ML21112A108 | 30 June 2021 | Issuance of Amendment No. 219 to Modify Technical Specification 6.9.1.11, Core Operating Limits Report | Boric Acid Shutdown Margin Coatings |
ML21180A405 | 29 June 2021 | (Vcsns), Unit 1 - Supplement to Request for Additional Information Regarding RF-25 Stem Generator Tube Inspection Report | |
ML21187A124 | 28 June 2021 | 10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification | |
ML21175A247 | 24 June 2021 | 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- | |
ML21173A178 | 22 June 2021 | NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD) | |
ML21168A339 | 17 June 2021 | Virgil C. Summer Nuclear Station, North Anna Power Station, Surry Power Station -Submission of Revision 30 of the Quality Assurance Topical Report | Fitness for Duty Shutdown Margin Non-Destructive Examination Grab sample Commercial Grade Dedication Hydrostatic Coatings Nondestructive Examination Temporary Modification Incorporated by reference Condition Adverse to Quality Aging Management Process Control Program License Renewal Pandemic COVID-19 Liquid penetrant Fire Protection Program Grace period |
ML21168A261 | 17 June 2021 | (Vcsns), Unit 1 - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors - Final Supplemental Response | Coatings |
ML21154A180 | 3 June 2021 | Response to NRC Request for Additional Information Regarding RGF-25 Steam Generator Tube Inspection Report | |
ML21154A279 | 3 June 2021 | Requalification Program Inspection 05000395/2021003 - Virgil C. Summer Nuclear Station, Unit 1, | |
IR 05000395/2021011 | 1 June 2021 | Biennial Problem Identification and Resolution Inspection Report 05000395/2021011 | |
ML21147A377 | 27 May 2021 | (Vcsns), Unit 1 - Proposed Amendment to Relocate Unit Staff Qualification from Technical Specifications to Quality Assurance Program Description (QAPD) | |
ML21145A022 | 24 May 2021 | 003 Radiation Safety Baseline Inspection Information Request | Offsite Dose Calculation Manual Process Control Program COVID-19 |
ML21140A369 | 20 May 2021 | (Vcsn), Unit 1 - 10 CFR 72.48 Biennial Report | |
ML21138A854 | 18 May 2021 | Special Report 2021-002 Waste Gas System Inoperability | |
ML21133A368 | 13 May 2021 | Control Point Hazard | |
IR 05000395/2021001 | 12 May 2021 | Integrated Inspection Report 05000395/2021001 | Boric Acid Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program |
ML21131A040 | 11 May 2021 | NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review | |
ML21131A161 | 11 May 2021 | Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting | Coronavirus |
ML21125A194 | 5 May 2021 | NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064) | |
ML21209A459 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2b, Revision 11, Electrical Duct Runs for Diesel Generator Circuits Main Plant Area - East End | |
ML21209A463 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 7, Sheet 1, Piping System Flow Diagram Service Water Cooling | Hydrostatic |
ML21209A461 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-14, Revision 32, Piping System Flow Diagram Non-Nuclear Plant Drains | Hydrostatic |
ML21209A460 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Drawing E-726-232, Revision 2, Condenser Circ. Water Intake Structure Retaining Walls Bottom Slab Reinforcement Plans Retaining Walls 1 and 2 (1) | |
ML21209A468 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9c, Revision 5, Piping System Flow Diagram Domestic Water System | |
ML21209A464 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-31, Revision 15 - 2018-02 - NRC 18, Building Service System Flow Diagram R.B C.R.D.M. Shroud Vent System | |
ML21209A465 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.5-3, Revision 15, I & C Monitor Lights Safety Injection (BOP) ESF Monitor Lights | |
ML21209A466 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-24, 302-791, Revision 27, Piping System Flow Diagram Reactor Make-Up Water | Boric Acid Hydrostatic |
ML21209A467 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Revision 21, Building Serice System Flow Diagram Controlled Access Supply Cooling System | |
ML21209A478 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2, Electrical One Line and Relay Program Engineered and Safety Features Vital AC System | |
ML21209A458 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-11, Revision 10, Building Service Plumbing Station Drainage Flow Diagram Fuel Handling Building | |
ML21209A457 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-13, Revision 21, Piping System Flow Diagram Nuclear Drains to Waste Holdup Tank | |
ML21209A456 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2c, Electrical Duct Runs for Diesel Generator Circuits Outdoor Area - East End | |
ML21209A455 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, 12.1-2, and 12.1-11: Redacted | |
ML21209A454 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-1, D-302-221, Revision 32, Sheet 1, Piping System Flow Diagram Service Water Cooling | Hydrostatic |
ML21209A453 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-2, Revision 46, Piping System Flow Diagram Instrument Air | |
ML21209A452 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16 / Drawing E-302-676, R15, System Flow Diagram Chemical and Volume Control. Sheet 4 | |
ML21209A451 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-2, Electrical One Line Diagram 230KV Substation Layout | |
ML21209A450 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-11-R16 - Redacted | |
ML21209A447 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-14, Nuclear Blowdown Processing System Holdup Tank and Demineralizer Design Engineering | |
ML21209A446 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-4, Electrical One Line and Relay Diagram Engineered Safety Features Power System | |
ML21209A448 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-01, Electrical Diesel Generator Shutdown Control Logic Diagram | |
ML21209A449 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Sheet 1A, Piping System Flow Diagram Chemical and Volume Control | |
ML21209A443 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-10, Piping System Flow Diagram Feedwater (Non-Nuclear) | |
ML21209A444 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-22, Revision 31, Piping System Flow Diagram Chilled Wafer Pump & Chiller Area | |
ML21209A445 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-4, Piping System Flow Diagram Nuclear Sampling | |
ML21209A480 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-8, Building Service Floor & Equipment Drains Station Drainage Flow Diagram Turbine Building | |
ML21209A479 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-18 - Redacted | |
ML21209A469 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-32, Revision 22 - NRC16, Piping System Flow Diagram CRDM Cooling Water | |
ML21209A477 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-24, Piping System Flow Diagram Chilled Water - to Cooling Coils | Hydrostatic |
ML21209A476 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-11 - Redacted |