ML070230322

From kanterella
Jump to navigation Jump to search
Proposed Control Room Jpms for the LaSalle Initial Examination - November 2006
ML070230322
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/13/2006
From:
NRC/RGN-III/DRS/OLB
To:
References
50-373/06-301, 50-374/06-301
Download: ML070230322 (49)


Text

LASALLE COUNTY STATION JPM a.

LaSALLE NRC EXAM 2006-301 Job Performance Measure a.

Candidate Name:

Page 1 of 6

LASALLE COUNTY STATION JPM a.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Respond to Loss of RPIS Displays Job Performance Measure No: C.R. a K/A

Reference:

214000K303 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

The plant is at 100% power, NOP/NOT. No equipment is out of service. It was discovered that Control Rod 22-19 is out of service due to a rupture in its accumulator.

The control rod was being inserted from the full out position when an RPIS INOP alarm was received. The last observed position for the control rod was notch 24.

INITIATING CUE:

Complete insertion of control rod 22-19 per LOA-RM-101, Unit 1 RMCS Abnormal Situations.

Task Standard: Correctly insert control rod 22-19 per LOA-RM-101. CRD drive pressure must be raised 50 psid to allow the control rod to be inserted.

Time Critical Task: Yes/No 2 of 6

LASALLE COUNTY STATION JPM a.

CAUTION Prior to notching control rods to verify position displays, a Qualified Nuclear Engineer shall be consulted for guidance. In order to verify control rod position, a rod shall initially be inserted only one notch from its assumed position (or withdrawn one notch if assumed to be at position 00). If there is a need to notch further, consult a QNE for additional guidance.

JPM Start Time:

1. Performance step: COMPLETE Attachment B and Forward a copy to IMD for Troubleshooting.

Standard: Dispatches operator to AEER to complete Attachment B CUE: None NOTE: The following step is a conditional step with no required action at this time.

2. Performance step: ENSURE compliance with Tech Spec 3.1.3 while continuing below. If a rod must be fully inserted, PERFORM Att. C.

Standard: Reviews or request US review Tech Spec 3.1.3 for applicability.

Cue: None

3. Y Performance step: Fill out Attachment C check list as follows:

LIST the control rod, to be inserted, in the order of insertion.

RECORD the current position of the applicable control rod.

RECORD the insert time, for the applicable control rod from the current LOS-RD-SR5.

RECORD the insert stall flow, for the applicable control rod from the current LOS-RD-M2 (Attachment A).

Standard: Enters required data.

Cue: When requested provide copies of current LOS-RD-SR5 and LOS-RD-M2 (Attachment A) 3 of 6

LASALLE COUNTY STATION JPM a.

Comment:

4. Performance step: Review and print PPC LPRM Status Display for LPRM power readings before inserting any control rod(s).

Standard: Prints LPRM Status Display.

Cue: None Comment: None

5. Performance step: Notify IMD to be prepared to manually read the RPIS probe after the rod is inserted.

Standard: Notifies IMD Cue: IMD technicians are on station.

Comment: None

6. Performance step: Ensure the LPRM Status Display is entered into one of the Control Room Screens.

Standard: LPRM Status Display is appears on one of the Control Room screens.

Cue: None Comment: None

7. Performance step: INSERT control rod while timing and observing the following:

Expected LPRM power decay.

Expected DECREASE in Reactor Power.

Standard: Depresses CONTINUOUS INSERT (emergency) push-button. Observes power indications. Times rod motion.

Cue: None Comment: None 4 of 6

LASALLE COUNTY STATION JPM a.

8. Y Performance step: Control rod full in should be indicated by:

Stall Flow is observed IMD verification of full in reed switch actuation Control rod insertion time is approximately equal to the previous LOS-RD-SR5 value from the time the insert PB was initially depressed, Standard: Stall flow is observed.

Cue: IF requested, as IMD technician report Full-In reed switch is closed.

Comment: Applicant should also observed that insertion time is approximately equal to previous data. - This in NOT critical.

9. Performance step: If some of the elements above are not observed within the current LOS-RD-SR5 time frame, CONTINUE to attempt insert for up to 90 seconds.

RELEASE the Control Rod Insert Push Button(s).

Standard: All elements are observed and Control Rod Insert Push-button is released.

Cue: None Comment: None

10. Performance step: If the control rod was inserted for the full 90 seconds and still did not pick up the full in reed switch, ELEVATE CRD pressure per LOA-RD-101 for Stuck Control Rod and re-attempt movement from step 3.

If the reed switch resistance readings are inconclusive, EVALUATE the other data to determine whether or not the rod is fully inserted.

VALIDATE the conclusions with the QNE.

Standard: Discusses conclusions with QNE.

Cue: The rod is fully inserted.

Comment: None 5 of 6

LASALLE COUNTY STATION JPM a.

11. Performance step: If all of the elements in step 6 were observed within the approximate rod travel time indicated by LOS-RD-SR5, or based on all data observed and with QNE consultation the CRS determines that the control rod is full in, CHECK that the control rod is full in on the checklist and LOG time.

Standard: Completes data entry.

Cue: None Comment: None

12. Performance step: If additional control rods are required to be inserted, select the next rod and continue at step 3.

After all rods have been inserted, REVIEW and PRINT PPC LPRM Status Display power readings.

ATTACH both PPC LPRM Status Display prints to this Attachment.

Standard: No additional rods to be inserted. Attaches LPRM Status Display printout to attachment.

Cue: JPM is Complete.

Comment: None JPM End Time: ____________

6 of 6

LASALLE COUNTY STATION JPM b.

LaSALLE NRC EXAM 2006-301 Job Performance Measure b.

Candidate Name:

Page 1 of 5

LASALLE COUNTY STATION JPM b.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Initiate HPCS with a Failure of the Manual Initiation Push-Button K/A

Reference:

295031 EA1.04 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

A loss of all feedwater has resulted in a scram of the unit.

The LGAs have been entered.

Reactor water level is slightly above -50".

RCIC is OOS for mechanical maintenance.

Grid voltage has been oscillating.

An operator is standing by to assist you.

INITIATING CUE:

The Unit Supervisor directs you to manually initiate HPCS using the pushbutton.

Notify the Unit Supervisor when HPCS is injecting.

Task Standard: Correctly determine the pushbutton start of HPCS has failed.

Manually align valves and start the HPCS pump. Establish flow to the RPV.

Time Critical Task: Yes/No Page 2 of 5

LASALLE COUNTY STATION JPM b.

Note: All steps of this JPM are to be completed at control room panel 1H13-P601 unless otherwise noted.

JPM Start Time:

1. Performance step: Arm manual initiation logic.

Standard: Examinee turns HPCS MANUAL INITIATION pushbutton to ARM.

Cue: None Comment: None

2. Performance step: Initiates HPCS.

Standard: Examinee depresses HPCS MANUAL INITIATION pushbutton Cue: None Comment: None

3. Y Performance step: Recognizes failure to initiate and reports to SRO.

Standard: Examinee recognizes failure to initiate and reports to US.

Cue: As US, acknowledge report.

Comment: If candidate asks for guidance, inform them to continue until HPCS is injecting

4. Y Performance step: Manually start HPCS pump.

Standard: Examinee turns HPCS PMP control switch to START Cue: None Comment: None Page 3 of 5

LASALLE COUNTY STATION JPM b.

5. Performance step: VERIFY HPCS pump start.

Standard: Examinee verifies pump start by observation of pump amp meter and discharge pressure.

Cue: None Comment: If examinee immediately opens the injection valve after starting the HPCS pump, 1E22-F012 may not open.

6. Performance step: VERIFY 1E22-F012, HPCS MIN FLOW VLV opens.

Standard: Examinee verifies1E22-F012, HPCS MIN FLOW VLV opens.

Cue: None Comment: None

7. Y Performance step: Open 1E22-F004 HPCS INJECTION VLV Standard: Examinee turns 1E22-F004, HPCS INJECTION VLV control switch to OPEN.

Cue: None Comment: None

8. Performance step: Verify HPCS system injection.

Standard: Flow verified using system flow indications and/or reactor water level increasing.

Cue: None Comment: None

9. Performance step: INFORM Unit Supervisor that HPCS is injecting to the reactor.

Standard: Examinee informs the Unit Supervisor that HPCS is injecting to the reactor.

Page 4 of 5

LASALLE COUNTY STATION JPM b.

Cue: AS Unit Supervisor, acknowledge information.

JPM Stop Time:

Page 5 of 5

LASALLE COUNTY STATION JPM c.

LaSALLE NRC EXAM 2006-301 Job Performance Measure c.

Candidate Name:

Page 1 of 11

LASALLE COUNTY STATION JPM c.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Turbine Bypass Valve Surveillance IAW LOS-TG-M4 K/A

Reference:

241000. A1.07 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

1. Unit 1 is at 100% power.
2. LOS-TG-M4, Turbine Bypass Valve Surveillance, is in progress on Unit 1.
3. LOS-TG-M4 has been completed through step E.2.1.

INITIATING CUE:

You to perform LOS-TG-M4, Turbine Bypass Valve Surveillance, on Unit 1 using Attachment 1A of LOS-TG-M4.

Task Standard: Correctly complete LOS-TG-M4, Turbine Bypass Valve Surveillance.

Time Critical Task: Yes/No Page 2 of 11

LASALLE COUNTY STATION JPM c.

JPM Start Time:

Note: If Bypass Valves are controlling Reactor pressure:

Do NOT perform this attachment.

STATE reason this attachment not performed in Comments Section.

MAKE a DEL entry to ensure Bypass Valves are tested to meet Tech Specs. Step is N/A.

TEST 1B21-MSBPV-1 as follows:

1. Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None Comment: None

2. Y Performance step: PLACE the BYPASS VALVE TEST selector switch in position 1.

Standard: BYPASS VALVE TEST selector switch is in position 1.

Cue: None Comment: None

3. Y Performance step: DEPRESS the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-1 to FULL OPEN.

1B21-MSBPV-1 exhibits Fast Open characteristics.

Standard: Verifies the following: 1B21-MSBPV-1 to FULL OPEN.

1B21-MSBPV-1 exhibits Fast Open characteristics.

Cue: None Comment: None Page 3 of 11

LASALLE COUNTY STATION JPM c.

4. Y Performance step: RELEASE the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-1 to FULL CLOSED.

Standard: Verifies 1B21-MSBPV-1 to FULL CLOSED.

Cue: None Comment: None

5. Performance step: If MSBPV did NOT fast open, REVIEW PPC data.

Standard: Step is N/A.

6. Performance step: ALLOW the plant to stabilize for at least 2 minutes before testing the next bypass valve.

Standard: Allows 2 minutes for stabilization.

Cue Two minutes have elapsed.

Comment: Allow applicant to continue to test 1B21-MSBPV-2.

7. Y Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

8. Y Performance step: PLACE the BYPASS VALVE TEST selector switch in position 2.

Standard: BYPASS VALVE TEST selector switch is in position 2.

Cue: None*10.

Comment: None

9. Y Performance step: DEPRESS the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-2 to FULL OPEN.

1B21-MSBPV-2 exhibits Fast Open Page 4 of 11

LASALLE COUNTY STATION JPM c.

characteristics.

Standard: Verifies the following:

1B21-MSBPV-2 to FULL OPEN.

1B21-MSBPV-2 exhibits Fast Open characteristics.

Cue: None Comment: None

10. Y Performance step: RELEASE the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-2 to FULL CLOSED.

Standard: Verifies 1B21-MSBPV-2 to FULL CLOSED.

Cue: None Comment: None

11. Y Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None Comment: None

12. Performance step: If MSBPV did NOT fast open, REVIEW PPC data.

Standard: Step is N/A.

Cue: None Comment: None

13. Performance step: ALLOW the plant to stabilize for at least 2 minutes before testing the next bypass valve.

Standard: Allows 2 minutes for stabilization.

Page 5 of 11

LASALLE COUNTY STATION JPM c.

Cue: Two minutes have elapsed.

Comment: TEST 1B21-MSBPV-3 as follows:

14. Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None Comment: None

15. Y Performance step: PLACE the BYPASS VALVE TEST selector switch in position 3.

Standard: BYPASS VALVE TEST selector switch is in position 3.

Cue: None Comment: None

16. Y Performance step: DEPRESS the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-3 to FULL OPEN.

1B21-MSBPV-3 exhibits Fast Open characteristics.

Standard: Verifies the following:

1B21-MSBPV-3 to FULL OPEN.

1B21-MSBPV-3 exhibits Fast Open characteristics.

Cue: None Comment: None

17. Y Performance step: RELEASE the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-3 to FULL CLOSED.

Standard: Verifies 1B21-MSBPV-3 to FULL CLOSED.

Page 6 of 11

LASALLE COUNTY STATION JPM c.

18. Y Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None Comment: None

19. Performance step: If MSBPV did NOT fast open, REVIEW PPC data.

Standard: Step is N/A.

Cue: None Comment: None

20. Performance step: ALLOW the plant to stabilize for at least 2 minutes before testing the next bypass valve.

Standard: Allows 2 minutes for stabilization.

Cue: None Comment: TEST 1B21-MSBPV-4 as follows:

21. Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None

22. Y Performance step: PLACE the BYPASS VALVE TEST selector switch in position 4.

Standard: BYPASS VALVE TEST selector switch is in position 4.

Cue: None Comment: None Page 7 of 11

LASALLE COUNTY STATION JPM c.

23. Y Performance step: DEPRESS the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-4 to FULL OPEN.

1B21-MSBPV-4 exhibits Fast Open characteristics.

Standard: Verifies the following:

1B21-MSBPV-4 to FULL OPEN.

1B21-MSBPV-4 exhibits Fast Open characteristics.

Cue: None Comment: None

24. Y Performance step: RELEASE the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-4 to FULL CLOSED.

Standard: Verifies 1B21-MSBPV-4 to FULL CLOSED.

Cue: None Comment: None

25. Y Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None Comment: None

26. Performance step: If MSBPV did NOT fast open, REVIEW PPC data.

Standard Step is N/A.

Cue: None Comment: None Page 8 of 11

LASALLE COUNTY STATION JPM c.

27. Performance step: ALLOW the plant to stabilize for at least 2 minutes before testing the next bypass valve.

Standard: Allows 2 minutes for stabilization.

Cue: Two minutes have elapsed.

Comment: TEST 1B21-MSBPV-5 as follows:

28. Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None Comment: None

29. Performance step: PLACE the BYPASS VALVE TEST selector switch in position 5.

Standard: BYPASS VALVE TEST selector switch is in position 5.

Cue: None Comment: None

30. Y Performance step: DEPRESS the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-5 to FULL OPEN.

1B21-MSBPV-5 exhibits Fast Open characteristics.

Standard: Verifies the following:

1B21-MSBPV-5 to FULL OPEN.

1B21-MSBPV-5 exhibits Fast Open characteristics.

Cue: None Comment: None Page 9 of 11

LASALLE COUNTY STATION JPM c.

31. Y Performance step: RELEASE the TEST BYPASS VALVE button and OBSERVE ACCEPTANCE CRITERIA:

1B21-MSBPV-4 to FULL CLOSED.

Standard: Verifies 1B21-MSBPV-4 to FULL CLOSED.

Cue: None Comment: None

32. Performance step: If MSBPV did NOT fast open, REVIEW PPC data.

Standard: Step is N/A.

Cue: None Comment: None

33. Performance step: CHECK the Bypass Valve READY TO SELECT light is energized.

Standard: Bypass Valve READY TO SELECT light is energized.

Cue: None Comment: None

34. Performance step: PLACE the BYPASS VALVE TEST selector switch in OFF.

Standard: BYPASS VALVE TEST selector switch is in OFF.

Cue: None Comment: None

35. Performance step: If fast opening characteristics were NOT confirmed on any Bypass Valve(s) PERFORM the following.

Standard: Step is N/A.

Cue: None Page 10 of 11

LASALLE COUNTY STATION JPM c.

Comment: This JPM is complete when the fast opening characteristics were confirmed on all Bypass Valves.

JPM Stop Time: _______

Page 11 of 11

LASALLE COUNTY STATION JPM d.

LaSALLE NRC EXAM 2006-301 Job Performance Measure d.

Candidate Name:

Page 1 of 10

LASALLE COUNTY STATION JPM d.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Upshift the "A" and "B" Reactor Recirc Pumps K/A

Reference:

202001.A4.01 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

1. Unit 1 is starting up following an extended outage and the reactor is at 29%

power.

2. LGP 1-1 has been completed up to the last step of E.6.4.
3. Reactor water level is about 37".
4. Both RR pumps are operating in slow speed.
5. OD-3 Flow Control Line < 66.7% has been verified.
6. Operators are standing by to assist you.

INITIATING CUE:

The Unit Supervisor has directed you to upshift the "A" and "B" reactor recirc pumps to fast speed IAW LOP-RR-05 Step E.1. Inform the Unit Supervisor when the Low Power/Low Flow interlocks are returned to normal.

Task Standard: Correctly upshift reactor recirc pumps A and B to fast speed.

Time Critical Task: Yes/No Page 2 of 10

LASALLE COUNTY STATION JPM d.

JPM Start Time:

Note: All steps of this JPM are to be completed at control room panel H13-P602 unless otherwise noted.

It is the candidates choice of which pump to up-shift first.

Steps 1-8 of this JPM apply to both RR pumps. B RR pump up-shift steps begin at step 14.

1. Performance step: Verify both RR pumps in slow speed with Flow Control Valves full open.

Standard: Slow speed operation and flow control valve position verified by the following:

LFMG SET GEN BRKR 2A and 2B are closed.

LFMG SET DRIVE MOTOR BKR 1A and 1B are closed.

"A" and "B" RR MOTOR BKRs 3A and 3B are open.

"A" and "B" RR motor speeds are 450 rpm.

"A" and "B" RR Loop flow controllers indicate FCV position at 100%.

Cue: None Comment: None

2. Performance step: Verify reactor power between 25% and 35%.

Standard: Control room panel H13-P603 APRM recorders are verified to be indicating between 25% and 35% reactor power.

Cue: IF examinee questions whether the FCL < 66.7%, inform him "Assume the FCL <66.7%."

Comment: None Page 3 of 10

LASALLE COUNTY STATION JPM d.

3. Performance step: Verify reactor operation is below the 66.7% flow control line.

Standard: Control room panel H13-P603 reactor power and core flow indications are compared and reactor is verified to be below the 66.7% flow control line using the graph on the rod sequence book, -or- Use initial conditions data.

Cue: None Comment: None

4. Performance step: CHECK "A" and "B" RR Loop flow controllers are in manual.

Standard: "A" and "B" Loop flow controller "Manual" pushbutton are verified backlit.

Cue: None Comment: None

5. Performance step: CHECK RR MOTOR BKR 4A and 4B are closed.

Standard: "A" RR MOTOR BKR 4A and "B" RR MOTOR BKR 4B verified closed.

Cue: None Comment: None

6. Performance step: CHECK feedwater flow is greater than 2.83 Mlbm/hr.

Standard: Feedwater flow verified to be >2.83 Mlbm/hr at control room panel H13-P603.

Cue: None Comment: None Page 4 of 10

LASALLE COUNTY STATION JPM d.

7. Performance step: CHECK recirc loop suction to steam dome DTs are

>10.1°F.

Standard: At 1DS001 Interlock panel, verifies that recirc loop suction to steam dome DTs are >10.1°F not solid blue.

Cue: None Comment: None

8. Performance step: CHECK reactor water level is 31.5" to 40.5" (between the high and low level alarms.

Standard: Reactor water level is verified to be 31.5" to 40.5" at control room panel H13-P603.

Cue: None Comment: None

9. Performance step: Bypass the A & B RR Interlocks.

Standard: At the 1DS001, examinee selects Loop A & B "Low Flow Bypass" and then PRESSES the ACTIVATE button, then selects Loop A & B "Low Power Bypass" and then PRESS the ACTIVATE button.

Cue: None Comment: None

10. Y Performance step: Close A(B) RR flow control valve to minimum.

Standard: A(B) RR loop flow control station lower pushbutton depressed until the FCV indicates minimum position(<20% indicated).

Cue: None Comment: None Page 5 of 10

LASALLE COUNTY STATION JPM d.

11. Performance step: At the 1DS001, Operator Station Interlocks Screen, verify the following interlocks are RESET.

Standard: The following are RESET:

A & B RR Loop "Feedwater Flow Low" A & B RR Loop "Suction Delta Temp Low" Cue: None Comment: None

12. Performance step: Verify high speed start permissive for A(B) RR pump.

Standard: 1A(1B) RR PMP START PERMISSIVE "HI SPEED" light verified to be lit.

Cue: None Comment: None

13. Performance step: INITIATE TADS data logger to collect data.

Standard: At the 1DS001, Examinee selects the TADS button.

Cue: Events list shows TADS initiated.

Comment: None

14. Y Performance step: Start the A(B) RR pump in fast speed.

Standard: Control switch for 1A(1B RR MOTOR BKR 3A(3B) taken to start.

Cue: None Comment: None Page 6 of 10

LASALLE COUNTY STATION JPM d.

15. Performance step: Verify proper shift to fast speed sequence.

Standard: Sequence monitored by observing the following:

LFMG SET DRIVE MOTOR BKR 1A(1B) opens.

LFMG SET GEN BKR 2A(2B) opens.

1A(1B) RR MOTOR BKR 3A(3B) closes when pump speed decreases to 350 rpm.

1A(1B) RR pump speed increase to ~1750 rpm.

Reactor levels drops then returns to level controller setpoint.

Reactor power increases and then stabilizes.

Cue: None Comment: The candidate should allow plant conditions to stabilize prior to upshifting the second pump keeping in mind that LOP-RR-05 gives the following precaution DO NOT delay upshift of the second pump to minimize loop to loop DT.

16. Performance step: Close B(A) RR flow control valve to minimum.

Standard: B(A) RR loop flow control station lower pushbutton depressed until the FCV indicates minimum position(<20% indicated).

Cue: None Comment: None

17. Performance step: At the 1DS001, Operator Station Interlocks Screen, verify the following interlocks are RESET.

Standard: The following are RESET:

A & B RR Loop "Feedwater Flow Low" A & B RR Loop "Suction Delta Temp Low" Cue: None Comment: None Page 7 of 10

LASALLE COUNTY STATION JPM d.

18. Performance step: Verify high speed start permissive for B(A) RR pump.

Standard: 1B(1A) RR PMP START PERMISSIVE "HI SPEED" light verified to be lit.

Cue: None Comment: None

19. Performance step: INITIATE TADS data logger to collect data.

Standard: At the 1DS001, Examinee selects the TADS button.

Cue: Events list shows TADS initiated.

Comment: None

20. Y Performance step: Start the B(A) RR pump in fast speed.

Standard: Control switch for 1B (1A) RR MOTOR BKR 3B (3A) taken to start.

Cue: None Comment: None

21. Performance step: Verify proper shift to fast speed sequence.

Standard: The RR Pump will fails to upshift to FAST speed and will be tripped.

Sequence monitored by observing the following:

LFMG SET DRIVE MOTOR BKR 1B(1A) opens.

LFMG SET GEN BKR 2B(2A) opens.

1B(1A) RR MOTOR BKR 3B(3A) does NOT close when pump speed decreases to 350 rpm.

Cue: None Comment: None Page 8 of 10

LASALLE COUNTY STATION JPM d.

22. Y Performance step: Enters LOA-RR-101, Unit 1, Reactor Recirculation System Abnormal due to failure of 1B(1A) RR Pump to upshift to FAST speed.

Standard: Enters LOA-RR-101, Unit 1, Reactor Recirculation System Abnormal due to failure of 1B(1A) RR Pump to upshift to FAST speed.

Cue: None Comment: None

23. Performance step: CHECK at least one Recirc pump operating.

Standard: One Recirc pump is verified operating.

Cue: None Comment: None

24. Performance step: PERFORM Subsection B.1, Core Instabilities, while continuing.

Standard: Verifies that Subsection B.1, Core Instabilities, is being implemented while continuing.

Cue: Another NSO will perform Subsection B.1, Core Instabilities.

Comment: None

25. Performance step: CHECK "A" and "B" RR Loop flow controllers are in manual.

Standard: "A" and "B" Loop flow controller "Manual" pushbuttons are verified backlit.

Cue: None Comment: None Page 9 of 10

LASALLE COUNTY STATION JPM d.

26. Performance step: CHECK operating Recirc Pump in HIGH SPEED.

Standard: Operating Recirc Pump verified in HIGH SPEED.

Cue: None Comment: None

27. Performance step: INITIATE required actions of Tech Spec 3.4.1 for Single Loop Operation.

Standard: REDUCE MCPR.

REDUCE APLHGR.

REDUCE LHGR (if required by COLR).

PERFORM LIP-NR-519A/B, Unit 1 APRM Channel A, B,C, D, E, and F and RBM Channel A/B Single Recirculation Loop Setpoint Entry and Exit.

Required actions of Tech Spec 3.4.1 for Single Loop Operation initiated.

Cue: Required actions of Tech Spec 3.4.1 for Single Loop Operation have been initiated.

Comment: This JPM is complete when the required actions of Tech Spec 3.4.1 for Single Loop Operation have been initiated.

JPM Stop Time: _______

Page 10 of 10

LASALLE COUNTY STATION JPM e.

LaSALLE NRC EXAM 2006-301 Job Performance Measure e.

Candidate Name:

Page 1 of 5

LASALLE COUNTY STATION JPM e.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Start one Loop of RHR and Establish Max Suppression Pool Cooling with the Hard Card with a Failure of First Loops 1E12-F068 Valve to Open.

K/A

Reference:

219000A301 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

1. A Transient has occurred.
2. Hard Card use is authorized.
3. An operator is standing by to assist you.

INITIATING CUE:

The Unit Supervisor has directed you to start a loop of RHR in Suppression Pool Cooling. Inform the Unit Supervisor when an RHR loop is running in suppression pool cooling.

Task Standard: Correctly align RHR into the Suppression Pool Cooling Mode of operation.

Time Critical Task: Yes/No Page 2 of 5

LASALLE COUNTY STATION JPM e.

JPM Start Time:

Note: All steps of this JPM are to be completed at control room panel 1H13-P601 unless otherwise noted.

The first loops 1E12-F068 valve will not open forcing the examinee to choose the other loop.

Sim Op W hen it is clear which loop the examinee will choose as his first loop to place in suppression pool cooling, fail the open indication of that loops 1E12 F068 valve by inserting one of the following commands in expert mode: Loop A IOR q1p19rrn off, or, Loop B IOR q1p11rrn off It is not necessary to insert this before the examinees attempt to open the first loops 1E12-F068 valve but it will be necessary before he attempts the second loops 1E12-F068.

Examinees actions with the first RHRSW loop after the attempted opening of 1E12-F068A/B do not affect the outcome of this JPM.

1. Y Performance step: OPEN 1E12-F068A/B, A/B RHR Hx W tr Otlt Vlv.

Standard: Examinee tries to open 1E12-F068A/B, A/B RHR Hx W tr Otlt Vlv.

Cue: None Comment: None

2. Y Performance step: Examinee determines 1E12-F068A/B will not open.

Standard: Applicant reports to US that 1E12-F068A/B will not open.

Cue: If examinee reports that 1E12-F068A/B will not open, repeat the message back without giving further direction Comment: Examinee shifts to other 1E12-F068A/B and opens that valve.

Page 3 of 5

LASALLE COUNTY STATION JPM e.

3. Y Performance step: START RHR Service W ater Pump 1E12-C300A/B/C/D.

Standard: Examinee starts RHR Service W ater Pump 1E12-C300A/B/C/D.

Cue: None Comment: Flow indication should be monitored by the Examinee on FI-1E12-R602A/B.

4. Y Performance step: W hen A/B Loop RHR Service W ater flow rate increases to greater than 3000 gpm, START RHR Service W ater Pump 1E12-C300A/B/C/D.

Standard: Examinee starts RHR Service W ater Pump 1E12-C300A/B/C/D when A/B Loop RHR Service W ater flow rate is >3000 gpm.

Cue: None Comment: None

5. Y Performance step: START RHR Service W ater Pump 1E12-C300A/B/C/D.

Standard: Examinee starts RHR Service W ater Pump 1E12-C300A/B/C/D.

Cue: None Comment: None

6. Y Performance step: START 1E12-C002A/B, A/B RHR Pump Standard: Examinee turns 1E12-C002A/B, A/B RHR Pump control switch to START.

Cue: None Comment: None Page 4 of 5

LASALLE COUNTY STATION JPM e.

7. Y Performance step: THROTTLE OPEN 1E12-F024A/B A/B RHR Test to SP Vlv to maintain flow between 1500 and 7450 gpm as indicated on 1E12-R603A/B.

Standard: Examinee turns 1E12-F024A/B A/B RHR Test to SP Vlv control switch to OPEN and establishes between 1500 to 7450 gpm flow.

Cue: None Comment: W hen 1E12-F048A/B, A/B RHR Hx Bypass Stop is closed this ends the time critical portion of this JPM.

8. Y Performance step: THROTTLE CLOSED 1E12-F048A/B, A/B RHR Hx Bypass Stop Standard: Examinee takes 1E12-F048A/B, A/B RHR Hx Bypass Stop control switch to CLOSE until closed light is lit and OPEN light is extinguished.

Cue: None Comment: None

9. Performance step: Inform Unit Supervisor that task is complete.

Standard: Examinee notifies Unit Supervisor 1A/B RHR is running in max suppression pool cooling.

Cue: AS Unit Supervisor, acknowledge information.

This JPM is complete.

JPM Stop Time:

Page 5 of 5

LASALLE COUNTY STATION JPM f.

LaSALLE NRC EXAM 2006-301 Job Performance Measure f.

Candidate Name:

Page 1 of 6

LASALLE COUNTY STATION JPM f.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Perform RW M Operability Surveillance for Decreasing Reactor Power Below 10%.

K/A

Reference:

201006A3.02 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the Applicant:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

1. Unit 1 Shutdown is in progress.
2. Reactor Power is approximately 15%.

INITIATING CUE:

You are to perform LOS-RW -SR1, Attachment 1A in preparation for the Unit 1 shutdown. Inform the Unit Supervisor when LOS-RW -SR1, Attachment 1A is complete.

Task Standard: LOS-RW -SR1 is correctly completed.

Time Critical Task: Yes/No Page 2 of 6

LASALLE COUNTY STATION JPM f.

JPM Start Time:

Note: All steps of this JPM are to be completed at control room panel 1PM05J unless otherwise noted.

1. Y Performance step: SELECT the A CPU of the RW M.

Standard: Applicant SELECTS the A CPU of the RW M.

Cue: None Comment: None

2. Y Performance step: SELECT any out of sequence control rod NOT at notch position 48.

Standard: Applicant SELECTS any out of sequence control rod NOT at notch position 48.

Cue: None Comment: None

3. Y Performance step: ATTEMPT to single notch withdraw the control rod.

Standard: Applicant ATTEMPTS to single notch withdraw the control rod.

Cue: None Comment: None

4. Y Performance step: VERIFY a control rod withdrawl block is being applied preventing the control rod from moving.

Standard: Applicant VERIFYs a control rod withdrawl block is being applied preventing the control rod from moving.

Cue: None Comment: None Page 3 of 6

LASALLE COUNTY STATION JPM f.

5. Y Performance step: SELECT an in sequence control rod.

Standard: Applicant SELECTS an in sequence control rod.

Cue: None Comment: None

6. Performance step: At panel 1H13-P603, VERIFY alarm window A308 clears.

Standard: Applicant VERIFIES alarm window A308 clears.

Cue: None Comment: None

7. Y Performance step: SELECT the B CPU of the RW M.

Standard: Applicant SELECTS the B CPU of the RW M.

Cue: None Comment: None

8. Y Performance step: SELECT any out of sequence control rod NOT at notch position 48.

Standard: Applicant SELECTS any out of sequence control rod NOT at notch position 48.

Cue: None Comment: None

9. Y Performance step: ATTEMPT to single notch withdraw the control rod.

Standard: Applicant OBSERVES control rod withdrawl one notch.

Cue: None Comment: None Page 4 of 6

LASALLE COUNTY STATION JPM f.

10. Y Performance step: DETERMINE control rod withdrawal block is NOT preventing rod motion and that TS 3.3.2.1.2 &

3.3.2.1.3 apply.

Standard: Applicant DETERMINES control rod withdrawal block is NOT preventing rod motion and that TS 3.3.2.1.2 & 3.3.2.1.3 apply.

Cue: None Comment: None

11. Y Performance step: NOTIFIES Unit Supervisor that selected control rod moved and RW M is inoperable.

Standard: Applicant NOTIFIES Unit Supervisor that RW M is inoperable.

Cue: The Unit Supervisor directs you to restore the control rod back to its original position. And to select the operable RW M CPU per LOP-RW -01 step E.2 and continue the shutdown.

Comment: None

12. Y Performance step: SELECTs previously selected control rod and single notch the rod back to original position.

Standard: Applicant SELECTS previously selected control rod and single notch the rod back to original position.

Cue: None Comment: None

13. Performance step: Obtain LOP-RW -01 step E.2 for guidance on selection of the Alternate RW M System During Normal Operations.

Standard: Applicant obtains LOP-RW -01 step E.2 Cue: None Comment: None Page 5 of 6

LASALLE COUNTY STATION JPM f.

14. Performance step: VERIFY READY light is lit for the alternate system.

Standard: Applicant VERIFIES READY light is lit for the alternate system.

Cue: None Comment: None

15. Y Performance step: MOVE the A/B SELECTOR Switch to the A CPU system and VERIFY the respective ON LINE light is lit.

Standard: Applicant MOVES the A/B SELECTOR Switch to the A CPU system, and VERIFIES the respective ON LINE light is lit.

Cue: This JPM is complete.

Comment: None JPM Stop Time:

Page 6 of 6

LASALLE COUNTY STATION JPM g.

LaSALLE NRC EXAM 2006-301 Job Performance Measure g.

Candidate Name:

Page 1 of 6

LASALLE COUNTY STATION JPM g.

Facility: LaSalle County Station U1/U2 Date: November 13, 2006 Task

Title:

Control Room HVAC / Emergency Makeup Unit Startup K/A

Reference:

288000A401 Method of testing:

Simulated Performance _______________ Actual Performance W Classroom Simulator W Plant Read to the Applicant:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions: You are an extra SRO on shift.

- Unit 1 was scrammed and then a loss of all primary containment cooling was experienced.

- The Field Supervisor is attempting to determine the cause for the failure of the VP system.

- Drywell temperature and pressure are rising.

- LGA-003 has been entered due to high drywell temperature.

- Chemistry has sampled the containment and reported that rad release limits will not be exceeded if the Primary Containment is vented.

INITIATING CUE:

Another NSO is performing LGA-VQ-01 and has requested assistance. The Unit Supervisor has directed you to perform LGA-VQ-01, Attachment B in preparation for venting the containment. An operator with a copy of the procedure is standing by to assist you.

Inform the Unit Supervisor when the A VC Recirculation Charcoal Filter has been started and the plant operator has been directed to startup the A VE Charcoal Filter per step 9 of Attachment B of LGA-VQ-01.

Task Standard: The A VC Recirculation Charcoal Filter has been started and the plant operator has been directed to start up the A VE Charcoal Filter per step 9 of Attachment B of LGA-VQ-01.

Time Critical Task: Yes/No Page 2 of 6

LASALLE COUNTY STATION JPM g.

JPM Start Time:

Note: All steps of this JPM are to be completed at control room panel 1PM05J unless otherwise noted.

1. Y Performance step: MOMENTARILY PLACE 0A CR HVAC Emer MU Fan, 0VC03CA, control switch to START, then release.

Standard: Applicant momentarily places 0A CR HVAC Emer MU Fan, 0VC03CA, control switch to START, then releases.

Cue: None Comment: None

2. Performance step: VERIFY 0A CR HVAC Emer MU Fan, 0VC03CA is running after allowing approximately 20 seconds for VC EMU Train Inlet/Outlet dampers to open.

Standard: Applicant verifies 0A CR HVAC Emer MU Fan, 0VC03CA is running.

Cue: None Comment: None

3. Performance step: VERIFY alarm B106, 0A CR Emer Makeup Fan DP Lo, is CLEAR.

Standard Applicant checks alarm 1PM06J-B106, is clear.

Cue: None Comment: None Page 3 of 6

LASALLE COUNTY STATION JPM g.

4. Performance step: RECORD Date/Time for 0A VC Recirculation Charcoal Filter startup on Attachment D.

Standard: Applicant records date and time on Attachment D.

Cue: None Comment: None

5. Y Performance step: PLACE 0A CR HVAC Charcoal Filter Damper Control switch to FILTER position.

Standard: Applicant places 0A CR HVAC Charcoal Filter Damper Control switch to FILTER position.

Cue: None Comment: None

6. Performance step: VERIFY 0VC11YA, 0A CR HVAC Charcoal Filter Inlet, OPEN Standard: Applicant verifies 0VC11YA, 0A CR HVAC Charcoal Filter Inlet, open.

Cue: None Comment: None

7. Performance step: VERIFY 0VC12YA, 0A CR HVAC Filter Outlet, OPEN Standard: Applicant verifies 0VC12YA, 0A CR HVAC Filter Outlet, open.

Cue: None Comment: None Page 4 of 6

LASALLE COUNTY STATION JPM g.

8. Performance step: VERIFY 0VC13YA, 0A CR HVAC Filter Bypass, CLOSED.

Standard: Applicant verifies 0VC13YA, 0A CR HVAC Filter Bypass, closed.

Cue: None Comment: None

9. Performance step: VERIFY 0A VC Purge Damper Control, 0VC08YA/10YA/14YA switch in PURGE OFF position.

Standard: Applicant verifies 0A VC Purge Damper Control, 0VC08YA/10YA/14YA switch in PURGE OFF position.

Cue: None Comment: The Applicant may not record time until report from the field that VE Filter is started.

10. Performance step: Record Date/Time for 0A VE Recirculation Charcoal Filter startup on Attachment D.

Standard: Applicant records date and time on Attachment D.

Cue: None Comment: None

11. Performance step: 0A VE Recirculation Charcoal Filter placed in service.

Standard: Applicant directs plant operator to perform LGA-VQ-01, Attachment B, Step 9.

Cue: None Comment: None

12. Performance step: Notify Unit Supervisor that plant Operator has been Page 5 of 6

LASALLE COUNTY STATION JPM g.

directed to startup the A VE Charcoal Filter per Step 9 of LGA-VQ-01, Attachment B.

Standard: Applicant notifies Unit Supervisor.

Cue: Acknowledge report. This JPM is complete.

JPM Stop Time:

Page 6 of 6