ML21140A369

From kanterella
Jump to navigation Jump to search
(Vcsn), Unit 1 - 10 CFR 72.48 Biennial Report
ML21140A369
Person / Time
Site: Summer, 07201038  South Carolina Electric & Gas Company icon.png
Issue date: 05/20/2021
From: Lippard G
Dominion Energy South Carolina
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
21-180
Download: ML21140A369 (1)


Text

V.C.

Bradham SummerNuclear Blvd Station SC 29065

& Hwy 215,Jenkinsville, ~

.y Dominion Mailing Address: y P.O. Box 88,Jenkinsville, SC 29065 l "--'

DominionEnergy.com May20,2021 Attn: Document Control Desk Serial No.21-180 Director, Division of Spent Fuel Management VCS-LIC/BAB RO Office ofNuclearMaterial SafetyandSafeguards Docket No.50-395 &

U.S.Nuclear Regulatory Commission 72-1038 Washington, DC20555-0001 License No.NPF-12 V

DOCKET NO.50-395 & 721038 OPERATING LICENSE NO.NPF-12 10CFR72.48 BIENNIAL REPORT DESChereby submits theVCSNSreport pursuant to10CFR72.48(d)(2) forchanges madetotheIndependent Spent Fuel Storage Installation (ISFSI). 10 CFR 72.48(d)(2) requires a report containing a brief descriptionofany ISFSl-related changes, tests, or experiments madeinthelast 24months.

There havebeennoISFSl-related changes evaluated under the 72.48 process since thelast report wassubmitted onMay2,2018. VCSNSrecognizes thatthis reportisnot being submitted within 24months oftheprevious report. This has been documented in CR-21-01218.

Should youhaveanyquestions, please callMichael S.Moore at(803) 345-4752.

Sincerely, -

George A.Lippard Site Vice President V.C. SummerNuclear Station Commitments contained inthis letter:

None cc: G.J.Lindamood -

Santee Cooper L.Dudes NRCRegion II V.Thomas NRCProject Manager NRCResident Inspector ISFSI