LASALLE COUNTY STATION Admin JPM a.

LaSALLE NRC EXAM 2006-301 Job Performance Measure Admin a.

Candidate Name:

Page 1 of 5

LASALLE COUNTY STATION Admin JPM a.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Determine Tags for OOS Job Performance Measure No: Admin a K/A

Reference:

2.1.24 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom W Simulator W Plant W Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

The Unit 1 is in Mode 4.

Maintenance has requested the Division 2 W ater leg pump be taken Out Of Service to replace the pump.

RHR B and RHR C were previously taken OOS.

The plant computer for tagging is out of service.

INITIATING CUE:

The Unit Supervisor directs you to independently verify the mechanical and electrical outage requirements for the Out of Service.

Inform the Unit Supervisor of the components needed to be controlled and their controlled positions.

Task Standard: Correctly identify all valves and breakers that must be tagged and their positions.

Time Critical Task: Yes/No Validation Time: ___________

2 of 5

LASALLE COUNTY STATION Admin JPM a.

SIMULATOR SETUP INSTRUCTIONS Any rated power IC can be used for this JPM Materials:

The following materials are required to be available to the examinee:

11X17 1E-1-4220AW P& ID M-96-3 P& ID M-96-4 The following materials are required to be provided to examinee:

None 3 of 5

LASALLE COUNTY STATION Admin JPM a.

JPM Start Time:

CUE: Provide a copy of the OOS request.

1. Performance step:

Standard: Examinee locates and refers to the following drawings:

M-96-3 M-96-4 11X17 1E-1-4220AW Comment:

2. U Performance step:

Standard: Determine isolation points for Division 2 W ater leg Pump.

Examinee determines the following valves must be taken OOS in the closed position:

1E12-F380 - min flow valve - closed 1E12-F085C - water leg discharge to 1C RHR - closed 1E12-F085B - water leg discharge to 1B RHR - closed 1E12-F082 - water leg suction - closed Comment:

3. U Performance step:

Standard: Determine electrical isolation points for Division 2 W ater leg Pump.

Examinee determines the following breakers/fuses must be taken OOS in the tripped/pulled position:

MCC 136Y-1 E1 (breaker open)

Comment:

4 of 5

LASALLE COUNTY STATION Admin JPM a.

4. Performance step:

Standard: Examinee informs Unit Supervisor of valves and breakers identified and positions required.

Comment:

Terminating Cue: Unit Supervisor, acknowledge information.

This JPM is complete.

JPM Stop Time: _________

5 of 5

LASALLE COUNTY STATION Admin JPM b.

LaSALLE NRC EXAM 2006-301 Job Performance Measure Admin b.

Candidate Name:

1 of 7

LASALLE COUNTY STATION Admin JPM b.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Interpret Core Thermal Limits Job Performance Measure No: Admin b K/A

Reference:

2.1.25 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

Unit 1 is at rated conditions and stable.

INITIATING CUE:

Using the plant computer, print out the current core performance calculations.

Review the results and inform the Unit Supervisor of acceptability.

Task Standard: Correctly identify all out of specification items on the current core performance calculations.

Time Critical Task: Yes/No Validation Time: ___________

2 of 7

LASALLE COUNTY STATION Admin JPM b.

SIMULATOR SETUP INSTRUCTIONS Any rated power IC can be used for this JPM.

In Actions Lists, for Powerplex, select R3306 PPLXFLCPR MALF 33-06 value to 1.4.

Materials:

The following materials are required to be provided to examinee:

One copy of CMSS Core Performance Log printout when directed by CUE.

The printout should have MFLPD value greater than 1 (outside thermal limits)

The following material may be located and utilized by the examinee:

LOP-CX-01, Core Power Distribution Calculation (OD20)

LOS-AA-S101, Unit 1 Shiftly Surveillance U-1 Technical Specifications 3 of 7

LASALLE COUNTY STATION Admin JPM b.

JPM Start Time:

Note:

The examinee may obtain LOP-CX-01 to perform the next step.

1. U Performance step:

Standard: Demands core performance calculations.

Examinee:

Select Operator Demandable from the PPC Main Menu.

Select OD Function from the Operator Demandable menu.

Select OD 20 from the PowerPlex OD Functions display.

CHECK that the OD 20 data has printed on the PowerPlex printer.

Comment: After examinee has completed step 1, give him/her the preprinted core performance printout.

2. U Performance step:

Standard: (The examinee may obtain LOS-AA-S101 to perform this step).

Reviews the Core Performance data.

Examinee reviews data and determines MFLPD has a value greater than 1 (outside thermal limits).

Comment:

3. Performance step:

Standard: Inform Unit Supervisor MFLPD has been exceeded.

Examinee recommends entry into applicable technical specification.

Comment:

Terminating Cue As Unit Supervisor, acknowledge information.

4 of 7

LASALLE COUNTY STATION Admin JPM b.

This JPM is complete.

5 of 7

LASALLE COUNTY STATION Admin JPM b.

LaSalle-1 WK-0415 04APR07-07.55.12 1373 MWD/MTU TRIGR=2HR REV=UFEB03 CORE PERFORMANCE LOG --- LONG EDIT CALCULATION TYPE: MON CALCULATION -

RESTART FILE: RST-04APR07-074912 THERMAL LIMIT SET: Set01 OPTION B DLO Base Limits CTP CALCULATION  : HEAT BALANCE SYMMETRY : FULL STATE CONDITIONS FLOW RATES / CORE PARAMETERS NUCLEAR LIMITS LOCATION GMWE 1195.24 WT 97.6 (90.0%) MLB/HR MPF 2.969 45-40-04 GMWT 3487.8(100.0%) WTSUB 98.46 MLB/HR MCPR 1.638 45-40 EFF 34.27 % WTFLAG 2 MFLCPR 0.873 45-40 PR 1018.0 PSIA WFW 15.00 MLB/HR MAPRAT 0.737 47-40-04 DHS 20.88 BTU/LB TFW 421.83 DEG. F MFDLRX 0.768 47-40-04 KEFF 1.0028 WD 30.77 MLB/HR MFLPD 1.002 45-40-04 CRD 0.0721 CRD FLOW 0.033 MLB/HR MAX(P-PCS) 0.03 41-32-04 AVG POW DEN 51.59 KW/L FCL 107.2%

AVG VOID FRAC 0.4788 PRESS DROP (MEAS) 17.35 PSIA XE (EQ) -0.04%

PRESS DROP (CALC) 20.76 PSIA XE(NONEQ) -0.08%

CYCLE EXPOSURE 1373.5 MWD/MTU CAVEX 16204. MWD/MTU LOCATION 1 2 3 4 5 6 7 8 RING REL POWER 0.91 1.31 1.29 1.24 1.22 1.18 0.93 0.52

                              • NUCLEAR LIMITS ***************** *AXIAL REL POWER*

FLCPR LOC APRAT LOC FDLRX LOC NODE NOTCH REL-POW


----- ----- -------- ----- -------- 25 0.873 45-40 0.737 47-40-04 0.768 47-40-04 24 00 0.059 0.873 19-18 0.735 43-40-04 0.755 37-30-04 23 02 0.173 0.871 17-20 0.730 23-32-04 0.753 37-34-04 22 04 0.343 0.868 39-32 0.727 45-42-04 0.752 43-40-04 21 06 0.484 0.867 31-22 0.726 41-46-04 0.752 45-38-04 20 08 0.628 19 10 0.757 FLPD LOC TPF LOC 18 12 0.860


-------- ----- -------- 17 14 0.932 1.002 45-40-04 2.969 45-40-04 16 16 0.984 0.831 39-16-04 2.900 39-16-04 15 18 1.035 0.831 25-32-04 2.897 25-32-04 14 20 1.088 0.830 43-38-04 2.894 43-38-04 13 22 1.205 0.830 39-32-04 2.893 39-32-04 12 24 1.273 11 26 1.328

                      • MLHGR BY FUEL TYPE ********** 10 28 1.367 TYPE LHGR LOCATION TYPE LHGR LOCATION 9 30 1.386 6 3.86 07-12-12 31 10.00 37-40-05 8 32 1.375 7 3.90 29-60-10 32 9.01 13-32-05 7 34 1.381 8 5.29 49-52-10 33 7.64 37-54-06 6 36 1.403 9 5.78 09-48-11 34 11.11 39-32-04 5 38 1.435 10 9.50 47-40-04 35 11.41 45-40-04 4 40 1.459 11 8.94 35-14-04 36 8.41 05-30-05 3 42 1.443 12 11.13 25-32-04 37 10.77 35-34-04 2 44 1.323 13 8.80 07-26-05 38 11.03 17-20-04 1 48 1.016 23 10.12 31-30-05 39 10.00 35-12-04 24 10.61 47-46-04 40 10.66 41-36-04 APRM CALIBRATION A B C D E F APRM READINGS 99.7% 99.5% 99.0% 99.2% 98.9% 98.8%

APRM GAFS 1.003 1.005 1.010 1.008 1.011 1.012 6 of 7

LASALLE COUNTY STATION Admin JPM b.

LaSalle-1 WK-0415 04APR07-07.55.12 1373 MWD/MTU TRIGR=2HR REV=UFEB03

02 06 10 14 18 22 26 30 34 38 42 46 50 54 58 59 -- -- -- -- -- -- -- 59 55 -- -- 16 -- -- -- 16 -- -- 55 DISPLAY KEY 51 -- -- -- -- -- -- -- -- -- -- -- 51 R = MFLCPR 47 -- -- -- -- -- -- 00 -- -- -- -- -- -- 47 M = MAPRAT 43 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 43 X = FDLRX 39 -- 16 -- -- -- 12 -- -- -- 12 -- *--* -- 16 -- 39 C = FDLRC 35 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 35 P = PRECOND 31 -- -- -- 00 -- -- -- 00 -- -- P-- 00 -- -- -- 31 D = MFLPD 27 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 27 * = MULTPL.

23 -- 16 -- -- -- 12 -- -- -- 12 -- -- -- 16 -- 23 19 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 19 15 -- -- -- -- -- -- 00 -- -- -- -- -- -- 15 11 -- -- -- -- -- -- -- -- -- -- -- 11 07 -- -- 16 -- -- -- 16 -- -- 07 03 -- -- -- -- -- -- -- 03 02 06 10 14 18 22 26 30 34 38 42 46 50 54 58 CONTROL RODS SYMMETRIC, C.R. SEQUENCE:A-2, C.R. DENSITY: 0.072 SUBST. RODS:

                    • CALIBRATED LPRM READINGS ************ *LPRM FAILED SENSORS*

57 15.5 20.4 20.0 20.9 LOCATION STATUS 29.2 37.7 37.9 36.1 -------- ------

30.1 46.4 49.0 39.9 40-49-C MAN 21.8 42.1 44.1 33.7 40-49-A DNSC 56-25-B DNSC 49 19.3 20.5 22.5 20.8 21.7 21.3 48-17-C DNSC 31.8 45.4 48.5 43.7 46.0 40.1 40-09-A DNSC 36.0 62.5 64.9 60.3 65.1 54.8 29.2 68.7 68.3 63.7 69.0 59.8 41 19.7 24.3 27.8 28.7 26.9 25.6 24.8 38.3 49.9 47.6 51.7 46.1 50.4 36.6 48.2 68.4 63.8 69.9 64.2 66.9 39.9 47.5 75.1 64.9 73.9 70.2 72.6 33.3 33 19.6 21.3 25.7 29.2 25.3 19.7 20.0 42.5 45.3 49.6 49.9 49.8 43.7 38.4 58.6 62.0 67.8 69.2 69.6 59.2 48.6 65.3 65.1 79.9 78.2 81.9 62.8 43.5 25 19.0 24.0 28.1 29.1 29.6 24.5 21.2 39.8 50.4 47.9 52.3 49.0 49.8 38.1 50.5 68.1 63.7 68.6 64.4 65.5 44.3 51.3 74.4 67.2 73.8 63.6 65.4 40.5 17 20.3 24.0 25.8 21.7 23.6 23.3 17.6 *OTHER FAILED SENSORS*

39.5 50.4 51.7 45.9 49.4 46.3 30.0 SENSOR STATUS 51.0 68.8 69.6 63.0 69.0 62.7 30.8 ------ ------

47.5 78.8 73.7 66.5 79.4 64.8 23.3 09 18.9 21.2 22.0 21.9 19.7 38.9 40.5 44.3 39.8 33.9 51.5 52.1 59.5 51.1 41.2 52.2 48.7 60.6 50.2 35.9 08 16 24 32 40 48 56 7 of 7

LASALLE COUNTY STATION Admin JPM c.

LaSALLE NRC EXAM 2006-301 Job Performance Measure Admin c.

Candidate Name:

Page 1 of 5

LASALLE COUNTY STATION Admin JPM c.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Execute LOA GRID-001 (U1) Job Performance Measure No: Admin c K/A

Reference:

295003 AA1.01 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant W Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO in the Control Room.

Unit 1 is at rated conditions.

Unit 2 has scrammed 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> ago.

It is a cool spring day.

Due to unusual number of generating stations offline, the Grid is red and LOP-AP-43, Emergency Load Conservation, has been completed.

No surveillances are in progress due to Grid conditions.

The C VP Chiller is secured. 1A and 1B Service W ater Pumps are running and 3 CW pumps are running.

The Load Dispatcher has just informed you that Predicted Switchyard Voltage with the loss of Unit 1 at LaSalle is 350.5 KV.

INITIATING CUE The Unit Supervisor has assigned you to perform LOA-GRID-001 for Unit 1. Notify US when Attachment A of LOA-GRID-001 is complete.

Task Standard: Correctly complete LOA-GRID-001 and determine Off-Site power is OPERABLE.

Time Critical Task: Yes/No Validation Time: ___________

2 of 5

LASALLE COUNTY STATION Admin JPM c.

SIMULATOR SETUP Reset Simulator to IC 130 or other power IC that will support LOA-GRID-001.

Ensure C VT Supply and exhaust are running. A shutdown.

Ensure C VR Supply and exhaust are running, A shutdown.

Materials:

The following materials are required to be available to the examinee:

LOA GRID-001 The following materials are required to be provided to examinee:

None 3 of 5

LASALLE COUNTY STATION Admin JPM c.

JPM Start Time:

1. Performance step:

Standard: START a Special Log per LAP-200-5, Conduct of Operations - Special Logs, and Attachment C to MONITOR predicted and minimum switchyard voltages.

Comment: Applicant should start Special Log (Attachment C). Examinee writes Predicted and Minimum Switchyard voltage on Attachment C. Values are 350.5 KV and 353 KV.

2. Performance step:

Standard: As directed by Transmission Operations, raise VARS to increase switchyard voltage.

Comment: Raising VARS will not increase switchyard voltage (CUE IF NECESSARY).

3. Performance step:

Standard: Verify LOP-AP-43, Emergency Load Conservation measures are in place.

Comment: Per initial conditions, LOP-AP-43 actions are being executed.

4. Performance step:

Standard: Checks predicted switchyard voltage greater than minimum allowed voltage for current plant configuration by executing Attachment A Tables 1, 2, & 3.

Comment: (Attachment B tables are for Unit 2.) Applicant should obtain and execute Attachment A Tables 1, 2, & 3.

5. U Performance step:

Standard: Examinee completes Unit 1 Table 1. Notes the Minimum Allowable Switchyard Voltage. - 351.7kV Comment: Observe the completion of Table 1 for accuracy.

4 of 5

LASALLE COUNTY STATION Admin JPM c.

6. U Performance step:

Standard: Applicant completes Unit 1 Table 3. Applicant recognizes:

Three circ water pumps running - no credit.

Station Air Compressor running is U0 Air Compressor - 0.4kV allowed adjustment.

Two service water pumps running - no credit.

Three heater drain pumps running - no credit.

C VP Chiller not running (from initial conditions) - 0.4kV decrease in Minimum Allowable Switchyard Voltage.

Comment:

7. U Performance step:

Standard: Applicant determines 0.8 may be subtracted from minimum Allowable Switchyard voltage found in Table 2. Minimum allowable switchyard voltage then becomes 349.9 which is below the value provided in the initial conditions (350.5 kV)

Comment:

8. U Performance step:

Standard: Applicant determines that Offsite Power is OPERABLE.

Comment: Informs Unit Supervisor Offsite Power is OPERABLE JPM Stop Time: _______________

5 of 5

LASALLE COUNTY STATION Admin JPM d.

LaSALLE NRC EXAM 2006-301 Job Performance Measure Admin d.

Candidate Name:

LASALLE COUNTY STATION Admin JPM d.

Job Performance Measure Cover Sheet Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Authorize an Emergency Dose Job Performance Measure No: Admin d.

for a Life Saving Operation K/A

Reference:

2.3.4 Method of testing:

Simulated Performance Actual Performance W Classroom W Simulator W Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: A General Emergency has been declared. Fuel failure has occurred together with a failure of the RCS. Containment is currently being challenged. The TSC has not been activated, but the appropriate EAL has been declared. An emergency life saving operation must be performed. The operation will take between 12 and 15 minutes in a 200 R/hr field with an unknown fission product gas concentration in the room.

The operation requires two people to enter the field. Phred Burphle, SS#

012-34-5678; Harvey Owanowitz, SS# 123-45-6789; and George Bush, SS# 987-65-4321 have volunteered. Phred and Harvey have never received an emergency exposure, but George received a 27 R dose at a reactor in South Africa when he volunteered to assist in a similar life-saving operation. He is familiar with the procedures for rescuing the victim.

Task Standard: The life saving operation is authorized, George is not allowed to receive the emergency dose.

Required Materials: EP-AA-113 General

References:

EP-AA-113 Initiating Cue: As the Shift Emergency Director, perform the actions needed to allow the life-saving operation.

Time Critical Task: Yes/No Validation Time:

LASALLE COUNTY STATION Admin JPM d.

LASALLE COUNTY STATION Admin JPM d.

Performance Information Critical steps denoted with a check mark Performance step:

Standard: Applicant retrieves a copy of EP-AA-113, Personnel Protective Actions.

Comment:

Performance step:

Standard: Applicant determines need for emergency action.

Comment: Emergency action is needed per initiating cue.

U Performance step:

Standard: Determines emergency exposure limits in excess of 5 rem TEDE (EPA-400 lower limits) are required for Exelon emergency workers.

Comment: Rad workers will receive approximately 40 - 50 REM performing the rescue operation.

Performance step:

Standard: Determines emergency exposure is not less than 5 REM TEDE. Step 4.3.1.3 is marked N/A.

Comment: Step is marked N/A U Performance step:

Standard: Determines exposure will be above 5 REM, completes an Authorization for Emergency Exposure (EP-AA-113-F-02) for Phred and Harvey. Applicant must exclude George for his previous exposure.

Comment: EP-AA-113-F-02 is completed for Phred and Harvey.

LASALLE COUNTY STATION Admin JPM d.

U Performance step:

Standard: Informs workers before the fact of possible health effects at the anticipated exposure level using Attachment 1, Emergency Worker Exposure Limits and Associated Risks.

Comment: Applicant provides brief per Attachment 1.

U Performance step:

Standard: Applicant obtains emergency workers acknowledgment that they have volunteered and understand the associated risks. (In writing on Authorization for Emergency Exposure Form or verbally for teams in the fiels.)

Comment: Sign for the two authorized workers.

U Performance step:

Standard: Applicant signs the Authorization for Emergency Exposure Form as Shift Emergency Director.

Comment: Applicant completes authorization of Emergency Exposure.

U Performance step:

Standard: Applicant recognizes per the initiating cue that authorization to take KI must also be completed prior to the emergency workers entering the space with an unknown concentration of fission product gasses.

Comment: Proceed to Admin JPM e., Authorization to Take KI.

Terminating cue: Cue the applicant that this JPM is complete.

LASALLE COUNTY STATION Admin JPM e.

LaSALLE NRC EXAM 2006-301 Job Performance Measure Admin e.

Candidate Name:

LASALLE COUNTY STATION Admin JPM e.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Authorize Use of KI Job Performance Measure No: Admin e K/A

Reference:

2.4.40 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom W Simulator W Plant W Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: See the initial conditions from Admin JPM d.

Task Standard: Correctly completed EP-AA-113-F-03 Initiating Cue: Execute Step 2.5 of EP-AA-112-100-F-01.

Time Critical Task: Yes/No Validation Time:

2 of 5

LASALLE COUNTY STATION Admin JPM e.

Materials:

The following materials are required to be available to examinee:

EP-AA-112-100-F-01, Shift Emergency Director Checklist EP-AA-113, EP-AA-113-F-03 The following material is required to be provided to examinee:

None 3 of 5

LASALLE COUNTY STATION Admin JPM e.

Performance Information Critical steps denoted with a check mark The applicant should have a copy of EP-AA-112-100-F-01, Shift Emergency Director Checklist from completion of Admin JPM d.

Performance step:

Standard: Reviews provided procedure, retrieves procedure: EP-AA-113, Personnel Protective Actions. Goes to Section 4.4, KI Assessment.

Comment:

U Performance step:

Standard: Determines from step 4.4.1.A there is or has been a potential loss of fuel clad.

(Based on initial cue of General Emergency.) Determines from step 4.4.1.B that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. (Based on initial cue.) Determines KI must be issued.

Comment:

U Performance step:

Standard: Documents the decision to issue KI using Thyroid Blocking Agent Authorization Form (EP-AA-113-F-03). Both individuals entering the space must be listed with correct social security numbers.

Comment: Phred Burphle, SS# 012-34-5678; Harvey Owanowitz, SS# 123-45-6789.

George Bush, SS# 987-65-4321 should not be allowed entry.

______ Performance step:

Standard: Notifies Occupational Health (Medical) Services Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.

4 of 5

LASALLE COUNTY STATION Admin JPM e.

Comment:

Terminating cue: JPM is complete when applicant notifies OHS of KI use.

5 of 5