Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21112A10830 June 2021Issuance of Amendment No. 219 to Modify Technical Specification 6.9.1.11, Core Operating Limits ReportBoric Acid
Shutdown Margin
Coatings
ML21180A40529 June 2021(Vcsns), Unit 1 - Supplement to Request for Additional Information Regarding RF-25 Stem Generator Tube Inspection Report
ML21187A12428 June 202110CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification
ML21175A24724 June 20212020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....-
ML21173A17822 June 2021NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD)
ML21168A33917 June 2021Virgil C. Summer Nuclear Station, North Anna Power Station, Surry Power Station -Submission of Revision 30 of the Quality Assurance Topical ReportFitness for Duty
Shutdown Margin
Non-Destructive Examination
Grab sample
Commercial Grade Dedication
Hydrostatic
Coatings
Nondestructive Examination
Temporary Modification
Incorporated by reference
Condition Adverse to Quality
Aging Management
Process Control Program
License Renewal
Pandemic
COVID-19
Liquid penetrant
Fire Protection Program
Grace period
ML21168A26117 June 2021(Vcsns), Unit 1 - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors - Final Supplemental ResponseCoatings
ML21154A1803 June 2021Response to NRC Request for Additional Information Regarding RGF-25 Steam Generator Tube Inspection Report
ML21154A2793 June 2021Requalification Program Inspection 05000395/2021003 - Virgil C. Summer Nuclear Station, Unit 1,
IR 05000395/20210111 June 2021Biennial Problem Identification and Resolution Inspection Report 05000395/2021011
ML21147A37727 May 2021(Vcsns), Unit 1 - Proposed Amendment to Relocate Unit Staff Qualification from Technical Specifications to Quality Assurance Program Description (QAPD)
ML21145A02224 May 2021003 Radiation Safety Baseline Inspection Information RequestOffsite Dose Calculation Manual
Process Control Program
COVID-19
ML21140A36920 May 2021(Vcsn), Unit 1 - 10 CFR 72.48 Biennial Report
ML21138A85418 May 2021Special Report 2021-002 Waste Gas System Inoperability
ML21133A36813 May 2021Control Point Hazard
IR 05000395/202100112 May 2021Integrated Inspection Report 05000395/2021001Boric Acid
Functionality Assessment
FLEX
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
ML21131A04011 May 2021NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review
ML21131A16111 May 2021Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, MeetingCoronavirus
ML21125A1945 May 2021NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064)
ML21209A45930 April 20211 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2b, Revision 11, Electrical Duct Runs for Diesel Generator Circuits Main Plant Area - East End
ML21209A46330 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 7, Sheet 1, Piping System Flow Diagram Service Water CoolingHydrostatic
ML21209A46130 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-14, Revision 32, Piping System Flow Diagram Non-Nuclear Plant DrainsHydrostatic
ML21209A46030 April 20211 to Updated Final Safety Analysis Report, Drawing E-726-232, Revision 2, Condenser Circ. Water Intake Structure Retaining Walls Bottom Slab Reinforcement Plans Retaining Walls 1 and 2 (1)
ML21209A46830 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9c, Revision 5, Piping System Flow Diagram Domestic Water System
ML21209A46430 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-31, Revision 15 - 2018-02 - NRC 18, Building Service System Flow Diagram R.B C.R.D.M. Shroud Vent System
ML21209A46530 April 20211 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.5-3, Revision 15, I & C Monitor Lights Safety Injection (BOP) ESF Monitor Lights
ML21209A46630 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-24, 302-791, Revision 27, Piping System Flow Diagram Reactor Make-Up WaterBoric Acid
Hydrostatic
ML21209A46730 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Revision 21, Building Serice System Flow Diagram Controlled Access Supply Cooling System
ML21209A47830 April 20211 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2, Electrical One Line and Relay Program Engineered and Safety Features Vital AC System
ML21209A45830 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-11, Revision 10, Building Service Plumbing Station Drainage Flow Diagram Fuel Handling Building
ML21209A45730 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-13, Revision 21, Piping System Flow Diagram Nuclear Drains to Waste Holdup Tank
ML21209A45630 April 20211 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2c, Electrical Duct Runs for Diesel Generator Circuits Outdoor Area - East End
ML21209A45530 April 20211 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, 12.1-2, and 12.1-11: Redacted
ML21209A45430 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-1, D-302-221, Revision 32, Sheet 1, Piping System Flow Diagram Service Water CoolingHydrostatic
ML21209A45330 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-2, Revision 46, Piping System Flow Diagram Instrument Air
ML21209A45230 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16 / Drawing E-302-676, R15, System Flow Diagram Chemical and Volume Control. Sheet 4
ML21209A45130 April 20211 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-2, Electrical One Line Diagram 230KV Substation Layout
ML21209A45030 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-11-R16 - Redacted
ML21209A44730 April 20211 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-14, Nuclear Blowdown Processing System Holdup Tank and Demineralizer Design Engineering
ML21209A44630 April 20211 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-4, Electrical One Line and Relay Diagram Engineered Safety Features Power System
ML21209A44830 April 20211 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-01, Electrical Diesel Generator Shutdown Control Logic Diagram
ML21209A44930 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Sheet 1A, Piping System Flow Diagram Chemical and Volume Control
ML21209A44330 April 20211 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-10, Piping System Flow Diagram Feedwater (Non-Nuclear)
ML21209A44430 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-22, Revision 31, Piping System Flow Diagram Chilled Wafer Pump & Chiller Area
ML21209A44530 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-4, Piping System Flow Diagram Nuclear Sampling
ML21209A48030 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-8, Building Service Floor & Equipment Drains Station Drainage Flow Diagram Turbine Building
ML21209A47930 April 20211 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-18 - Redacted
ML21209A46930 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-32, Revision 22 - NRC16, Piping System Flow Diagram CRDM Cooling Water
ML21209A47730 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-24, Piping System Flow Diagram Chilled Water - to Cooling CoilsHydrostatic
ML21209A47630 April 20211 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-11 - Redacted