Tech Spec Pages for Amendment 208 Regarding Partial Approval of Request Associated with the Ultimate Heat Sink Dry Cooling Tower Fans
ML062720172
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/28/2006
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Fields M, NRR/DORL/LP4, 415-3062
Shared Package
ML062570486 List:
References
TAC MC5065
Download: ML062720172 (2)


Text

or indirectly any control over (i) the facility, (ii) power or energy produced by the facility, or (iii) the licensees of the facility. Further, any rights acquired under this authorization may be exercised only in compliance with and subject to the requirements and restrictions of this operating license, the AtomicEnergy Act of 1954, as amended, and the NRC's regulations. For purposes of this condition, the limitations of 10 CFR 50.81, as now in effect and as they may be subsequently amended, are fully applicable to the equity investors and any successors in interest to the equity investors, as long as the license for the facility remains in effect.

(b) Entergy Louisiana, LLC (or its designee) to notify the NRC in writing prior to any change in (i) the terms or conditions of any lease agreements executed as part of the above authorized financial transactions, (ii)any facility operating agreement involving a licensee that is in effect now or will be in effect in the future, or (iii) the existing property insurance coverages for the facility, that would materially alter the representations and conditions, set forth in the staff's Safety Evaluation enclosed to the NRC letter dated September 18, 1989. In addition, Entergy Louisiana, LLC or its designee is required to notify the NRC of any action by equity investors or successors in interest to Entergy Louisiana, LLC that may have an effect on the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

1. Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3716 megawatts thermal (100% power) in accordance with the conditions specified herein.
2. Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 20a and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

AMENDMENT NO. 208

PLANT SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION: (Continued)

c. With a Tornado Watch in effect, all 9 DCT fans under the missile protected portion of the DCT shall be OPERABLE. If the number of fans OPERABLE is less than required, restore the inoperable fan(s) to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With any UHS fan inoperable, determine the outside ambient temperature at least once every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and verify that the minimum fan requirements of Table 3.7-3 are satisfied (required only if the associated UHS is OPERABLE),

SURVEILLANCE REQUIREMENTS 4.7.4. Each train of UHS shall be determined OPERABLE:

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the average water temperature and water level to be within specified limits.
b. At least once per 31 days, by verifying that each wet tower and dry tower fan that is not already running, starts and operates for at least 15 minutes.

WATERFORD - UNIT 3 314 7-13 AMENDMENT NO. 95,123, 208