ML21140A369

From kanterella
Jump to navigation Jump to search
(Vcsn), Unit 1 - 10 CFR 72.48 Biennial Report
ML21140A369
Person / Time
Site: Summer, 07201038  
Issue date: 05/20/2021
From: Lippard G
Dominion Energy South Carolina
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
21-180
Download: ML21140A369 (1)


Text

V.C.SummerNuclear Station Dominion Bradham Blvd& Hwy 215,Jenkinsville, SC 29065

~

.y Mailing Address:

y P.O. Box 88,Jenkinsville, SC 29065 l

DominionEnergy.com May20,2021 Attn:

Document Control Desk Serial No.21-180

Director, Division of Spent FuelManagement VCS-LIC/BAB RO Office ofNuclearMaterial SafetyandSafeguards Docket No.50-395 U.S.Nuclear Regulatory Commission 72-1038 Washington, DC20555-0001 License No.NPF-12 V

DOCKETNO.50-395

&721038 OPERATINGLICENSENO.NPF-12 10CFR72.48 BIENNIAL REPORT DESChereby submits theVCSNSreport pursuant to10CFR72.48(d)(2) forchanges madetotheIndependent Spent FuelStorage Installation (ISFSI).10CFR72.48(d)(2) requires areport containing abrief description ofany ISFSl-related

changes, tests, or experiments madeinthelast 24months.

TherehavebeennoISFSl-related changes evaluated under the 72.48 process since thelast report wassubmitted onMay2,2018.

VCSNSrecognizes thatthis report isnot being submitted within 24months oftheprevious report.

This has been documented in CR-21-01218.

Should youhaveanyquestions, please call Michael S.Mooreat(803) 345-4752.

Sincerely, George A.Lippard Site VicePresident V.C.SummerNuclear Station Commitments contained inthis letter:

None cc:

G.J.Lindamood

- Santee Cooper L.Dudes

- NRCRegion II V.Thomas

- NRCProject Manager NRCResident Inspector ISFSI