L-17-037, Report of Facility Changes, Tests and Experiments

From kanterella
Jump to navigation Jump to search
Report of Facility Changes, Tests and Experiments
ML17172A008
Person / Time
Site: Beaver Valley
Issue date: 06/20/2017
From: Richey M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-17-037
Download: ML17172A008 (1)


Text

June 20, 2017 FENOC FirstEnergy Nuclear Operating Company '

Marty L. Richey Site Vice President L-17-037 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Report of Facility Changes, Tests and Experiments Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 10 CFR 50.59(d)(2) 724-682-5234 Fax: 724-643-8069 FirstEnergy Nuclear Operating Company reports that there were no evaluations completed pursuant to 10 CFR 50.59 during the reporting period of November 1, 2015 to March 31, 2017 for the Beaver Valley Power Station, Unit No. 1.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 315-6810.

Sincerely,

~,Q~

Marty L. Ri~ey cc:

NRC Region I Administrator NRC Senior Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative