Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
ML06362043522 December 2006Comment (46) of Beth A. Wetzel, on Behalf of TVA Re Draft Regulatory Guide DG-1172, Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants, Enclosed Comments Should Be Considered ESI-EMD Owners Group and Tva'S C
ML06346025821 December 2006Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure)
ML06318020621 December 2006Safety Evaluation of Relief Request for the Third 10-year Inservice Inspection Interval and Test Program for SnubbersIncorporated by reference
ML06362040921 December 2006Pressurizer Weld Overlay Examination Results to Relief Request G-RR-1Weld Overlay
ML06362041121 December 2006Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Supplemental ResponseBoric Acid
Coatings
ML06362040720 December 2006Steam Generator Tube Plugging Report - SG Tube Inspections During Unit 2 Cycle 14 Refueling Outage
ML06362040620 December 2006Cycle 15 Core Operating Limits Report (COLR) Revision
TAC:MC779518 December 2006
ML06317044318 December 2006Units 1 and 2: and Watts Bar Nuclear Plant, Unit 1, Response to Bl 05-002 Emergency Preparedness and Response Actions for Security Based Events.
ML06347059914 December 2006Plant Service List
ML06353016013 December 2006Discharge Monitoring Report for November 2006Veliger
ML06346044013 December 2006Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050)
ML07033002011 December 2006Summary of Conference Call Regarding Steam Generator Tube Inspections
ML06312057511 December 2006License Amendment, Issuance of Amendment Regarding Alternate Rod Position Monitoring Method (TAC Nos. MD2514 and MD2515) (TS-06-04)Shutdown Margin
TAC:MD353411 December 2006
ML06348048011 December 2006Technical Specifications, Issuance of Amendment Regarding Alternate Rod Position Monitoring Method
ML0634700297 December 2006Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes Supplemental InformationSafe Shutdown
Boric Acid
Ultimate heat sink
Coatings
Biofouling
ML0703103906 December 2006E-mail from: E. Vigluicci to C. Evans Pugh Decision and Order
ML0634201226 December 2006American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI- Reactor Pressure Vessel Head Penetration Tube Remote Inner-Diameter Temper Bead RepairHydrostatic
Operating Basis Earthquake
VT-2
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
TAC:MD10335 December 2006
ML0633803175 December 2006Enclosure 1 - Addressee List
ML06317032130 November 2006Correction to Amendments Regarding Addition of Limiting Condition for Operation 3.0.7 on Inoperable Snubbers
ML06353020830 November 2006Correction to Amendments Regarding Addition of Limiting Condition for Operation 3.0.7 on Inoperable Snubbers - Unit 1 Tech Specs - S118819Time of Discovery
Liquid penetrant
ML06339066530 November 2006Additional Supplement to Technical Specification Change 05-09 - Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity and Deletion of License ConditionShutdown Margin
Offsite Dose Calculation Manual
Tornado Missile
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Process Control Program
Earthquake
Pressure Boundary Leakage
ML06353020130 November 2006Correction to Amendments Regarding Addition of Limiting Condition for Operation 3.0.7 on Inoperable Snubbers - Tech Specs Unit 2 - S118818Time of Discovery
Liquid penetrant
TAC:MD011030 November 2006
ML06334043529 November 2006Response to Request for Additional Information Regarding the Unit 2 12-Month Steam Generator (SG) Report from the Unit 2 Cycle 13 Refueling Outage
ML07137032224 November 2006Enclosure 3, Offsite Dose Calculation Manual, Revision 51Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML06313044222 November 2006RAI, Technical Specification Change Request for Ultimate Heat SinkUltimate heat sink
TAC:MD262122 November 2006
ML06325031821 November 2006Alleged Employment Discrimination Against a Security Officer (OI Case No. 4-2006-011)
ML06328002521 November 2006Preemptive Weld Overlays (Pwol) on Alloy 600 Pressurizer Nozzle-to-Pipe Welds and Associated Alternative Repair Techniques - Generic Request for Relief G-RR-1 - Supplemental Information (TAC No. MD2381 & MD2382)Weld Overlay
Nondestructive Examination
ML06325047620 November 2006Annual Environmental Operating Report for Period October 1, 2005 Through September 30, 2006
TAC:MD144316 November 2006
ML06346005316 November 2006License Amendment, Issuance of Amendments Regarding Extended Burnup of Framatome FuelAnticipated operational occurrence
ML06339056516 November 2006Technical Specifications, Issuance of Amendments Regarding Extended Burnup of Framatome FuelShutdown Margin
Hydrostatic
ML06321032514 November 2006Discharge Monitoring Report for October 2006 and Entrainment Monitoring, 2004 Final ReportVeliger
ML0631800589 November 2006Reactor and Senior Reactor Operator Initial Examination - Sequoyah Nuclear Plant 05000327-07-301 and 05000328-/07-301
ML0630502167 November 2006Issuance of Amendment Regarding NRC Generic Letter 2004-02Loop seal
Coatings
ML0628407167 November 2006RAI Re SG Tube Integrity Technical Specification Amendment
ML0631300537 November 2006Changes to Distribution Lists for TVA Dockets, Browns Ferry, Sequoyah, and Watts Bar
ML06299004125 October 2006IR 05000327-06-004 and IR 05000325-06-004, on 09/30/2006, Tennessee Valley AuthorityUltimate heat sink
Fire Barrier
Temporary Modification
Feedwater Controller Failure
Downpower
ML06304031624 October 20062006 Discharge Monitoring Report - Quality Assurance (DMR-QA) Study 26 Provider-Graded Test Results - Final Report
ML06297010120 October 2006Preemptive Weld Overlays on Alloy 600 Pressurizer Nozzle-to-Pipe Welds and Associated Alternative Repair Techniques - Generic Request for Relief G-RR-1 - TVA Response to RAIHigh Radiation Area
Weld Overlay
Dissimilar Metal Weld
DM weld
ML06267001420 October 2006Ltr. Response to GL 2003-01, Control Room Habitability (TAC Nos. MB9856 & MB9857)
IR 05000327/200600720 October 2006IR 05000327-06-007 & 05000328-06-007 for Sequoyah Nuclear Plant - NRC Physical Security Baseline Inspection ReportSignificance Determination Process
Affidavit
TAC:MB985620 October 2006
ML06284071519 October 2006RAI, 2005 SG Tube Inspections