ML21181A298 | 30 June 2021 | Pre-submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regardingan Emergency Preparedness Exercise Exemption for Wolf Creek Generating Station, Unit 1 | Exemption Request |
ML21168A140 | 7 June 2021 | 4 to Updated Safety Analysis Report, M-6630-00017A, W08 G3D to H, Structural Steel Fire Proofing Data | Safe Shutdown Boric Acid Fire Barrier Coatings Fire Protection Program |
ML21168A165 | 7 June 2021 | Fire Hazards Analysis, E-1F9915, Rev 14, Design Basis Document for Procedure Ofn RP-017 | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Ultimate heat sink Temporary Modification Multiple Spurious Operation Arc flash Emergency Lighting Fire Protection Program |
ML21168A164 | 7 June 2021 | 4 to Updated Safety Analysis Report, EQSD-II, Rev 32, EQ Master List Change Notice | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake |
ML21168A163 | 7 June 2021 | Fire Hazards Analysis, E-1F9905, Rev. 10, Fire Hazard Analysis | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Emergency Lighting Earthquake Fire Protection Program Early Warning Fire Detection |
ML21168A162 | 7 June 2021 | Fire Hazards Analysis, XX-E-013, Rev 4_CN006, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Cyber Security |
ML21168A161 | 7 June 2021 | Fire Hazards Analysis, XX-E013, Rev 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown |
ML21168A160 | 7 June 2021 | 4 to Updated Safety Analysis Report, Wcqpm, Rev. 11, Wolf Creek Quality Program Manual | |
ML21168A159 | 7 June 2021 | Fire Hazards Analysis, XX-E013, Rev 4, Post-Fire Safe Shutdown (PFSSD) Analysis | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Operator Manual Action Cyber Security Multiple Spurious Operation Emergency Lighting Pressure Boundary Leakage Fire Protection Program Backfit |
ML21168A158 | 7 June 2021 | 4 to Updated Safety Analysis Report, EQSD-I, Rev 14, Equipment Qualification Design Basis Document | Safe Shutdown Boric Acid Fire Barrier Anticipated operational occurrence Tornado Missile Hydrostatic Functionality Assessment Aging Management Operability Determination License Renewal Earthquake Grace period GOTHIC Operability Assessment |
ML21168A156 | 7 June 2021 | 4 to Updated Safety Analysis Report, E-013, Rev 4_CN008, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Emergency Lighting |
ML21168A155 | 7 June 2021 | XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Cyber Security |
ML21168A154 | 7 June 2021 | XX-E013,Rev 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown |
ML21168A153 | 7 June 2021 | Fire Hazards Analysis E-1F9900, Rev 9 - Redacted, Post Fire Safe Shutdown Operator Manual Actions | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Fire impairment Operator Manual Action Multiple Spurious Operation Arc flash Emergency Lighting Incorporated by reference Significance Determination Process Thermoset Continuous fire watch Fire Protection Program Fire Watch |
ML21168A141 | 7 June 2021 | 4 to Updated Safety Analysis Report, M-6630-00017A, W08 B7 to B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail FB-1 Limitation | Safe Shutdown Fire Barrier Fire Protection Program |
ML21168A166 | 7 June 2021 | Fire Hazards Analysis, E-1F9910, Rev 16, CN16-01, Post Fire Safe Shutdown Area Analysis | Safe Shutdown |
ML21168A139 | 7 June 2021 | 4 to Updated Safety Analysis Report, M-6630-00017A, Rev. W08, C to G3C, Fire Protection Evaluation for Unique or Unbounded Fire Wrap Configurations | Safe Shutdown Boric Acid Fire Barrier Coatings Fire Protection Program |
ML21168A138 | 7 June 2021 | 4 to Updated Safety Analysis Report, M-6630-00017A, W08 1 to B6, Redacted, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations | Safe Shutdown Fire Barrier Coatings Fire Protection Program |
ML21168A134 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 18, Drawing M-12SJ04, Revision 16, Piping and Instrumentation Diagram Nuclear Sampling System | |
ML21168A133 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 12, Redacted | |
ML21168A132 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 1, System Designator | |
ML21168A131 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 2, Figures | |
ML21168A130 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 5, Figures | |
ML21168A129 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 11, Drawing M-12HB01, Revision 16, Piping and Instrumentation Diagram Liquid Radwaste System | |
ML21168A128 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 10, Drawing M-12AC01, Revision 30, Piping & Instrumentation Diagram Main Turbine | |
ML21168A127 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 7, Figures | |
ML21168A126 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 9, Drawing M-12EC01, Revision 23, Piping & Instrumentation Diagram Fuel Pool Cooling and Clean-Up System. Redacted | |
ML21168A125 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 8, Drawing No. KD-7750, Revision 14, Wolf Creek Substation General Plan | |
ML21168A124 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 6, Figures | |
ML21168A104 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 15, Accident Analysis | |
ML21168A120 | 7 June 2021 | 4 to Updated Safety Analysis Report, List of Effective Pages (Loep) | |
ML21168A121 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 12, Radiation Protection | Safe Shutdown Boric Acid High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Coatings Incorporated by reference Fuel cladding Pressure Boundary Leakage Scaffolding |
ML21168A111 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 2, Figures | |
ML21168A119 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features | Safe Shutdown Boric Acid Packing leak Ultimate heat sink Stroke time Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Nondestructive Examination Emergency Lighting Incorporated by reference Tornado Missile Protection Thermoset Frazil ice Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Scaffolding GOTHIC |
ML21168A116 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Anticipated operational occurrence Water Inventory Control Safe Shutdown Earthquake Met Tower Temporary Modification Incorporated by reference Earthquake Fuel cladding Pressure Boundary Leakage Power change Coast down |
ML21168A122 | 7 June 2021 | 4 to Updated Safety Analysis Report | |
ML21168A109 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 16, Relocated Technical Specifications | Incorporated by reference |
ML21168A112 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 4, Reactor | |
ML21168A113 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid High winds Shutdown Margin Loop seal Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Incorporated by reference Finite Element Analysis B.5.b Tornado Generated Missile Tornado Missile Protection Design basis earthquake Excess Flow Check Valve Frazil ice Earthquake Power-Operated Valves Fuel cladding Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection Scaffolding Grace period Power change Exit Sign |
ML21168A114 | 7 June 2021 | 4 to Updated Safety Analysis Report, Cover Sheet | |
ML21168A115 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 8, Electric Power | Hot Short Safe Shutdown Boric Acid Fire Barrier Temporary Modification Emergency Lighting Incorporated by reference Open Phase Condition |
ML21168A117 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Boric Acid Loop seal Stroke time Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Scaffolding Power change |
ML21168A105 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management | Safe Shutdown Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Hydrostatic Incorporated by reference Annual Radioactive Effluent Release Report Process Control Program Earthquake Pressure Boundary Leakage |
ML21168A123 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 17, Quality Assurance | Incorporated by reference |
ML21168A107 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations | Offsite Dose Calculation Manual Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Incorporated by reference Job Performance Measure Process Control Program Safeguards Contingency Plan License Renewal Exemption Request Fire Protection Program Scaffolding Grace period |
ML21168A106 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements | Safe Shutdown Boric Acid Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Incorporated by reference Aging Management Pressure and Temperature Limits Report License Renewal Control of Heavy Loads Fuel cladding Biofouling Fire Protection Program |
ML21168A110 | 7 June 2021 | 4, Response to Request for Additional Information (RAI) | Hot Short Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Coatings Emergency Lighting Earthquake Turbine Missile Fire Protection Program |
ML21168A100 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Offsite Dose Calculation Manual Tornado Missile Hydrostatic Incorporated by reference Tornado Missile Protection Fast acting solenoid valve Earthquake Power-Operated Valves Turbine Missile |
ML21168A108 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 14, Initial Test Program | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Hydrostatic Temporary Modification Emergency Lighting |
WO 21-0011, Fire Hazards Analysis, XX-E013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis | 7 June 2021 | Fire Hazards Analysis, XX-E013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Cyber Security |