Issue date | Title | Topic | |
---|---|---|---|
L-2009-160, Transmittal of Request for Major Revision and Permit Renewal Notification | 30 June 2009 | Transmittal of Request for Major Revision and Permit Renewal Notification | |
L-2009-151, WCAP-17091-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F). | 30 June 2009 | WCAP-17091-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F). | Hydrostatic Finite Element Analysis |
TAC:ME1754 | 30 June 2009 | ||
L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 | 29 June 2009 | Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Fire Barrier Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Process Control Program Safeguards Contingency Plan Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
ML091800277 | 29 June 2009 | FW: RR 31 and 32 RAI Request (Question 2.3.3) | Nondestructive Examination |
ML091800453 | 29 June 2009 | Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop | License Renewal |
TAC:ME1624 | 25 June 2009 | ||
L-2009-133, License Amendment Request 196 Alternative Source Term and Conforming Amendment | 25 June 2009 | License Amendment Request 196 Alternative Source Term and Conforming Amendment | Safe Shutdown Boric Acid Packing leak Annual Radioactive Effluent Release Report Large early release frequency Earthquake Pressure Boundary Leakage Power change GOTHIC Unidentified leakage Power Uprate |
ML091740145 | 23 June 2009 | Initial Exam 2009-301 Draft SRO Written Exam | Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area |
ML091740164 | 23 June 2009 | Initial Exam 2009-301 Draft Administrative Documents | |
ML091740160 | 23 June 2009 | Initial Exam 2009-301 Draft RO Exam | Boric Acid Shutdown Margin |
ML091740144 | 23 June 2009 | Initial Exam 2009-301 Draft Simulator Scenarios | Boric Acid Shutdown Margin |
ML091740135 | 23 June 2009 | Initial Exam 2009-301 Draft Simulator/In-Plant JPMs | Boric Acid Job Performance Measure |
ML091740128 | 23 June 2009 | Initial Exam 2009-301 Draft Administrative JPMs | Job Performance Measure Unidentified leak |
ML091740125 | 23 June 2009 | Initial Exam 2009-301 Final Administrative Documents | Boric Acid Job Performance Measure |
ML091740111 | 23 June 2009 | Initial Exam 2009-301 Final Simulator Scenarios | Boric Acid Loop seal |
ML091740105 | 23 June 2009 | Initial Exam 2009-301 Final Simulator/In-Plant JPMs | Boric Acid Shutdown Margin Offsite Dose Calculation Manual Job Performance Measure |
ML091740103 | 23 June 2009 | Initial Exam 2009-301 Final Administrative JPMs | |
ML15314A542 | 19 June 2009 | NRC-034 - Fla. Dep'T. of Envtl. Protection, Conditions of Certification for Florida Power & Light Company: Turkey Point Plant, Units 3 and 4 Nuclear Power Plant, Unit 5 Combined Cycle Plant, PA 03-45D (June 19, 2009) (ADAMS Accession No. ML | Incorporated by reference Annual Radiological Environmental Operating Report |
ML16015A389 | 19 June 2009 | Official Exhibit - NRC-034-00-BD01 - Fla. Dep'T. of Envtl. Protection, Conditions of Certification for Florida Power & Light Company: Turkey Point Plant, Units 3 and 4 Nuclear Power Plant, Unit 5 Combined Cycle Plant, PA 03-45D (June 19, 20 | Incorporated by reference Annual Radiological Environmental Operating Report |
ML15142A650 | 19 June 2009 | Florida Department of Environmental Protection Conditions of Certification - PA 03-45D on Turkey Point Units 3, 4, and 5 | Incorporated by reference Annual Radiological Environmental Operating Report |
L-2009-135, Turkey Point, Units 3 & 4 - Response to NRC Trace Plant Model Data Request - Extended Power Uprate | 19 June 2009 | Turkey Point, Units 3 & 4 - Response to NRC Trace Plant Model Data Request - Extended Power Uprate | |
ML091830392 | 19 June 2009 | Response to NRC Trace Plant Model Data Request - Extended Power Uprate | |
IR 05000250/2009402 | 18 June 2009 | IR 05000250-09-402, IR 05000251-09-402, on 05/01/2009, Turkey Point - NRC Security Inspection | Significance Determination Process Affidavit |
ML15314A530 | 11 June 2009 | FPL-007 - Map of Turkey Point Property and Cooling Canal Flow Diagram (Figure from Turkey Point Units 6 & 7 Site Certification Application) | |
ML16015A379 | 11 June 2009 | Official Exhibit - FPL-007-00-BD01 - Map of Turkey Point Property and Cooling Canal Flow Diagram (Figure from Turkey Point Units 6 & 7 Site Certification Application) | |
ML091600729 | 9 June 2009 | Acceptance Review for Mururoa V4F1 Supplied Air Suits | Mururoa |
TAC:ME1156 | 9 June 2009 | ||
ML091550769 | 4 June 2009 | Acceptance Review Regarding Adoption of TSTF-511, Rev. 0 (ME1177 and ME1178) | |
TAC:ME1232 | 3 June 2009 | ||
ML091500002 | 3 June 2009 | G20090270/EDATS: OEDO-2009-0286 & G20090279/EDATS: OEDO-2009-0314 - 2.206 - Florida Power & Light Company/Turkey Point | |
ML091460632 | 2 June 2009 | FEMA Letter Transmitting Acceptance Review Due Date for Turkey Point Cola | |
ML091530227 | 2 June 2009 | March 04, 2009, Generic Fundamentals Examination Section Region II, Participant Letter | Generic Fundamentals Examination |
L-2009-131, Units 1 and 2 - Official Service List Change | 28 May 2009 | Units 1 and 2 - Official Service List Change | |
ML091160002 | 27 May 2009 | Florida Power & Light Powerpoint Presentation Regarding AST Public Meeting on April 24, 2009 | |
ML091240377 | 27 May 2009 | Summary of April 24, 2009 - Category 1 Meeting with Florida Power & Light, Turkey Point, to Discuss Proposed Alternative Source Term License Amendment Request | |
L-2009-124, Submission of Annual Report to the International Atomic Energy Agency | 21 May 2009 | Submission of Annual Report to the International Atomic Energy Agency | |
ML091700743 | 16 May 2009 | Comment (35) of Coralie Carraway on PRM-72-6, Upgrade Interim Dry Cask Storage Code Requirements | |
L-2009-122, Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change | 14 May 2009 | Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change | |
ML091470288 | 14 May 2009 | Submittal of 2008 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML091320111 | 12 May 2009 | Meeting Summary, Category 3 Open House Annual Assessment Meeting - Turkey Point Nuclear Plant | Open House |
ML092860275 | 7 May 2009 | G20090107/EDATS: OEDO-2009-0091 - Thomas Saporito 2.206 May 7, 2009, Transcript Request for Enforcement Action and Confirmatory Order Against Florida Power and Light Company Related to 1/11/09 Petition | Boric Acid |
ML091390233 | 7 May 2009 | Transcript of 2.206 Petition on Florida Power and Light Company by Thomas Saporito, May 7, 2009, Pages 1-76 | Boric Acid |
L-2009-110, Submittal of Request for Minor Revision Notification of Wastewater Permit Number FL0001562 | 6 May 2009 | Submittal of Request for Minor Revision Notification of Wastewater Permit Number FL0001562 | |
L-2009-098, Units 1 and 2 - Official Service List Change | 1 May 2009 | Units 1 and 2 - Official Service List Change | |
IR 05000250/2009002 | 30 April 2009 | IR 05000250-09-002, 05000251-09-002 on 03/31/2009 for Turkey Point | Boric Acid Packing leak Non-Destructive Examination Fire Barrier Fire impairment Temporary Modification Operability Determination Maintenance Rule Program Liquid penetrant Continuous fire watch Unidentified leakage |
ML091180301 | 29 April 2009 | Units 1 and 2 - Request for Additional Information (RAI) Regarding Revisions to Emergency Action Levels | |
L-2009-073, Submittal of Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2008 Annual Report | 28 April 2009 | Submittal of Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 2008 Annual Report | |
ML091110032 | 28 April 2009 | Thomas Saporito Response Letter - 2.206 | |
L-2009-104, Florida Power and Light Company'S Request for Information Regarding Mr. Thomas Saporito'S January 11, 2009, 20206 - Retention Bonus Agreement | 28 April 2009 | Florida Power and Light Company'S Request for Information Regarding Mr. Thomas Saporito'S January 11, 2009, 20206 - Retention Bonus Agreement |