Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML070110370 | 29 December 2006 | Change of Maintenance-Modification Contractor | High Radiation Area |
RA06-095, Daniel J. Enright Ltr. Re; Change of Maintenance-Modification Contractor | 29 December 2006 | Daniel J. Enright Ltr. Re; Change of Maintenance-Modification Contractor | High Radiation Area |
ML063350042 | 20 December 2006 | Quad and Timi - Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
ML063560027 | 19 December 2006 | Technical Specifications, Issuance of Amendments Technical Specification Task Force Standard Technical Specification Change Traveler 360, Revision 1, DC Electric Rewrite | Shutdown Margin Ultimate heat sink |
ML063200205 | 19 December 2006 | Issuance of Amendments Technical Specification Task Force Standard Technical Specification Change Traveler 360, Revision 1, DC Eclectic Rewrite (TAC Nos. MD5771 & MD5772) | Anticipated operational occurrence |
RS-06-176, Site-Specific Decommissioning Cost Estimates | 18 December 2006 | Site-Specific Decommissioning Cost Estimates | Boric Acid Scaffolding |
ML063560341 | 18 December 2006 | Ltr. 12/18/06 LaSalle Request for Information | Nondestructive Examination VT-2 |
TAC:MD3928 | 18 December 2006 | ||
RS-06-181, Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | 15 December 2006 | Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | |
IR 05000373/2006011 | 15 December 2006 | IR 05000373/2006011(DRS); 05000374/2006011(DRS); 11/13/2006 - 11/17/2006; LaSalle County Station; Emergency Preparedness Specialist Report | |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
ML063540160 | 13 December 2006 | Intervenor-Respondent's Application for Costs - No. CLI-05-29, Environmental Law and Policy Center - 12/13/2006 | |
RS-06-179, Cover Letter for Additional Information - Application to Use Weighting Factors for External Exposure | 13 December 2006 | Cover Letter for Additional Information - Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
ML063460131 | 7 December 2006 | Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier | Deep Dose Equivalent Fuel cladding |
TAC:MD0951 | 5 December 2006 | ||
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
ML063470533 | 1 December 2006 | Withdrawal of Notice of Disbursement from Decommissioning Trusts Letter | |
TAC:MC7793 | 1 December 2006 | ||
ML063330535 | 1 December 2006 | TMI - Closeout of NRC Bulletin 2005-02 | |
ML070360607 | 30 November 2006 | Facility Post Examination Comments for the LaSalle Initial Examination - November 2006 | Anticipated operational occurrence |
ML070230529 | 30 November 2006 | Final Written Exam for the LaSalle Initial Examination - November 2006 | Safe Shutdown Fitness for Duty Reactor Vessel Water Level Loop seal |
ML071720164 | 30 November 2006 | Final Examiner Forms for the LaSalle 2006 Initial Examination | High Radiation Area |
RS-06-169, Additional Information Supporting 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability. | 29 November 2006 | Additional Information Supporting 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability. | |
TAC:MB9816 | 29 November 2006 | ||
ML062920419 | 28 November 2006 | Summary of Sept.19, 2006 pre-application Meeting with Exelon with Respect to RAI Regarding License Amendment Request for Ganged Rod Withdrawal | Cyber Security |
ML063190191 | 20 November 2006 | Fleet Branch Chief Reassignment Letter - Byron, Braidwood, Clinton, Dresden, LaSalle and Quad Cities | |
RS-06-154, Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program. | 17 November 2006 | Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program. | Incorporated by reference Offsite Circuit |
ML063210338 | 15 November 2006 | Quality Assurance Program Changes Regarding the Reassignment of Independent Review | |
ML063340560 | 15 November 2006 | 06 LaSalle Re Operator Licensing Examination Approval | |
ML070230496 | 13 November 2006 | Final As-Administered in Plant Jpms for the LaSalle Initial Examination - November 2006 | Job Performance Measure |
ML070230347 | 13 November 2006 | Proposed Scenarios for the LaSalle Initial Examination - November 2006 | |
ML070230512 | 13 November 2006 | Final As-Administered Scenarios for the LaSalle Initial Examination - November 2006 | |
ML070230472 | 13 November 2006 | Final As-Administered Control Room Jpms for the LaSalle Initial Examination - November 2006 | Job Performance Measure Power change |
ML070230363 | 13 November 2006 | Proposed Written Exam for the LaSalle Initial Examination - November 2006 | Safe Shutdown Fitness for Duty Reactor Vessel Water Level Loop seal High Radiation Area Temporary Modification |
ML070360618 | 13 November 2006 | Various Checklists for the LaSalle Initial Examination - November 2006 | Temporary Modification Job Performance Measure |
ML070360628 | 13 November 2006 | Examination Outline Submittal for the LaSalle Initial Examination - November 2006 | |
ML070360643 | 13 November 2006 | Facility Comments to the Proposed Written Examination ES-401-9 for the LaSalle Initial Examination - November 2006 | |
ML070230329 | 13 November 2006 | Proposed in Plant Jpms for the LaSalle Initial Examination - November 2006 | Loop seal Job Performance Measure |
ML070230322 | 13 November 2006 | Proposed Control Room Jpms for the LaSalle Initial Examination - November 2006 | Job Performance Measure |
ML070230282 | 13 November 2006 | Proposed Administrative Jpms for the LaSalle Initial Examination - November 2006 | Job Performance Measure |
ML063240437 | 13 November 2006 | Byron Station, Dresden, LaSalle County Station, Peach Bottom Atomic Station, Limerick Station and Quad Cities Nuclear Power Station, 2006 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML062760617 | 3 November 2006 | Denial of License Amendment Request | Ultimate heat sink |
ML062990159 | 2 November 2006 | Oyster, Peach Bottom, Quad Cities, TMI - RAI Emergency Action Levels | Ultimate heat sink |
TAC:MD8621 | 31 October 2006 | ||
IR 05000373/2006007 | 26 October 2006 | IR 05000373-06-007; IR 05000374-06-007(DRS); 01/30/2006 - 02/02/2006; Exelon Nuclear Corporate; 09/18/2006 - 09/22/2006; LaSalle County Station, Units 1 and 2 - Cover Letter | |
IR 05000373/2006005 | 24 October 2006 | IR 05000373-06-005; 05000374-06-005 and IR 05000373-06-014; IR 05000374-06-014; 07/01/2006 - 09/30/2006; LaSalle County Station; Units 1 & 2; Fire Protection, Maintenance Effectiveness, and Identification and Resolution of Problems Report | High Radiation Area Ultimate heat sink Internal Flooding Hydrostatic Probabilistic Risk Assessment Temporary Modification Condition Adverse to Quality Significance Determination Process Operability Determination Substantial potential for an overexposure Power change Overexposure |
RS-06-141, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | 18 October 2006 | Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | Ultimate heat sink Stroke time Incorporated by reference Battery sizing Power Operated Valves Offsite Circuit |
RA06-063, Proposed Third Ten-Year Interval Inservice Testing Program | 16 October 2006 | Proposed Third Ten-Year Interval Inservice Testing Program | |
RS-06-149, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power | 12 October 2006 | Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power | |
ML062760008 | 30 September 2006 | to Hydrogeologic Investigation Report, Fleetwide Assessment, LaSalle Generating Station. | Grab sample Annual Radiological Environmental Operating Report Accidental discharge Tritium |