask correct Provided conditions in the stem and actions in the actions for K/A match. answers. Converted from LOCA to SGTR.

NRC 78. Delete from stem that other DCT fans are Corrected as described.

operable. Insert are in distracter D.

OPS 79. Editorial changes based on Operations Changed distracter C to 60 % to make conditions not feedback. as close to solid pressurizer.

NRC 80. Delete 2nd part of question that has Corrected as described.

desired/undesired statements. Update Explanation.

OPS 81. Editorial changes based on Operations Changed value in stem to 35°F to give margin from feedback. 28 F subcooled margin limit.

OPS 82. Editorial changes based on Operations Reworded stem to more closely follow accepted feedback. procedural guidance.

NRC 83. Need new question Rejected old K/A. Added K/A of 2.4.11. Created new question 84.

85.

86.

NRC 87. Give NRC OP-008-003, Precaution 3.1.2 as Corrected as described.

a reference NRC 88. Tie to procedure Corrected as described.

NRC 89. Tie to procedure. Spell out OOS. Corrected as described.

NRC 90. Editorial changes based on Operations Spelled out OOS OPS feedback. Spell out OOS Added clarification to stem to clarify fault caused loss of Bus.

91.

92.

NRC 93. Tie to procedure (OP-009-004) Corrected as described.

94.

95.

OPS 96. Editorial changes based on Operations Changed SM only to DPM, SM only is too feedback, close to SM or designee per procedure.

NRC 97. Editorial changes based on Operations Removed unnecessary wording. Removed OPS feedback. Tie to procedure (OP-005-001) determine need for evacuation from 3 distracters Corrected as described.

98.

NRC 99. Add to stem that maintenance personnel are Rephrased question and added all new answers (no in Cntmt longer need to add maintenance personnel are in OPS saw the answers to this question and Cntmt). This question was seen by OPS as trivia procedure trivia. knowledge.

100.

Blue previously approved by NRC, Operations comments incorporated Red NRC Comments Questions 7, 13, 22, 26, 33, 43, 44, 47, 64, 72, 79, 81, 82, 90, 96, and 97 were revised beyond NRC comments and require review.

JPM COMMENT RESOLUTIONS Gen Bold only Critical Steps Gen Initiating Cue: Add IAW procedure if you are going to provide candidate a procedure.

Gen Investigate writing a TEAR to include Elec Safety Training in Requal (Lymanss comment)

Gen Investigate writing a DR to see if RCPs starts are delayed too long (Perrys comment)

A Delete Note on p 3 that Examinee may initiate boration.

Initiating Cue: Add You are the ATC operator.

B Step 8:

Spell out HPSI.

Add note to not use radio to direct NAO if JPM is performed with another JPM (prevent cueing other candidate).

C Does not meet definition of Alternate Path.

D Step 14: Malfunction is RC07C (not A)

E Delete Step 16.

F G Step 4: Add that candidate will have to cycle CS Open/Closed to close valves.

H I Initiating Cue: Add IAW procedure J Initiating Cue: Add IAW procedure.

Initial Conditions: PDP 90 is energized K

ADMIN COMMENT RESOLUTIONS RO1 Provide good straight edges with graphs, and/or allow use of RefLib for graphs.

RO2 Opened Band on step 7 and 11 based on operations feedback RO3 RO4 SRO1 SRO2 SRO3 SRO4 Rework Initiating Cue. CRS review is prior to start of pcdr. Will not get to the point of checking Meteorological conditions. Met shouldnt be signed off.

SRO5 Step 2: should be EP-001-020.

Per Chief examiner request Critical tasks Bolded Add IAW procedure if procedure provided to candidate.

ES-401 W3-11-2006 Written Examination Form ES-401-9 Review Worksheet (password: ) (T AC #: )

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. O ther 6. 7.

Q# LO K LO D (F/H ) (1-5) Stem C ues T /F C red. Partial Job- Minutia #/ Back- Q= SR O U /E/S Explanation Focus D ist. Link units ward K/A O nly 1 F 2 S (B) 2 H 4 S (N ) Are R O s required to know the reason for these steps from mem ory in the procedure and the bases?

3 H 3 S (N )

4 F 2 S (B) (N R C 02) 5 H 3 X E (M ) D istractors A and C have 2 actions, stem asks for "one" 6 H 3 S (N )

7 H 3 S (B) (N R C 02) 8 H 3 S (B) 9 H 3 S (N )

Instructions

[R efer to Section D of ES-401 and Appendix B for additional inform ation regarding each of the following concepts.]

1. Enter the level of knowledge (LO K) of each question as either (F)undam ental or (H )igher cognitive level.
2. Enter the level of difficulty (LO D ) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
3. C heck the appropriate box if a psychometric flaw is identified:

@ T he stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

@ T he stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).

@ T he answer choices are a collection of unrelated true/false statements.

@ O ne or more distractors is (are) not credible.

@ O ne or more distractors is (are) partially correct (e.g., if the applicant can m ake unstated assum ptions that are not contradicted by stem).

4. C heck the appropriate box if a job content error is identified:

@ T he question is not linked to the job requirements (i.e., the question has a valid K /A but, as written, is not operational in content).

@ T he question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).

@ T he question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

@ T he question requires reverse logic or application compared to the job requirements.

5. C heck questions that are sampled for conformance with the approved K /A and those that are designated S R O -only (K/A and license level mismatches are unacceptable).
6. Based on the reviewers judgment, is the question as written (U)nacceptable (requiring repair or replacem ent), in need of (E)ditorial enhancem ent, or (S)atisfactory?
7. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

33 of 34 N U R EG -1021, D raft R evision 9

ES-401 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. O ther 6. 7.

Q# LO K LO D (F/H ) (1-5) Stem C ues T /F C red. Partial Job- Minutia #/ Back- Q= SR O U /E/S Explanation Focus D ist. Link units ward K/A O nly 10 F 2 S (N )

11 H 3 X E (M) (N R C 03) C ant see reasonable mistake/error that would yield a 466F answer.

12 H 3 S (N )

13 H 3 S (B) 14 F 4 S (B) 15 F 3 S (N )

16 F 3 S (N )

17 H 4 S (M )

18 F 3 S (B) (N R C 02) 19 F 3 S (N )

20 H 3 S (N )

21 F 3 S (N )

22 F 3 S (B) (N R C 02) 23 F 3 S (N )

24 F 3 S (N )

25 F 3 S (N )

26 H 3 S (N )

27 F 3 S (N )

28 H 3 S (N )

29 H 3 S (N )

34 of 34 N U R EG -1021, D raft R evision 9

ES-401 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. O ther 6. 7.

Q# LO K LO D (F/H ) (1-5) U/E/ Explanation Stem C ues T /F C red. Partial Job- Minutia #/ Back- Q= SR O S

Focus D ist. Link units ward K/A O nly 30 H 3 S (B) (N R C 02) 31 H 3 S (N )

32 H 3 S (N )

33 H 3 S (N )

34 H 3 S (N )

35 H 3 S (N )

36 H 3 S (N )

37 H 3 S (N )

38 F 3 X U (B) Q appears to test for the knowledge of the EC C S system instead of the effect of a ESFAS loss.

39 F 3 S (B) 40 H 3 S (M) (N R C 02) 41 F 3 S (N )

42 H 3 S (N )

43 F 2 S (B) 44 H 3 S (B) 45 F 2 S (N )

46 F 3 S (B) 47 H 3 S (B) 48 H 2 S (N )

34 of 34 N U R EG -1021, D raft R evision 9

ES-401 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. O ther 6. 7.

Q# LO K LO D (F/H ) (1-5) Stem C ues T /F C red. Partial Job- Minutia #/ Back- Q= SR O U /E/S Explanation Focus D ist. Link units ward K/A O nly 49 F 3 X U (B) (NR C00) O nly meets part A of KA.

50 F 3 X .U (B) (N R C 02) D istractor D is not a credible response for the conditions discussed in the stem. Need additional references to verify B is not correct as well 51 H 3 S (B) 52 F 2 S (B) 53 F 3 X U (N ) B and C can be eliminated based on stem asking for design of IA system. B and C relate to systems/components served by IA 54 H 3 S (B) 55 F 3 X X U (B) Stem refers to containment vacuum relief, leads on to eliminate Shield Bldg.

56 H 3 S (N )

57 F 3 S (B) 58 H 3 S (B) (N R C 04) 59 F 3 X U (N ) K A is effect of malfunction of component interconnections will have on N IS, question is effect of N IS failure on interconnected component. More like KA 6.01.

60 H 3 S (N )

61 F 3 S (B) (N R C 03) 62 F 3 S (B) 63 H 3 S (B) 64 F 3 X X U (B ) C oncentrations given in stem to reduce gases provide a cue to O xygen. G ram matical clues in sentence structure make distractors C &

D not plausible.

65 F 3 X E (N ) N eed to change G P M to G P D in stem .

66 F 2 S (B) 34 of 34 N U R EG -1021, D raft R evision 9

ES-401 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. O ther 6. 7.

Q# LO K LO D (F/H ) (1-5) Stem C ues T /F C red. Partial Job- Minutia #/ Back- Q= SR O U /E/S Explanation Focus D ist. Link units ward K/A O nly 67 H 3 X U (B ) D is only answer with may continue, stem asks for required action implies something needs to be done.

68 H 3 X X U (N ) D is only answer which has equipm ent damage. D istractors C &D are not plausible.

69 F 2 X U (N ) O nly place there is irradiated fuel is in the core which is in the containment. Since the RX head exceeds 2000lbs, you can eliminate D istractors B and D .

70 H 2 S (N )

71 H 3 S (B) (N R C 04) 72 F 2 E (B ) (N R C 02) E xplanation for D istractor D is not clear.

73 F 2 X U (B) (NR C 03) Stem should state IAW Procedure O P-901414 or Distractor B could also be true.

74 F 2 S (B) 75 H 2 X U (N ) D not a credible distractor with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action item .

76 H 3 X X U (N ) D ont use term "most appropriate" C not credible since SG T R is special case of LO CA.

77 F 3 X U (N ) Q uestion gives the immediate action and asks when it is applicable rather than giving conditions and requiring knowledge of actions required.

78 H 2 X U (N ) S tem incorrectly states that "All other A and B D C T Fans are operable, then D states " DC T fans are inoperable".

79 H 2 S (M )

80 F 3 X U (N ) A and C can be eliminated because question says that C R S should direct the R O to ensure the desired effect on the R C S temp.

81 H 2 S (N )

82 H 3 S (N )

83 F 3 X U (M ) K A is ability to maintain primary and secondary chemistry in spec.,

T his question is about reason for spec.

84 H 2 S (B) (N R C 04) 85 H 2 S (N )

86 H 2 S (M )

34 of 34 N U R EG -1021, D raft R evision 9 ES-401 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. O ther 6. 7.

Q# LO K LO D (F/H ) (1-5) U /E/S Explanation Stem C ues T /F C red. Partial Job- Minutia #/ Back- Q= SR O Focus D ist. Link units ward K/A O nly 87 H 2 E (N ) W here is the requirement that running all four C FC s is prohibited?

88 H 2 X U (N ) S econd half of KA to use procedures to correct, control, mitigate is not covered.

89 F 2 X U (N ) K A is to predict impact of the loss of D C and use procedures to correct, control, mitigate. Q uestion asks time limit .

90 H 3 S (N )

91 H 3 S (M) (NR C 02) 92 F 2 S (N )

93 H 3 X E (N ) K A is predict impact of fire damage due to failure of FPS to actuate.

T his question is how to correct a failure of FPS due to inadvertent CIAS.

You need to add the procedure to the question.

94 H 3 S (N )

95 H 2 S (N )

96 F 2 S (N )

97 F 2 X U (M) Need to add a reference procedure to meet the K/A.

98 F 2 S (N )

99 F 2 X X U (N ) Stem doesnt give information on personnel in containment. Is C still correct if no personnel in containment?

100 F 2 S (M )

Last two N R C Exams: 2003 & 2004 # used on exam: R O 5, 3-03 & 2-04 SR O 1, 04 34 of 34 N U R EG -1021, D raft R evision 9