November 9, 2006
Tennessee Valley Authority
ATTN: Mr. Karl W. Singer
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
SEQUOYAH NUCLEAR PLANT 05000327/2007301 AND 05000328/2007301
Dear Mr. Singer:
In a telephone conversation on November 7, 2006, between Mr. James Reisenbuechler,
Operations Training Manager and Mr. Mark A. Bates, Sr. Operations Engineer, arrangements
were made for the administration of licensing examinations at the Sequoyah Nuclear Plant
during the week of April 9, 2007. The on-site preparatory week is scheduled for the week of
March 19, 2007.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors." The NRC regional office will discuss with your staff any changes that might
be necessary before the examination is administered. Your staff will also provide copying
services for administering the exam.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by January 23, 2007. The written examinations, operating tests, and the supporting
reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material
Guidelines For Initial Licensing Examinations, will be due by February 23, 2007. Pursuant to
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examination and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with NUREG 1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility
available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering
Operating Tests To Initial License Applicants, your staff should retain the original simulator
performance data (e.g., system pressures, temperatures, and levels) generated during the
dynamic operating tests until the examination results are final.
2
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,
contains a number of NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for writing the examinations, and reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Reisenbuechler has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Mark A. Bates at (404) 562-4612,
(Internet E-mail: mab7@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
Sincerely,
/RA By R. Baldwin for/
Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-327, 50-328
cc: (See Page 3)
_________________________
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA By R. Baldwin for/
/RA By L. Garner for/
NAME
MBates
RHaag
MWidmann
DATE
11/8/06
11/8/06
11/08/06
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
3
cc cont'd
Ashok S. Bhatnagar
Senior Vice President
Nuclear Operations
Tennessee Valley Authority
Electronic Mail Distribution
Preston D. Swafford
Senior Vice President
Nuclear Support
Tennessee Valley Authority
Electronic Mail Distribution
Larry S. Bryant, Vice President
Nuclear Engineering &
Technical Services
Tennessee Valley Authority
Electronic Mail Distribution
Randy Douet
Site Vice President
Sequoyah Nuclear Plant
Electronic Mail Distribution
General Counsel
Tennessee Valley Authority
Electronic Mail Distribution
John C. Fornicola, General Manager
Nuclear Assurance
Tennessee Valley Authority
Electronic Mail Distribution
Glenn W. Morris, Manager
Licensing and Industry Affairs
Sequoyah Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
Russell R. Thompson, Acting Manager
Corporate Nuclear Licensing and
Industry Affairs
Tennessee Valley Authority
4X Blue Ridge
1101 Market Street
Chattanooga, TN 37402-2801
Robert H. Bryan, Jr., General Manager
Licensing and Industry Affairs
Sequoyah Nuclear Plant
Tennessee Valley Authority
4X Blue Ridge
1101 Market Street
Chattanooga, TN 37402-2801
David A. Kulisek, Plant Manager
Sequoyah Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
Lawrence E. Nanney, Director
TN Dept. of Environment & Conservation
Division of Radiological Health
Electronic Mail Distribution
County Mayor
Hamilton County Courthouse
Chattanooga, TN 37402-2801
Ann Harris
341 Swing Loop
Rockwood, TN 37854
James H. Bassham, Director
Tennessee Emergency Management
Agency
Electronic Mail Distribution
Mr. Ronald J. Bruno
Training Manager
Sequoyah Nuclear Plant
P. O. Box 2000
Soddy-Daisy, TN 37384-2000
4
Distribution:
Bob Pascarelli, NRR
D. Pickett, NRR
C. Evans (Part 72 Only)
L. Slack, RII EICS
OE Mail (email address if applicable)
RIDSNRRDIRS
PUBLIC