Letter Sequence Approval |
---|
|
|
MONTHYEARML0634600532006-11-16016 November 2006 License Amendment, Issuance of Amendments Regarding Extended Burnup of Framatome Fuel Project stage: Approval ML0633905652006-11-16016 November 2006 Technical Specifications, Issuance of Amendments Regarding Extended Burnup of Framatome Fuel Project stage: Approval 2006-11-16
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection CNL-16-178, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-12-23023 December 2016 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System2016-05-31031 May 2016 Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program ML15310A0422015-11-0404 November 2015 License Amendment Nos. 334 and 327, Improved Technical Specifications, Implementation CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information2015-10-23023 October 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions2015-08-0505 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4142015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 CNL-15-156, Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 ML15205A4062015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 ML15205A4072015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4082015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 ML15205A4092015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 ML15205A4112015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 ML15205A4122015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 ML15205A4132015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 ML13330A9242013-11-22022 November 2013 Enclosure 2 - Volume 12 - Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems ML13330A9272013-11-22022 November 2013 Enclosure 2 - Volume 13 - Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems ML13329A7182013-11-22022 November 2013 Enclosure 1 - Improved Technical Specifications (ITS) Submittal, Enclosure 3 - Licensee Identified Changes That May Require a Formal Technical Branch Review Through Enclosure 10 ML13330A9282013-11-22022 November 2013 Enclosure 2 - Volume 9 - Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0 ML13329A7902013-11-22022 November 2013 Enclosure 2 - Volume 3 - Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0 ML13330A9312013-11-22022 November 2013 Enclosure 2 - Volume 11 - Improved Technical Specifications Conversion, ITS Section 3.6, Containment Systems ML13330A9532013-11-22022 November 2013 Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On.. ML13330A9302013-11-22022 November 2013 Enclosure 2 - Volume 14 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations ML13330A9292013-11-22022 November 2013 Enclosure 2 - Volume 10 - Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 0 ML13330A9252013-11-22022 November 2013 Enclosure 2 - Volume 15 - Improved Technical Specifications Conversion, ITS Chapter 4.0, Design Features, Revision 0 ML13330A9222013-11-22022 November 2013 Enclosure 2 - Volume 16 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls, Revision 0 ML13329A9162013-11-22022 November 2013 Sequoyah, Units 1 and 2, Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 0 ML13329A8592013-11-22022 November 2013 Enclosure 2 - Volume 7 - Improved Technical Specifications Conversion, ITS Section 3.2 Power Distribution Limits, Revision 0 ML13329A8582013-11-22022 November 2013 Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.1 Reactivity Control Systems, Revision 0 2024-01-29
[Table view] |
Text
ADMINISTRATIVE CONTROLS MONTHLY REACTOR OPERATING REPORT 6.9.1.10 DELETED.
CORE OPERATING LIMITS REPORT 6.9.1.14 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT before each reload cycle or any remaining part of a reload cycle for the following:
- 1. fi(AI) limits for Overtemperature Delta' T Trip Setpoints and f2(AI) limits for Overpower Delta T Trip Setpoints for Specification 2.2.1.
- 2. Moderator Temperature Coefficient BOL and EOL limits and 300 ppm surveillance limit for Specification 3/4.1.1.3,
- 3. Shutdown Bank Insertion Limit for Specification 3/4.1.3.5,
- 4. Control Bank Insertion Limits for Specification 3/4.1.3.6,
- 5. AXIAL FLUX DIFFERENCE Limits for Specification 3/4.2.1,
- 6. Heat Flux Hot Channel Factor and K(z) for Specification 3/4.2.2, and
- 7. Nuclear Enthalpy Rise Hot Channel Factor for Specification 3/4.2.3.
6.9.1.14.a The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by NRC, specifically those described in the following documents:
The COLR will contain the complete identification for each of the TS referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).
- 1. BAW-10180P-A, "NEMO - Nodal Expansion Method Optimized"
.2. BAW-10169P-A, "RSG Plant Safety Analysis - B&W Safety Analysis Methodology for Recirculating Steam Generator Plants"
- 3. BAW-1 01 63P-A, "Core Operating Limit Methodology for Westinghouse-Designed PWRs"
- 4. BAW-10168P-A, "RSG LOCA - B&W Loss of Coolant Accident Evaluation Model for Recirculating Steam Generator Plants" SEQUOYAH - UNIT 1 6-13 Amendment No. 52, 58, 72, 74, 117, 152, 155, 156, 171,216, 223,281,300, 314
ADMINISTRATIVE CONTROLS CORE OPERATING LIMITS REPORT (continued)
- 5. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code"
- 6. WCAP-10266-P-A, "The 1981 Revision of Westinghouse Evaluation Model Using BASH CODE"
- 7. BAW-10227P-A, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel"
- 8. BAW-10186-A, "Extended Burnup Evaluation" 6.9.1.14.b The core operating limits shall be determined so that all applicable limits (e.g.,fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met.
6.9.1.14.c THE CORE OPERATING LIMITS REPORT shall be provided within 30 days after cycle start-up (Mode 2) for each reload cycle or within 30 days of issuance of any midcycle revision of the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.
REACTOR COOLANT SYSTEM (RCS) PRESSURE AND TEMPERATURE LIMITS (PTLR) REPORT 6.9.1.15 RCS pressure and temperature limits for heatup, cooldown, low temperature operation, criticality, and hydrostatic testing, LTOP arming, and PORV lift settings as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:
Specification 3.4.9.1, "RCS Pressure and Temperature (PIT) Limits" Specification 3.4.12, "Low Temperature Over Pressure Protection (LTOP) System" 6.9.1.15.a The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. Westinghouse Topical Report WCAP-14040-NP-A, "Methodology used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves."
- 2. Westinghouse Topical Report WCAP-15293, "Sequoyah Unit 1 Heatup and Cooldown Limit Curves for Normal Operation and PTLR Support Documentation."
- 3. Westinghouse Topical Report WCAP-1 5984, "Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Sequoyah Units 1 and 2."
6.9.1.15.b The PTLR shall be provided to the NRC within 30 days of issuance of any revision or supplement thereto.
STEAM GENERATOR TUBE INSPECTION REPORT 6.9.1.16 A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 6.8.4.k, Steam Generator (SG) Program. The report shall include:
SEQUOYAH - UNIT 1 6-13a Amendment No. 52, 58, 72, 74, 117,155,223,241,258,294,297,306, 314
ADMINISTRATIVE CONTROLS MONTHLY REACTOR OPERATING REPORT 6.9.1.10 DELETED CORE OPERATING LIMITS REPORT
.6.9.1.14 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT before each reload cycle or any remaining part of a reload cycle for the following:
- 1. f1(AI) limits for Overtemperature Delta T Trip Setpoints and f2(AI) limits for Overpower Delta T Trip Setpoints for Specification 2.2.1.
- 2. Moderator Temperature Coefficient BOL and EOL limits and 300 ppm surveillance limit for Specification 3/4.1.1.3,
- 3. Shutdown Bank Insertion Limit for Specification 3/4.1.3.5,
- 4. Control Bank Insertion Limits for Specification 3/4.1.3.6,
- 5. AXIAL FLUX DIFFERENCE Limits for Specification 3/4.2.1,
- 6. Heat Flux Hot Channel Factor and K(z) for Specification 3/4.2.2, and
- 7. Nuclear Enthalpy Rise Hot Channel Factor for Specification 3/4.2.3.
6.9.1.14.a The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by NRC, specifically those described in the following documents:
The COLR will contain the complete identification for each of the TS referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).
- 1. BAW-10180P-A, "NEMO - Nodal Expansion Method Optimized"
- 2. BAW-10169P-A, "RSG Plant Safety Analysis - B&W Safety Analysis Methodology for Recirculating Steam Generator Plants"
- 3. BAW-10163P-A, "Core Operating Limit Methodology for Westinghouse-Designed PWRs"
- 4. BAW-1 01 68P-A, "RSG LOCA - B&W Loss of Coolant Accident Evaluation Model for Recirculating Steam Generator Plants" SEQUOYAH - UNIT 2 6-13 Amendment No. 44, 50, 64, 66, 107, 134, 142, 146, 161,206, 214,223, 272, 289, 303
ADMINISTRATIVE CONTROLS CORE OPERATING LIMITS REPORT (continued)
- 5. WCAP-10p54-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code"
- 6. WCAP-1 0266-P-A, "The 1981 Revision of Westinghouse Evaluation Model Using BASH CODE"
- 7. BAW-10227P-A, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel"
- 8. BAW-10186-A, "Extended Bumup Evaluation" 6.9.1.14.b The core operating limits shall be determined so that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met.
6.9.1.14.c THE CORE OPERATING LIMITS REPORT shall be provided within 30 days after cycle start-up (Mode 2) for each reload cycle or within 30 days of issuance of any midcycle revision of the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.
REACTOR COOLANT SYSTEM (RCS) PRESSURE AND TEMPERATURE LIMITS (PTLR) REPORT 6.9.1.15 RCS pressure and temperature limits for heatup, cooldown, low temperature operation, criticality, and hydrostatic testing, LTOP arming, and PORV lift settings as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:
Specification 3.4.9.1, "RCS Pressure and Temperature (PIT) Limits" Specification 3.4.12, "Low Temperature Over Pressure Protection (LTOP) System" 6.9.1.15.a The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. Westinghouse Topical Report WCAP-14040-NP-A, "Methodology used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves."
- 2. Westinghouse Topical Report WCAP-1 5321, "Sequoyah Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and PTLR Support Documentation."
- 3. Westinghouse Topical Report WCAP-1 5984, "Reactor Vessel Closure HeadNessel Flange Requirements Evaluation for Sequoyah Units I and 2."
6.9.1.15.b The PTLR shall be provided to the NRC within 30 days of issuance of any revision or supplement thereto.
SPECIAL REPORTS 6.9.2.1 Special reports shall be submitted within the time period specified for each report, in accordance with 10 CFR 50.4.
6.9.2.2 This specification has been deleted.
SEQUOYAH - UNIT 2 6-14 Amendment Nos. 44, 50, 64, 66, 107, 134, 146, 206, 214, 231,249, 284, 303