Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CAC:MF988730 June 2017
L-17-223, Application to Revise Technical Specifications to Adopt TSTF-547-A, Revision 1, Clarification of Rod Position Requirements.30 June 2017Application to Revise Technical Specifications to Adopt TSTF-547-A, Revision 1, Clarification of Rod Position Requirements.Boric Acid
Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
L-17-214, Discharge Monitoring Report NPDES for May 201727 June 2017Discharge Monitoring Report NPDES for May 2017Grab sample
CAC:MF833326 June 2017
ML17167A06726 June 2017Requests for Alternatives and Requests for Relief Fourth 10-Year Inservice Test Program Interval (CAC Nos. MF8333-MF8356). Note: Correction Safety Evaluation See ML17255A526Boric Acid
Stroke time
Incorporated by reference
Surveillance Frequency Control Program
Grace period
CAC:MF833226 June 2017
ML17255A50826 June 2017Correction to the Safety Evaluation to Beaver Valley Power Station, Unit No. 1 - Requests for Alternatives and Requests for Relief Fifth 10-Year Inservice Testing Program Interval (CAC Nos. MF8332 Through MF8357)Boric Acid
Stroke time
Probabilistic Risk Assessment
Temporary Modification
Incorporated by reference
Scaffolding
Grace period
ML17159A44226 June 2017Requests for Alternatives and Requests for Relief Fifth 10-Year Inservice Testing Program Interval (CAC Nos. MF8332 Through MF8357). Note: Correction Safety Evaluation See ML17255A508Boric Acid
Stroke time
Probabilistic Risk Assessment
Temporary Modification
Incorporated by reference
Scaffolding
Grace period
ML17255A52626 June 2017Correction to the Safety Evaluation to Beaver Valley Power Station, Unit No. 2 - Requests for Alternatives and Requests for Relief Fourth 10-Year Inservice Test Program Interval (CAC Nos. MF8333-MF8356)Boric Acid
Stroke time
Incorporated by reference
Surveillance Frequency Control Program
Grace period
L-17-197, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 80523 June 2017Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Large early release frequency
Fire Protection Program
Very Early Warning Fire Detection
L-17-040, Transmittal of 2016 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models20 June 2017Transmittal of 2016 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation ModelsFuel cladding
L-17-037, Report of Facility Changes, Tests and Experiments20 June 2017Report of Facility Changes, Tests and Experiments
ML17170A31819 June 2017Requalification Program Inspection-Beaver Valley Power Station, Unit 2 Dated June 19, 2017
L-17-198, Emergency Response Data System Data Point Library Update16 June 2017Emergency Response Data System Data Point Library Update
L-17-195, CFR 71.95 Report - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 923314 June 2017CFR 71.95 Report - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 9233Weak link
ML17158B1669 June 2017Summary of Meeting with Firstenergy Nuclear Operating Company Regarding the Spring 2017 Steam Generator Inspections at Beaver Valley Power Station, Unit 2
ML17157B2847 June 2017Correction to Conforming Amendment No. 187 Order to Transfer License
ML17156A6066 June 2017Issuance of Amendment No. 15 to Indemnity Agreement No. B-73 Order to Transfer License and Conforming Amendment
L-17-071, Cycle 20 Core Operating Limits Report6 June 2017Cycle 20 Core Operating Limits Report
ML17115A12330 May 2017Issuance of Amendment Application for Order to Transfer License and Conforming Amendment
L-17-180, Submittal of Discharge Monitoring Report for April 201722 May 2017Submittal of Discharge Monitoring Report for April 2017Grab sample
L-17-104, Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan20 May 2017Response to Request for Additional Information Regarding a Request to Revise the Emergency PlanSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
ML17095A27618 May 2017Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
High Radiation Area
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
FLEX
B.5.b
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
Frazil ice
Earthquake
Fire Protection Program
Coast down
L-17-159, Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement18 May 2017Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement
L-17-169, Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary of Required Insurance18 May 2017Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary of Required Insurance
CAC:MF971518 May 2017
CAC:MF971418 May 2017
IR 05000334/201700115 May 2017Integrated Inspection Report 05000334/2017001 and 05000412/2017001 and Exercise of Enforcement DiscretionSafe Shutdown
Fire Barrier
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Tornado-Generated Missile
Significance Determination Process
Tornado Missile Protection
Open Phase Condition
Operability Determination
Power change
ML17213A01711 May 2017Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1Safe Shutdown
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Earthquake
Weak link
Seismic Walkdown Report
ML17213A01611 May 2017Enclosure a: Beaver Valley, Units 1, Seismic Probabilistic Risk Assessment in Response to 50.54(f) Letter with Regard to NTTF 2.1Safe Shutdown
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Earthquake
Weak link
Seismic Walkdown Report
ML17081A50911 May 2017ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3High Radiation Area
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Pressure Boundary Leakage
ML17123A2173 May 2017March 8, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public)Generic Fundamentals Examination
05000412/LER-2017-0012 May 2017Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category 1 Piping to Not Seismic Category 1 Piping
LER 17-001-00 For Beaver Valley Power Station, Unit No. 2 Re: Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category l Piping to Not Seismic Category 1 Piping
Unanalyzed Condition
Time of Discovery
Past operability
Enforcement Discretion
Functionality Assessment
Tornado Missile Protection
Large early release frequency
ML17124A51326 April 2017Final After Action Report/Improvement Plan for the Beaver Valley Power Station (BVPS) Medical Services (MS-1) Drill Held on March 29, 2017
L-17-153, Discharge Monitoring Report Permit No. PA0025615 for March 201726 April 2017Discharge Monitoring Report Permit No. PA0025615 for March 2017
L-17-149, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations25 April 2017Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML17114A06224 April 2017Supplemental Information Regarding Decommissioning Funding Status Report
ML17117A45021 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 11, Radioactive Wastes and Radiation ProtectionHigh Radiation Area
ML17117A45421 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 15, Technical Specifications and BasesPressure and Temperature Limits Report
L-17-029, Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 8, Electrical Systems21 April 2017Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 8, Electrical SystemsSafe Shutdown
Boric Acid
Emergency Lighting
Design basis earthquake
Earthquake
ML17244A91221 April 2017Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 2, SiteSafe Shutdown
Boric Acid
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Tornado Missile
Hydrostatic
Tornado Generated Missile
Tornado Missile Protection
Design basis earthquake
Annual Radiological Environmental Operating Report
Earthquake
ML17117A45221 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 13, Initial Tests and OperationBoric Acid
Hydrostatic
Liquid penetrant
ML17117A44221 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 4, Reactor Coolant System
ML17117A45621 April 2017Revision 30 to Updated Final Safety Analysis Report, Appendix a, Quality AssuranceSafe Shutdown
Boric Acid
Nondestructive Examination
ML17117A43921 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 1, Introduction and SummarySafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Design basis earthquake
Earthquake
Fuel cladding
Power change
Flow Induced Vibration
ML17117A44721 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 9, Auxiliary and Emergency System
ML17117A45121 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 12, Conduct of Operations
ML17117A43821 April 2017Revision 30 to Updated Final Safety Analysis Report, Summary List of Effective Pages
ML17117A43521 April 2017Submittal of Revision 30 to Updated Final Safety Analysis ReportAging Management
License Renewal
Fire Protection Program
ML17117A44321 April 2017Revision 30 to Updated Final Safety Analysis Report, Section 5, Containment Systems