ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Turkey Point Exam Level (circle one): RO Date of Examination: _-=2=/2=3,,-,/0:..::9,--_
Operating Test No.: _--=2""0"",09",--",,,3.><.0-,-1 __
Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
System / JPM Title a
Align RHR For Cold Leg Recirculation b
Restore Accumulator Pressure c
Place RHR In Service d
Manually Initiate Containment Spray e
Manually Synchronize Main Generator f
Respond to a L T 112 failure g
Respond toa CCW system leak h
Terminate a Waste Gas Release In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SR Respond to A TWS Locally Realign Opposite Units H k
E,D,R A,E,M and serve different safety functions; ed in the control room.
Criteria for RO / SRO-I / SRO-U 4-6 / 4-6 / 2-3
- 9/
- ::;8/:::;4
- 1/;
- :1/;::1
- 1/;
- :1/;::1
- 2/;
- :2/;::1
- 3 /
- ::; 3 / :::; 2 (randomly selected)
- 1/;
- :1/;::1 4 (SEC) 7 8
9 2
6
Facility:
Turkey Point Date of Examination:
Exam Level (circle one): SRO-I Operating Test No.: _--==
Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
System 1 JPM Title a
Align RHR For Cold Leg Recirculation b
Restore Accumulator Pressure c
Place RHR In Service d
Manually Initiate ontainment Spray e
N/A Respond to a L T 112 failure g
Respond to a CCW system leak h
Terminate a Waste Gas In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 k
A,E, D E,D,R A,E,M different and serve different safety functions; those tested in the control room.
Criteria for RO 1 SRO-I 1 SRO-U 4-6 1 4-6 1 2-3
~9/~8/~4
- 1/;
- :1/;::1
- 1/;
- :1/;::1
- 2/;
- :2/;::1
~ 3 1 ~ 3 1 ~ 2 (randomly selected)
- 1/;
- :1/;::1 3
4 (PRI) 5 N/A 7
8 9
2 6
(
Facility:
Turkey Point Date of Examination:
Exam Level (circle one): SRO-U Operating Test No.:
Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
System 1 JPM Title a
N/A b
Vent Accumulators c
N/A d
Manually Initiate Containment Spray e
N/A N/A g
Respond to a CCW system leak h
N/A k
(L)ow-P (N)ew or (
(P)revious (R)CA (S)imulator A,E,D E,D,R N/A different and serve different safety functions; those tested in the control room.
Criteria for RO 1 SRO-I 1 SRO-U 4-6/4-6 I 2-3
- 9/
- :;8/::;4
- 1/;
- ::1/;:::1
- 1/;
- ::1/;:::1
- 2/;
- ::2/;:::1
- 3 1
- :; 3 1 ::; 2 (randomly selected)
- 1/;
- ::1/;:::1 3
N/A 5
N/A N/A 8
N/A 2
N/A
(
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet Turkey Point Task No:
Align Safety Injection For Cold Leg Recirc JPM No:
KIA
Reference:
006 A4.07 RO 4.4 SRO 4.4 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 01200021500 JPMA Simulated Performance X
Actual Performance
~------------------
--~~----~
Classroom Simulator X Initial Conditions:
A LOCA is in progress on Unit 3 RHR is aligned to take suction from containment' 3A HHSI pump is operating taking suction from th 38 HHSI pump bearing has failed and has been pi 4A and 48 HHSI pumps suction aligned to the Unit Task Standard:
Core injection flow has geen~
(~F
(~';-'
Required Materials:
>~~
\\.
, '<:',~,
"\\"
3-EOP-ES-1.~"Tran5ter to C'O
,/,"""%'"
.3 Transfer to Cold Leg Recirculation NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 10 Form ES-C-1 Initiating Cue:
(
You have been directed to transfer to Cold Leg Recirculation using 3-EOP-ES-1.3, Transfer Recirculation, starting at step 19.
Time Critical Task: Yes Validation Time:
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 10 SIMULATOR SETUP Reset to IC # 22 Load Lesson Open lesson, JPM A Execute lesson
- . Trigger "Parent" step Trigger "38 HHSI PUMP TRIP" OR go to Schematic, Safety System, Safety pump icon. Select SI pump 3 8 under table "0". Select TVMHP838 and set Place 38 HHSI pump control switch in the "Stop" and Pull-To-Lock Ensure Simulator Operator Checklist is complete PLACE SIMULATOR IN RUN ACKNOWLEDGE ALARMS FREEZE SIMULATOR.
Provide a copy of 3-EOP-ES-1.3, Transfer to Cold Leg
- 18. On step 18, circle and draw a line to the RNO column.
Save as a temporary IC, if repeat runs of JPM will be desired.
PLACE SIMULATOR IN RUN After JPM is complete, delete the tem temporary IC has been deleted.
Form ES-C-1 I as complete through step NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
Standard:
Comment STEP 2
~
Standard:
Page 4 of 10 Denote critical steps with a check mark( I)
Obtain required materials.
Examinee obtains a copy of the required procedure Provide the Examinee with a copy 3-EOP-E Recirculation marked up as complete th Isolate RHR Cold Leg (3-EOP-ES-1.3 Step Start Time position in the CLOSED position Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 3
Standard:
Comment Page 5 of 10 CHECK RWST LEVEL - LESS THAN 60,000 GAL.
(3-EOP-ES-1.3 Step 20)
Examinee observes LT-3-6583A RWST LEVEL less than 60, Procedure Note:
Note Steps 20 through 24 should be rO\\1I10\\."",.,
timely transition to cold leg recirculation STEP 4
~
Standard:
Comment PLACE CONTAINMENT SPRAY PUMPS IN PU Examinee places the 3A handswitches in PULL-p be interrupted for more than 2 Steps 21 through 24.
Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
~
(
Standard:
Comment NOTE:
NOTE:
STEP 6
~
NOTE:
Page 6 of 10 PLACE BOTH UNIT 3 HIGH HEAD SI PUMPS IN PULL-TO-LOCK (3-EOP-ES-1.3 Step 21)
Examinee places the 3A High Head SI Pump handswitch in LOCK The 3B High Head SI Pump ha PULL-TO-LOCK during the setup.
Ensure failure of 3A HHSI pump breaker "AS IS" Control switch has been placed in PTL position.
CLOSE RWST (3-EOP-ES-1.3 Step 22) in the CLOSED position or MOV-3-864B must be closed prior to examinee should have both valves stroking closed at the same Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 7
~
Standard:
Comment NOTE:
NOTE:
NOTE:
Page 7 of 10 Align RHR Pump Discharge To High-Head SI Pump Suction.
(3-EOP-ES-1.3 Step 23)
- 1) Examinee verifies MOV-3-864A and MOV-3-864B CLOSE observing the position indicating lights above the valve handswitches.
- 2) Examinee places MOV-3-863A handswitch in the AND
- 3) Examinee places MOV-3-864B n!:lr~/"'I~\\AJ Only Standards 2 & 3 I to this element.
MOV-3-864A a
'ous step.
Form ES-C-1 I NUREG 1021 Rev 9 Appendix C
Appendix C STEP 8
Standard:
Comment NOTE:
NOTE:
STEP 9
~
Page 8 of 10 START ONE HHSI PUMP Aligned to Unit 3 (3-EOP-ES-1.3 Step 24)
Examinee attempts to start the 3A HHSI pump by placing th handswitch in START.
Procedure Caution:
If the operating High-Head SI Pump tri
, the Pump is required to be manually started.
The 3A HHSI pump will NOT start due to an in",crTcn The 38 HHSI pump PTL.
in the OPEN position in the OPEN position task is complete when the Examinee establishes core flow by ning 3-MOV-744A and 7448 Form ES-C-1 SAT UNSAT STOP Stop Time ___ _
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 9 of 10 Form ES-C-1 Verification of Completion Job Performance Measure No.
JPM A
~~~--------------------------------~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Examiner's signature and date: ________________________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
A LOCA is in progress on Unit 3 RHR is aligned to take suction from containment sump 3A HHSI pump is operating taking suction from the Unit 3 RWST 38 HHSI pump bearing has failed and has been placed in PTL.
4A and 48 HHSI pumps suction aligned to the Unit 4 RWST
!NITIA TlNG CUE:
You have been directed to transfer to Cold Leg Recirculation Recirculation, starting at step 19.
Acknowledge to the examiner when you are ready HAND THIS PAPER BACK T Y
EVA SATISFACTORILY COMPLETED THE NUREG 1021 Rev 9 Appendix C
(
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet
_T-'--ur_k--'-e ___ y_P-'o __ in--'..:t'---______ Task No:
Restore Accumulator Pressure JPM No:
KIA
Reference:
006A1.13 RO 3.5 SRO 3.7 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
1064005100 JPMB Simulated Performance X
Actual Performance Classroom Simulator X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss complete the task successfully, the objective for this job perfor Initial Conditions:
Unit 3 is in MODE 1 Annunciator H 2/3, ACCUM 8 HI/LO PRESS is\\O The 38 Accumulator pressure is greater than 66;5 Containment is closed with no personnel in cont' *nr1'1 *. ent.
Task Standard:
The 38 Accumulator 625 and 665 psig Required Materials:
3-0P-064 Safety Form ES-C-1 NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 8 Initiating Cue:
You have been directed to vent the 38 accumulator to the normal operating band (625 using 3-0P-064 Safety Injection Accumulators, section 7.5 and clear Annunciator H applicable prerequisites as listed in 3-0P-064 Safety Injection Accumulators secti satisfied. Another operator has addressed the alarm response for Annunciator H HI/LO PRESS.
Time Critical Task: No Validation Time:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS Form ES-C-1 NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 8 SIMULATOR SETUP Reset to IC # 1 Ensure Simulator Operator Checklist is complete PLACE SIMULATOR IN RUN
- . Open Lesson JPM B Execute lesson Trigger "Parent" step Trigger PCV-846 leakage Open CV-3-855 & CV-3-853B Allow 3B accumulator pressure to increase until annunciator H Close CV-3-853B & CV-3-855 Delete PCV-846 leakage from the summary.
Verify the accumulator level is still in the green band.
ACKNOWLEDGE ALARMS FREEZE SIMULATOR.
Provide a copy of 3-0P-064 Safety Injection Accumulators, Save as a temporary IC, if repeat runs of JPM will be desired.
PLACE SIMULATOR IN RUN After JPM is complete, delete the temporary IC has been deleted.
Form ES-C-1 I bin, If a NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
Standard:
Comment STEP 2
Standard:
Page 4 of 8 Denote critical steps with a check mark( I)
Obtain a copy of 3-0P-064 Safety Injection Accumulators Copy of 3-0P-064 is obtained.
Provide a marked up copy of 3-0P-064..... "'T*CT\\I section 7.5.
Verify at least one n (3-0P-064 Step minee verifies ALL accumulator vent valves are closed by g the green closed indicating lights above the control switches
-853A, B, & C) on VP B are ON.
Form ES-C-1 SAT UNSAT SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 4
Standard:
Comment NOTE:
STEP 4
Page 5 of 8 Open CV-8538, 38 accumulator vent valve.
(3-0P-064 Step 7.5.2.2.b)
Examinee places the handswitch for CV-8538 to OPEN.
Procedure Caution Technical Specifications require accu maintained in the range of 600 to 675 psig.
During outages and with personnel inside contain taken when venting accumulators. Depending on co integrity, containment normal containment service, nitrogen slowly.
Only one vent with RCS pressure greate Form ES-C-1 SAT UNSAT ulator by rotating the potentiometer for NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
Standard:
Comment NOTE:
STEP 6
Terminating Cue:
Page 6 of 8 WHEN accumulator pressure decreases to zero (less than 10 psig)
OR to pressure directed by procedure, THEN close Accum Vent, HIC-3-936.
(3-0P-064 Step 7.5.2.5)
Examinee closes the Accumulator Vent by rotating HIC-3-936 counterclockwise.
AND 3B Accumulator pressure is established from AND.
Annunciator window H 2/3 is OFF The examinee was from 625 to 665 Close CV-853B, 3B accum CV-853B to CLOSE.
task is complete when the Examinee closes CV-853B.
Form ES-C-1 SAT UNSAT STOP Stop Time ___ _
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 7 of 8 Form ES-C-1 Verification of Completion Job Performance Measure No.
JPM B
~~~----------------------------------
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
(
Exam iner's sig nature and date: __________________________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will satisfied.
INITIAL CONDITIONS:
Unit 3 is in MODE 1 Annunciator H 2/3, ACCUM 8 HIILO PRESS is ON The 38 Accumulator pressure is greater than 665 psig.
Containment is closed with no personnel in containment.
!NITIA TlNG CUE:
You have been directed to vent the 38 accumulator to the n using 3-0P-064 Safety Injection Accumulators, section 7.5 prerequisites as listed in 3-0P-064 Safety Injection Another operator has addressed the alarm response Acknowledge to the examiner when you are ready to beg HAND THIS PAPER BACK TO YOUR EVALU SATISFACTORILY COMPLETED TH NUREG 1021 Rev 9 Appendix C
(
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet
_T_u_r_k...'-ecLy_P_o_in_t _______ Task No:
KIA
Reference:
005 A4.01 RO 3.6 SRO 3.4 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 01050012100 JPMC Simulated Performance X
Actual Performance Classroom Simulator X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss complete the task successfully, the objective for this job perfor Initial Conditions:
U-3 Mode 4 RCS Temperature is 345 deg RCS Pressure is 400 psig RCP Band C are in service No equipment is OOS 3-0P-050, Residual Heat Remo)?,al"~yst~m is in have been complete.
/"\\
Task Standard:
eft
\\
~~f RHR has been placed"'j'(l
\\perature has been demonstrated
/
emo\\~1 SJ(~tem
~~
'\\
3-0P\\050;\\,Residual Heat R'i3m~val System
-~_,
0,
~:
l
,,fl'-
i
"""VI/
NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 9 Form ES-C-1 Initiating Cue:
You have been directed to place RHR in service using 3-0P-050, Residual Heat Re starting at step 5.2.2.21.
You will continue through step 5.2.2.26 of 3-0P-050, Residual Heat Removal cooldown of the RCS.
The Unit Supervisor has directed you to initiate RHR using the 3A RHR pum
- . A Prestart check has been performed on the 3A RHR pump.
All pre-job briefings have already been performed.
Time Critical Task: No Validation Time:
20 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of9 SIMULATOR SETUP Reset to IC # 14 Complete section 5.1 and 5.2 up through step 5.2.2.20 of 3-0P-050 OR Load IC 191 from the memory stick Ensure Simulator Operator Checklist is complete Place the following cold shutdown placards on VPB
- . 3-MOV-865 A, B, & C to yellow 3-MOV-862 to white 3-MOV-750 and 751 to white 3-MOV-843 A and B to yellow 3-MOV-869 to yellow 3-MOV-866 A and B to yellow PLACE SIMULATOR IN RUN ACKNOWLEDGE ALARMS LET STABILIZE AND FREEZE SIMULATOR Save as a temporary IC, if repeat runs of JPM will be Provide a copy of 3-0P-050, Residual Heat Removal System PLACE SIMULATOR IN RUN, prior to student entering the sim After JPM is complete, delete the temporary IC, if used. Delete the temporary IC has been deleted Form ES-C-1 I
...-""r\\lr,,,, bin, If a NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
Standard:
Comment STEP 2
.J
(
Standard:
Page 4 of9 Denote critical steps with a check mark(.J)
Obtain required materials.
Examinee obtains a" copy of the required procedure.
Provide the Examinee with a copy of 3-0 System marked up through step 5.2.2.20 (3-0P-050 step Start Time RHR loop needs to be initiated slowly to avoid thermal
. A warm up period at low flow is required before full flow is initiated h the loop. The Pump Outlet Temperatures should be mately RCS temp prior to starting an RHR Pump.
CT<::>nrlnn an RHR Pump with RHR boron concentration less than RCS boron concentration may cause a small increase in source range counts.
Source Range channels need to be closely monitored during RHR Pump start and flow setting for indication of an uncontrolled or unexplained increase in source range counts and 3-0NOP-046.1, EMERGENCY BORATION, implemented, if necessary.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 3
if Standard:
Comment STEP 4
Standard:
Comment Page 5 of9 Open, RHR Hx By-pass Flow Valve, FCV-3-605 to 5 percent demand (3-0P-050 step 5.2.2.22)
The examinee places the controller for the RHR Hx By-pass Valve, FCV-3-605 to an approximate 5 percent OPEN de Monitor the RHR Temperature Reco until the RHR temperature stabilizes.
(3-0P-050 step 5.2.2.23)
Examinee observes th directs local ind stabilizes.
If asked, provide the fol stabilized."
Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
./
Standard:
Comment*
NOTE:
STEP 6
./
Page 6 of 9 Adjust RHR Hx Bypass Flow Valve, FCV-3-605, to maintain between 3500 and 3750 gpm RHR flow AND clear RHR HI/LO HX FLOW annunciator, H 612.
(3-0P-050 step 5.2.2.24)
Examinee adjusts the HIC-3-605, controller for RHR Hx By Valve, FCV-3-605 to achieve the following:
RHR flow between 3500 and 3750 gpm AND RHR HI/LO HX FLOW annunciator, H Procedure Note:
for RHR Hx Bypass Flow FC-Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C Page 7 of 9
(
STEP 7
Throttle open RHR Hx Outlet Flow Valve, HCV-3-758, to commence RCS cooldown.
(
Standard:
Comment (3-0P-050 step 5.2.2.26)
Examinee adjusts HIC-3-758 to achieve a throttled condition Hx Outlet Flow Valve, HCV-3-758 AND Examinee commences RCS cooldown.
Terminating The task is complete when the Examinee retu Cue:
the examiner.
Form ES-C-1 I STOP NUREG 1021 Rev 9 Appendix C
Appendix C Page 8 of9 Form ES-C-1 Verification of Completion Job Performance Measure No.
JPM C
~--------------------------------~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Examiner's signature and date: __________________________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will satisfied.
INITIAL CONDITIONS:
U-3 is in Mode 4 RCS Temperature is 345 deg RCS Pressure is 400 psig RCP Band C are in service No equipment is OOS 3-0P-050, Residual Heat Remov'al System is in progress, all ste have been complete.
INITIA rING CUE:
You have been directed to place RHR in service us' starting at step 5.2.2.21.
You will continue through step 5.2.2.26 of 3-0P-050, Res cooldown of the RCS.
The Unit Supervisor has directed you to initiate RHR using the A Prestart check has been performed on the 3A RHR pump.
All pre-job briefings have already ed.
Acknowledge to the examiner HAND THIS P ER BAC SATISFACTORILY I System and initiate a R WHEN YOU HAVE IGNED TASK.
NUREG 1021 Rev 9 Appendix C
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet Turkey Point Task No:
Manually Initiate Containment Spray JPM No:
KIA
Reference:
026 A4.01 RO 4.5 SRO 4.3 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 01200053500 JPMD Simulated Performance X
Actual Performance Classroom Simulator X Read to the examinee:
I will explain the initial conditions, which steps to simUlate or discus,an complete the task successfully, the objective for this job perfor Initial Conditions:
The Unit 3 Reactor has tripped due to a LOCA.
Safety Injection has occurred Containment Isolation Phase A has occurred Task Standard:
The examinee manually initia s AND The examinee manuall Required Materials:
NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 8 Form ES-C-1 Initiating Cue:
You have been directed to complete 3-EOP-EO, Reactor Trip or Safety Injection Attach starting at step 15.
Time Critical Task: No Validation Time:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 8 SIMULATOR SETUP Reset to IC # 1 Load Lesson Open lesson, JPM D Execute lesson Trigger "Parent" step Trigger step "Containment Spray Fails to Actuate". (TFL3S1 and TFL3S2, Trigger step "Phase B Fails to Actuate". (TFL3B1 and 3B11, L3-CIB-1 and PLACE SIMULATOR IN RUN Trigger step "B" Cold Leg Break. (TVHHCLB 1)
Stop all Reactor Coolant Pumps.
Ensure 3-EOP-EO, Reactor Trip or Safety Injection Attachment Ensure Containment Pressure is greater that 20 psig.
ACKNOWLEDGE ALARMS FREEZE SIMULATOR.
Ensure Simulator Operator Checklist is complete Provide a copy of 3-EOP-EO, Reactor Trip or Safety Injection through step 14.
Save as a temporary IC, if repeat runs of JPM will be desired.
PLACE SIMULATOR IN RUN After JPM is complete, delete the temporary IC has been deleted.
Form ES-C-1 I NUREG 1021 Rev 9 Appendix C
Appendix C Page 4 of 8 Form ES-C-1 Denote critical steps with a check mark( I)
Start Time
(,------~--------------------------------~
STEP 1
Standard:
Comment STEP 2
Standard:
Obtain required materials.
Examinee obtains a copy of the required procedure.
Provide the Examinee with a copy 3-EOP Injection Attachment 3 marked up as Monitor Containment Required.
(3-EOP-EO.... TT::;;!r-"""
SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 3
Standard:
Comment NOTE:
STEP 4
Standard:
Comment N
Page 5 of 8 Manually initiate Containment Spray.
(3-EOP-EO Attachment 3 Step 15 RNO a.1)
Examinee initiates one complete Train of Containment Spray, minimum by manually starting a Containment Spray pump opening the corresponding Containment Spray Isolation The station expects the examinee to man Spray pumps and to manually open valves.
Manually initiate Containment Isolation Phase B.
Examinee attempts to ma by depressing both Contai ation Phase B hbuttons.
led as a part of the setup.
Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
Standard:
Comment NOTE:
STEP 6
Standard:
NOTE:
Page 6 of 8 Verify Containment Isolation Phase B valve white lights on VPB - ALL BRIGHT.
(3-EOP-EO Attachment 3 Step 15 RNO a.3)
Examinee observes Containment Isolation Phase B valve wh on VPB are OFF.
Containment Isolation Phase B is disab Containment Isolation Phase B valve illuminate BRIGHT.
Manually isolate affected containment penetration.
Examinee manually places valves to CLOSE:*
the following st manually close all three MOV's in order to meet task is complete when the Examinee establishes at least one in of Containment Spray and manually closes MOV-3-716B OV-3-626 and MOV-3-730.
Stop Time Form ES-C-1 SAT UNSAT STOP NUREG 1021 Rev 9 Appendix C
I Appendix C Page 7 of 8 Form ES-C-1 Verification of Completion Job Performance Measure No.
JPM D
~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
ry /U nsatisfactory Examiner's signature and date: ________________________________ _
NUREG 1021 Rev 9 Appendix C
c JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
The Unit 3 Reactor has tripped due to a LOCA inside of Containment.
Safety Injection has occurred Containment Isolation Phase A has occurred INITIA TlNG CUE:
You have been directed to complete 3-EOP-EO, Reactor Trip or at step 15.
Acknowledge to the examiner when you are ready to NUREG 1021 Rev 9 Appendix C
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet
_T_u_r_k_e-"--y_P_o __ in-t------- Task No:
Manually Synchronize Main
_G-=-=.e:...:..n-=-er:....:a.:..:.to=-:r ________ JPM No:
KIA
Reference:
045 A4.02 RO 2.7 SRO 2.6 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 01002002100 JPM E Simulated Performance X
Actual Performance
~----------
Classroom Simulator X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discu complete the task successfully, the objective for this job perfo Initial Conditions:
Unit 3 is in MODE 1, 5% power Main turbine speed is approximately 1800 rpm The voltage regulator is in service The Shift Manager has given to perfor a m ual synchronization of the main generator Task Standard:
The main generator s
main generator load is raised to at least 10 with no reverse power t.
TO POWER OPERATION NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 9 Form ES-C-1 Initiating Cue:
You have been directed to manually synchronize the generator using 3-GOP-301 HOT ST POWER OPERATION, step 5.54 and raise load to 10 MW.
All prerequisites and job briefings have already been completed.
Time Critical Task: No Validation Time:
20 minutes HAND" JPM BRIEFING SHEET TO EXAMINEE AT THIS NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 9 Saved to memory stick IC tI',93 If IC 193 is NOT available perform the following Reset to IC # 56 Ensure the Main Turbine speed is approximately 1820 rpm Place the Gen Synchronizing East Bus Control in the OFF position.
Go to NO-OP, freeze the simulator for Steam Generator and Blowdown Ensure Simulator Operator Checklist is complete PLACE SIMULATOR IN RUN Ensure 3-GOP-301 HOT STANDBY TO POWER OPERATION steps 5 ACKNOWLEDGE ALARMS Adjust turbine speed until the synchroscope is moving slowly in FREEZE SIMULATOR.
Provide a copy of 3-GOP-301 HOT STANDBY TO POWER through step 5.52. (step 5.53 is N/A).
Save as a temporary IC, if repeat runs of JPM will be PLACE SIMULATOR IN RUN After JPM is complete, delete the temporary IC, if used. De temporary IC has been deleted.
Form ES-C-1 I NUREG 1021 Rev 9 Appendix C
Appendix C Page 4 of 9 Form ES-C-1 Denote critical steps with a check mark( /)
STEP 1
Standard:
Cue Comment NOTE:
NOTE:
NOTE:
STEP Obtain required materials.
Examinee obtains a copy of the required procedure.
Provide the Examinee with a copy 3-GO POWER OPERATION marked up as Procedure Note:
The Manual Mode is only to Manager.
"to allow the Start Time n switch for the east generator GCB in the generator synchronizing east bus control switch to SAT UNSAT NUREG 1021 Rev 9 Appendix C
, Appendix C STEP 3
Standard:
Comment STEP 4
-.j Standard:
Comment STEP Comment Page 5 of 9 Verify the Inadvertent Protection Scheme Armed amber light above the synchroscope is LIT.
(3-GOP-301 step 5.54.2)
Examinee observes the "Inadvertent protection Scheme Armed" light above the synchroscope is LIT.
Ensure synchroscope is rotating slowly i (3-GOP-301 step 5.54.3) adjusts turbine speed us UJclnro'scc)Oe to attain slow places and h the generator East GCB handswitch to N the synchroscope is between the 11 o'clock and 12 on the synchroscope until either the GCB is closed or the reached.
o NOT hold GCB control switch in CLOSED position beyond the 12 o'clock position.
Form ES-C-1 UNSAT SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 6
Standard:
Comment NOTE:
Page 6 of 9 Form ES-C-1 Ensure East GCB closes.
(3-GOP-301 step 5.54.5.1)
Examinee observes the East Bus Breaker red indicating light Procedure Note:
If East bus breaker fails to close, the Operations needs to be notified prior to attempti Mid Bus Breaker, since realignment of the ~\\AlITf'n\\l!:1lr (The Systems Operator/Power Coordinator evaluates should be isolated the plant to 2.3.1]
NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 7
-V Standard:
NOTE:
Comment Page 7 of 9 Raise Main Generator load to approximately 10 MW.
(3-GOP-301 step 5.54.5.2)
Examinee raises Main Generator load by placing the Generator Speed Changer Control to RAISE to approximately 10 MW AND A reverse power trip does NOT occur Procedure Note:
If the generator is motored at 2 MW or power relay will initiate generator I Terminating When the Exa Cue:
the examinee the task Form ES-C-1 I STOP Stop Time ----
NUREG 1021 Rev 9 Appendix C
(
Appendix C Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
JPM E ry/Unsatisfactory Page 80f9 Form ES-C-1 Examiner's signature and date: _________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Unit 3 is in MODE 1, 5% power Main turbine speed is approximately 1800 rpm The voltage regulator is in service The Shift Manager has given authorization to perform a manual INITIA TlNG CUE:
You have been directed to manually synchronize the g
. POWER OPERATION, step 5.54.
All prerequisites and job briefings have already been compl Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER B SATISFACTO NUREG 1021 Rev 9 Appendix C
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet
_T_u,,-,-r-,-k--=-e....... y _P-'-o_inc...:.t_______ Task No:
Respond to a L T-112 failure JPM No:
KJA
Reference:
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 01046045300 JPM.F Simulated Performance X
Actual Performance
-~~~-~~~----
Classroom Simulator X Initial Conditions:
Unit 3 is in MODE 1, 100% power No equipment is out of service Task Standard:
C~
- Letdown is restored to the VCT b:J ___ ~.
Required Materials:
3-ARP-097CR, Contr 3-0NOP-046.4 Malfu l
NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 10 Form ES-C-1 Initiating Cue:
You have been directed to respond to plant conditions.
Time Critical Task: No Validation Time:
20 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 10 SIMULATOR SETUP Reset to IC # 1 Load Lesson Open & execute lesson JPM F Verify lesson step "LC-112 stays in AUTO" triggers. (1 DB1 LAUU)
- . Ensure Simulator Operator Checklist is complete PLACE SIMULATOR IN RUN ACKNOWLEDGE ALARMS LET STABILIZE AND FREEZE SIMULATOR Save as a temporary IC, if repeat runs of JPM will be desired.
PLACE SIMULATOR IN RUN, prior to student entering the sim When directed by the examiner, trigger lesson step "LT-112 After JPM is complete, delete the temporary IC, if used.
temporary IC has been deleted Form ES-C-1 I NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
1 Standard:
Comment NOTE:
NOTE NOTE STEP Page 4 of 10 Denote critical steps with a check mark( I)
Lowering VCT level as indicated on U-115 due to L T -112 failing high.
Examinee observes lowering VCT level on U-115 with no charging or letdown flows. Examinee observes LCV-11 on VP A.
Direct the facility booth operator to trigger HIGH" when ready The instrument malfunction results in Letdown being holdup system, away resulting in an AUTO VCT.
No alarms occur only alarms are those The examinee must eventual 3-0NOP-046.4, Of Boron Concentration Control to 3-0NOP-046.4, Malfunction Of Boron System.
v<>n"lln<:,c enters 3-0NOP-046.4 Malfunction Of Boron Concentration Control System due to an unexplained deviation of VCT level indication between U-3-115 and U-3-112.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 3
Standard:
Comment NOTE STEP 4
Standard:
Comment NOTE:
Page 5 of 10 Check boric acid or primary water flow rates-abnormal.
(3-0NOP-046.4 Step 1)
Examinee observes boric acid and primary flowrates normal by the indications on FR-3-113 and transitions to RNO column a step 28.
FR-3-113 is located on the Operator Makeup.
Check For VCT Level Transmitter, L T 115 Failing (3-0NOP-046.4 Step 28)
Examinee observes L/-3-1 then to step 31 column and cated on VPA, left side. All VCT 112 are available on ERDADS.
15 share a common wet variable leg and a common
. A false high level will be produced if the common dry ils.
28 through 38 assume stable charging and letdown flow; therefore, ient could mask the symptoms being used to determine which transmitter has failed.
Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
Standard:
Comment STEP 6
Standard:
Comment Page 6 of 10 Check For VCT Level Transmitter, L T-3-115 Failing Or Failed Low.
(3-0NOP-046.4 Step 31)
Examinee observes LT-3-115 indicates normal and transitions column and then to step 34 Check for L T 112 failing or failed high U-3-112 abnormally high OR U-3-115 decreasing due makeup actuated.
(3-0NOP-046.4 following:
diverting or increasing after auto
.,"r.:'<>c:"~rt rate of makeup to the VCT.
the following cue from the SNPO "U-112 indicates r may dispatch field operator to check L T -112 indication. The
,,,,,,,',n" of LT-112 is available on ERDADS.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C
(
STEP 7
Standard:
Comment NOTE:
NOTE NOTE Page 7 of 10 Place LC-3-112, VCT Level Controller Auto-Manual Station, In MANUAL.
(3-0NOP-046.4 Step 35)
Examinee depresses the "MANUAL" pushbutton on LC-3-112 Controller.
LC-3-112 VCT Level Controller MANUAL illuminate but will de-energize when the the AUTO light will come back on. The Auto-Manual Station will NOT shift to MANUAL inserted malfunction.
Procedure CAUTION With no operator letdown flow will Failure of LT-3-112 high will LEVEL if actual level reaches 12
, VCT level will continue to cycle perpetually Makeup setpoints. The station anticipates
,rr"::TI\\/C to restore Letdown to the VCT and to proceed Form ES-C-1 I NUREG 1021 Rev 9 Appendix C
Appendix C STEP 8
Standard:
Comment NOTE:
NOTE STEP 9
I Standard:
Page 8 of 10 Direct Flow To The VCT By Manually Adjusting VCT Level Controller, LC-3-112, To Adjust LCV-3-11SA Position.
(3-0NOP-046.4 Step 36)
Examinee attempts to close LCV-3-11SA by adjusting the on LC-3-112.
The LC-3-112, VCT Level Controller will 11SA.
Examinee proceeds to the RNO column step.
Place the LID D task is complete when the examinee restores Letdown to the Form ES-C-1 SAT UNSAT STOP Stop Time ___ _
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 9 of 10 Form ES-C-1 I Verification of Completion Job Performance Measure No.
JPM F
~~~--------------------------------~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
nsatisfactory Examiner's signature and date: _______________________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will satisfied.
INITIAL CONDITIONS:
Unit 3 is in MODE 1, 100% power No equipment is out of service INITIA TING CUE:
You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR SATISFACTORILY COMP NUREG 1021 Rev 9 Appendix C
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet
_T-'--u.::.:..:r-'-Ck-=-ey"--P-"-o-'-'-in.:c:.t _______ Task No:
_R.....;...;.;..es.::.Jp~o:......n.:...:.d_t:......o-"a~C~C_"_W"___"'_Le_=_a=k_'____ JPM No:
KIA
Reference:
008 A2.02 RO 3.2 SRO 3.5 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 01030008300 JPMG Simulated Performance X
Actual Performance Classroom Simulator X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss complete the task successfully, the objective for this job perfor Initial Conditions:
Unit 3 is in MODE 3 Shutdown Banks have been withdrawn No equipment is out of service Task Standard:
The Unit 3 Reactor is triJ:2 AND ooling Water Malfunction NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 12 Initiating Cue:
You have been directed to respond to plant conditions.
Time Critical Task: No Validation Time:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Form ES-C-1 NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC # 8 Load Lesson Open lesson, JPM G Execute lesson Trigger "Parent" step Ensure Simulator Operator Checklist is complete PLACE SIMULATOR IN RUN ACKNOWLEDGE ALARMS LET STABILIZE AND FREEZE SIMULATOR Save as a temporary IC, if repeat runs of JPM will be desired.
PLACE SIMULATOR IN RUN, prior to student entering the When directed by the examiner, trigger lesson step "C After JPM is complete, delete the temporary IC, if temporary IC has been deleted NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
Standard:
Comment STEP 2
Standard:
Page 4 of 12 Denote critical steps with a check mark( I)
CCW HEAD TANK HIILO LEVEL annunciator response, (3-ARP-097.CR Annunciator Window H 8/6 page 446)
Examinee responds to alarm using 3-ARP-097.CR Co Annunciator Response Verify alarm by 1""<:.1"""
(VPB) indication, LI-3-613A Head Tank Level Indication, LI-3-614A will be the first alarm Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 3
Standard:
Comment NOTE:
NOTE:
STEP 4
Comment Page 5 of 12 IF low level, THEN open fill valve, MOV-3-832, and restore level to normal (10% to 85% in the CCW Head Tank for normal CCW System requirements. )
(3-ARP-097.CR Annunciator Window H 8/6 page 446 step 3.a)
Examinee places the handswitch for CCW fill valve, MOV OPEN.
If asked provide the following cue, "Understand a WATER STANDBY PUMP RUNNING is av,",a,..T.
Alarm I 5/6, PRI WATER STANDBY PUMP RUNN expected to come on when the Examinee opens M The leak is of s decrease.
page 446 step 3. b) look for the source of CCW the following cue, "SNPO acknowledges to look for kage."
Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
./
Standard:
Comment STEP 6
Standard:
Comment NOTE:
Page 6 of 12 IF CCW Head Tank level cannot be maintained, THEN refer to 3-ONOP-030, Component Cooling Water.
(3-ARP-097.CR Annunciator Window H 8/6 page 446 step 3.c)
Examinee transitions to 3-0NOP-030, Component Cooling Verify Power To 4KV Bus 3D (3-0NOP-030 step 1)
Examinee verifies supply breakers Bus 3D available by 0 CLOSED.
hout this procedure.
page of 3-0NOP-030, lidation showed actions contained dition to those contained within the of no direct consequence to this task.
pply breakers are located on VPA.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 7
Standard:
Comment STEP 8
Standard:
Comment NOTE:
Page 7 of 12 Verify Component Cooling Water pumps in service.
(3-0NOP-030 step 2)
Examinee verifies Component Cooling Water pumps are in se observing "8":CCW pump amps and pump breaker CLOSE indication.
Verify Flow In 80th Component Cool (3-0NOP-030 step 3)
Examinee verifies F NORMAL by 0 Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 9
.j Standard:
Comment NOTE:
NOTE:
Page 8 of 12 Verify Component Cooling Water Surge Tank Level Being Maintained greater than 25%
AND Stable or increasing.
(3-0NOP-030 step 4.a)
Examinee verifies Component Cooling Water Surge DECREASING by CCW Head Tank Level by 0 If asked provide the following cue,"SNPO discharge header of the pumps. SNPO will attem but it will take an additional 5 minutes to enter the a so".
Component Cool VP B Decreasing level requires surge tank divider plate is level.
3, and CCW System level is NOT maintained Tank, restore CCW System level to be within nk within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
13A and U-3-614A are NOT overlapping (i.e., U-3-614A will go cale low before U-3-613A comes off its high peg with decreasing leak is of such magnitude that CCW Head Tank level continues to decrease.
Form ES-C-1 NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 10 Standard:
Comment NOTE:
Page 9 of 12 Open Component Cooling Water Surge Tank Makeup, MOV-3-832 as necessary to add makeup.
(3-0NOP-030 step 4 RNO 1)
Examinee places the handswitch for CCW fill valve, M OPEN.
Direction to open Component Cooling MOV-3-832 was provided in the alarm be opened.
Form ES-C-1 I NUREG 1021 Rev 9 Appendix C
Appendix C STEP 11 I
Standard:
Comment NOTE:
Page 10 of 12 IF Component Cooling Water Surge Tank Level can NOT be maintained, THEN perform the following:
Trip the reactor.
Stop all RCPs.
Perform 3-EOP-E-0, REACTOR TRIP OR SAFETY INJE continuing with this procedure.
(3-0NOP-030 step 4 RNO 2)
Examinee performs the following:
Places the Reactor Trip switch to TRIP.
AND Places the handswitches for all RCPs to STOP.
following of to 3-EOP-E-0, plete."
Component Cooling Water
, REACTOR TRIP OR be measured within this task is complete when the Examinee trips the Reactor and the Reactor Coolant pumps.
Stop Time Form ES-C-1 STOP NUREG 1021 Rev 9 Appendix C
I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.
JPM G
~~~--------------------------------~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Examiner's signature and date: ________________________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will satisfied.
INITIAL CONDITIONS:
Unit 3 is in MODE 3
- . Shutdown Banks have been withdrawn No equipment is out of service
!NITIA TlNG CUE:
You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to NUREG 1021 Rev 9 Appendix C
(
Appendix C Facility:
Task
Title:
KIA
Reference:
Examinee:
Facility Evaluator:
Method of testing:
Job Performance Measure Worksheet
_T_ur_k_e.Ly_P_o_in_t _______ Task No:
Terminate a Waste Gas Release JPM No:
071 A4.03 RO 3.9 SRO 3.8 NRC Examiner:
Date:
1061050300 JPM H Simulated Performance X
Actual Performance Classroom Simulator X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discus complete the task successfully, the objective for this job perfor Initial Conditions:
Unit 3 is in MODE 1 1 00% power
'. ;f" No equipment is out of service.
\\,
The SNPO is preparing to initiate a "8" Waste Ga~r*l'lfl;;,'::IC::'&I'i.J System Controlled Radioactive Gas Release step j\\1.
Task Standard:
_j,;:-.-4-::'<<"'-"'"'
'",~"
//..
\\.\\
\\,
The "8" Waste Gas Decay ]:.afnkffelease"\\ loqally isolat
/,'
?
y,
(
/ij//'
iii'
<i"
,Y j
/"
. \\\\~.
=<-'0 1
0-OP-061.14 Waste Gasl.'Sltspds,pl,$Ystem*CtlntroU~g R.. ~,
3-0NOP-067,.J~adi.Q.~.~tive Eftl~ent ~£iease'~"","
3-ARP-0""R, ContrOI*I~oom~nna.Qciator Response d,>>~"~;''';'~'::"''''''N-
. "-\\'-i':__
\\<:,
GeneraJl~ef~f~*~ces:*\\i... i.
'\\
</ <F,\\ \\\\
0-()ie-06.~.... 14 Waste Gas DiS.po~~1 System Controlled Radioactive Gas Release 3-0N~,P-0E).7, Radioactive Eiflu~nt Release 3-ARP~~7CR., Control Ro.lilm/Annunciator Response O-NCOP-OO~ P'r~paratio..Q;as Release Permits Required Materials:
Form ES-C-1 NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 14 Form ES-C-1 Initiating Cue:
You have been directed to monitor the Waste Gas release using 0-OP-061.14 Waste Gas System Controlled Radioactive Gas Release.
Time Critical Task: No Validation Time:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 14 Form ES-C-1 I SIMULATOR SETUP Reset to IC # 1 Open & execute lesson JPM H Execute lesson Execute lesson Trigger "Parent" step Trigger step "Override R-9" (actuates CMRI090 -.57791877)
Ensure Simulator Operator Checklist is complete PLACE SIMULATOR IN RUN ACKNOWLEDGE ALARMS LET STABILIZE AND FREEZE SIMULATOR Save as a temporary IC, if repeat runs of JPM will be desired.
PLACE SIMULATOR IN RUN, prior to student entering the simul When directed by the examiner, trigger lesson step" After JPM is complete, delete the temporary IC, if used. De temporary IC has been deleted NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
Standard:
Comment STEP 2
Page 4 of 14 Form ES-C-1 Denote critical steps with a check mark( I)
Obtain required materials.
Examinee obtains a copy of the required procedure.
Provide the Examinee with a copy of 0-0 System Controlled Radioactive Gas through step 7.1.2 8.
Provide the Examinee with a copy of the curre Monitor Gas SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 3
Standard:
Comment NOTE:
NOTE:
Page 5 of 14 SNPO initiates the gas release.
(0-OP-061.14 step 7.1.2 9.a)
Examinee continues to monitor the waste gas release by either:
PRMS R-14 Monitor Drawer ANDIOR ERDADS indication for RAD-6304 Provide the following cue from the SNP release."
After the waste gas release will approximately field of the i waste step "GR Re ease Setup" stabilized, direct the Booth Increase" (actuates TAAARI1 E+08)
Form ES-C-1 NUREG 1021 Rev 9 Appendix C
Appendix C STEP 4
Standard:
Page 6 of 14 WGDT Radiation Increase Above Limits.
(O-OP-061.14 step 7.1.2 9.c)
Examinee continues to monitor the waste gas release by 0 either:
PRMS R-14 MonitorDrawer AND/OR ERDADS indication for RAD-6304 And observes the increasing output The examinee may direct the SNPO to termi Form ES-C-1 Cue directed provide the following cue, "Understand, terminate the release."
Comment NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 5
Standard:
Comment STEP 6
Standard:
Comment NO Page 7 of 14 PRMS HI RADIATION Alarm, window H 1/4 for High R-14 Alarm.
(3-ARP-097.CR page 402 step 1)
Examinee verifies R-14 HIGH alarm by observing R-14 HIG LIGHT ON.
Verify automatic actions have (3-ARP-097.CR page 402 step 2)
Examinee responds to Transitions to to 3-0NOP-067, Radioactive nCl"finrlC directly to 3-0NOP-067, Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C c
STEP 7
Standard:
Comment NOTE:
STEP 8
Standard:
NOTE:
Page 8 of 14 Verify valid alarm on affected PRMS channel (3-ARP-097.CR page 402 step 3.a)
Examinee validates alarm by performing the following:
- 1. Check FAILITEST light not lit.
- 2. Push FAILITEST light pushbutton
- 3. Push SOURCE 'CHECK light pushbutton (meter due to the max output of R-14).
- 4. Push HIGH ALARM light pushbutton.
These actions are duplicated in to 3-0NOP-067, Release step 2.
to verify RCV-014 CLOSED, if
, "The loader signal for RCV-014 has 4 is still OPEN."
act' are duplicated in 3-0NOP-067, Radioactive Effluent step 42 and Foldout Page step 2.b.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C
(
STEP 9
Standard:
Comment NOTE:
NOTE STEP 10 Standard:
NOTE Page 9 of 14 Notify plant personnel of any potentially hazardous effluent release via the plant page.
(3-0NOP-067 Foldout page step 1)
Examinee makes a plant page announcement to notify plant of any potentially hazardous effluent release via the plant If during step 6 the examinee transition Radioactive Effluent Release directly, Procedure note:
Foldout page shall be rnnlnlTn Verify RCV-014, following cue, "The loader signal to 0 but RCV-014 is still OPEN."
out page shall be monitored throughout this procedure.
actions are duplicated in 3-ARP-097.CR page 402 step 2 Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C
(
STEP 11 Standard:
Comment NOTE STEP 12 Comment Page 10 of 14 Check R-14 High Alarm On.
(3-0NOP-067 step 1)
Examinee verifies R-14 HIGH alarm by observing R-14 HI LIGHT ON.
These actions are duplicated in 3-ARR Examinee validates alarm
- 1.
on for R-14 and checks n
channel failure e actions are duplicated in 3-ARP-097.CR page 402 step 3.a.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 13 Standard:
Comment STEP 14 Standard:
Comment Page 11 of 14 Perform Corrective Action For PRMS HIGH ALARM (3-0NOP-067 step 3)
Examinee checks R-14 alarm is ON and transitions to step Verify RCV-014 - CLOSED (3-0NOP-067 step 42)
The examinee dire implements RNO If directed the SNPO will for RCV-014 has been red
.CR page 402 step 3.b Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
(
Appendix C STEP 15 Standard:
Comment NOTE:
Page 12 of 14 Locally close RCV-014 Isolation valve, 46388 (3-0NOP-067 step 42 RNO a)
Examinee directs the SNPO to locally close "8" Waste Gas Isolation, 46388.
If directed to locally close "8" Waste Gas Decay wait one minute and respond as SNPO,"The 8 Tank Isolation, 46388 is CLOSED."
These actions are duplicated in 3-ARP-097.CR page Terminating The task is complete SNPO to Cue:
locally close RCV-014 I Stop Time Form ES-C-1 STOP NUREG 1021 Rev 9 Appendix C
I Appendix C Page 13 of 14 Form ES-C-1 Verification of Completion
(
JPM H
-=~~--------------------------------~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Examiner's signature and date: ----------------------------------
NUREG 1021 Rev 9 Appendix C
(
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Unit 3 is in MODE 1 100% power No equipment is out of service.
- . The SNPO is preparing to initiate a "8" Waste Gas release using 0-OP-061.1 Controlled Radioactive Gas Release step 7.1.2 8
!NITIA TlNG CUE:
You have been directed to monitor the Waste Gas release usi System Controlled Radioactive Gas Release.
Acknowledge to the examiner when you are ready to HAND THIS PAPER BACK TO YOU SATISFACTORILY COMPLETED TH NUREG 1021 Rev 9 Appendix C
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet
_T_u_r_k_e,,-Y _P_o_in_t _______ Task No:
_R_es-,-p_o_n_d_to_A_TW_S_Lo_c_a_II,,-Y __ JPM No:
KIA
Reference:
001 A2.13 R04.4 SRO 4.6 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
14028009500 JPMI Simulated Performance X
Actual Performance
~----------
-~-~-~
Classroom Simulator -------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss complete the task successfully, the objective for this job perfor Initial Conditions:
4-EOP-FR-S.1 Response to Nuclear Power Ge Task Standard:
Local actions have been implemented to trip the Required Materials:
None General
References:
Form ES-C-1 NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 8 Initiating Cue:
You have been directed to proceed to the Unit 4B MCC room and take local actions to Reactor.
Open the Unit 4A and 4B Reactor Trip Breakers Open the 4A and 4B Reactor Trip Bypass Breakers.
Open the 4A and 4B MG set generator output breake Open the 4A and 4B MG set motor input brea Time Critical Task: No Validation Time:
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS Form ES-C-1 NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 8 Form ES-C-1 I Denote critical steps with a check mark( J)
STEP 1
Examinee proceeds to the Unit 4B MCC Room Standard:
Examinee proceeds to the Unit 4B MCC Room Comment STEP 2
Examinee locates the Unit 4 Reactor Trip B SAT UNSAT Standard:
The Unit 4 When asked, provide the Tri he Unit 4 A and B Reactor Trip NUREG 1021 Rev 9 Appendix C
Appendix C STEP 3
Standard:
Comment NOTE:
STEP 4
Page 4 of 8 Examinee locally opens the Unit 4 Reactor Trip Breakers.
(4-EOP-FR-S.1 RNO Step 7a)
The Unit 4A and B Reactor Trip Breakers have been open depressing the TRIP button on the front of the Unit 4A and Trip Breakers When the examinee demonstrates opening ea depressing the trip button on the front of the Trip Breakers, provide the following cue:
The red "CLOSED" flag is off, the Examinee locates the Un kers ss have been located Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 5
Standard:
Comment NOTE:
STEP 6
Comment Page 5 of 8 Examinee verifies the Unit 4 Reactor Trip Bypass Breakers are opened.
(4-EOP-FR-S.1 RNO Step 7a)
The Unit 4A and B Reactor Trip Bypass Breakers have opened When asked, provide the following cue for the U Trip Bypass Breakers:
"The Unit 4A and B Reactor Trip Bypass the cubicle as shown; the green "OPE The Unit 4 Reactor Examinee locates the U Breakers utput Breakers have been light is ON, the green "OPEN" light is OFF Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 7
Standard:
Comment NOTE:
STEP 8
Comment Page 6 of8 Examinee opens the Unit 4A and B MG set generator output breakers.
(4-EOP-FR-S.1 RNO Step 7a)
The Unit 4A and B MG set generator output breakers h opened by turning each of the breaker control switches to When the examinee demonstrates opening the breaker control switch to "TRI P", provide the the Unit 4A and B MG set generator output The red "CLOSED" light is OFF, the The Unit 4 A and B in any order put breakers have been control switches to "TRI P",
light is OFF, the green "OPEN" light is ON Unit 4A and B MG set motor input breakers may be opened in any order The task is complete when the Examinee returns the cue sheet to the examiner.
Form ES-C-1 SAT UNSAT STOP Stop Time ___
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 7 of 8 Form ES-C-1 I Verification of Completion
(
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
ry /U nsatisfactory Examiner's signature and date: -----------------------------------
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure satisfied.
INITIAL CONDITIONS:
4-EOP-FR-S.1 Response to Nuclear Power Generation/ATWS, is in prog
!NITIA TlNG CUE:
You have been directed to proceed to the Unit 4B MCC room and Reactor.
Open the Unit 4A and 4B Reactor Trip Breakers Open the 4A and 4B Reactor Trip Bypass B Open the 4A and 4B MG set generator Open the 4A and 4B MG set motor input b Acknowledge to the examiner when NUREG 1021 Rev 9 Appendix C
Appendix C Facility:
Task
Title:
Job Performance Measure Worksheet Turkey Point Task No:
Realign Opposite Units HHSI Pumps JPM No:
KIA
Reference:
006 A4.05 RO 3.9 SRO 3.8 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 24050032500 JPMJ Simulated Performance X
Actual Performance
-~~~----~~r_-----
Classroom Simulator Read to the examinee:
I will explain the initial conditions, which steps to simulate or discus,an complete the task successfully, the objective for this job perfor Initial Conditions:
Both Unit 3 and 4 are in MODE 3 following a Los Unit 3 A Diesel Generator is OOS for maintenan
. ~
Unit 3 B Diesel Generator has sustained an electr al ault' A Small Break LOCA is in progress in Unit 3.
(
.* ~.
Both Unit 3 HHSI pumps are unavailable.
The Unit 3 Unit Supervisor has i Power Recovery with SI Required Task Standard:
""-I,L11}>Vquired, ATTACHMENT 1 is complete.
ecovery with 81 Required, ATTACHMENT 1.
Gen C Power Recovery with SI Required, ATTACHMENT 1.
NUREG 1021 Rev 9 Appendix C
Appendix C Page 20f9 Form ES-C-1 Initiating Cue:
You have been directed to perform 3-EOP-ECA-0.2 ATIACHMENT 1, REALIGNMENT OF HIGH-HEAD SI PUMP SUCTION TO UNIT 3 RWST Time Critical Task: No Validation Time:
20 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
(
NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of9 Form ES-C-1 I SIMULATOR SETUP NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
Standard:
Comment NOTE:
STEP 2
/
Comment Page 4 of 9 Denote critical steps with a check mark( /)
Obtain required materials.
Procedure, ladder and keys are obtained.
Provide the Examinee with a copy of 3-REALIGNMENT OF UNIT 4 HIGH-HEAD SI 3 RWST.
Open SI pump red materials, tell the ladder for this sim p Suction Header Suction Cross-Connect Valve" on Cross-Connect Valve both valve stem has fully the end of the stroke, the valve operated 870A, High-Head SI Pump Suction Header Sectionalizing valve AND 870B, SI Pump Suction Cross-Connect Valve are located under the deck plate immediately north of the Unit 4A HHSI pump.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C
(
STEP 3
Standard:
Comment STEP 4
Standard:
Page 5 of 9 Unlock and open high-head SI Pump Mini Flow Recirc Cross-Connect Valves 892A and 892B.
(3-EOP-ECA-O.2 Attachment 1 Step 1.b)
Examinee unlocks and opens both of the High-Head SI Pump Recirc Cross-Connect Valve 892A and 892B When asked provide the following cue, "High-Head SI Pump Mini Flow Recirc Cross-stem has fully risen and has reached the end of operated smoothly."
"High-Head SI Pump Mini Flow Recirc stem has fully risen and has reached nn""r~t~~rl smoothl "
Unlock and close (3-EOP-ECA-0.
Outlet valve 4-864C
, "Unit 4 RWST Outlet valve 4-stem has fully lowered and has valve operated smoothly."
Form ES-C-1 I SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
Standard:
Comment*
STEP 6
Standard:
Page 6 of9 Turn ON control power AND close Unit 4 High-Head SI Pump Recirc To RWST valves MOV-4-856A and MOV-4-8568.
(3-EOP-ECA-O.2 Attachment 1 Step 1.d)
Examinee simulates making notification to the Control Room ON control power AND close Unit 4 High-Head SI P To RWST valves MOV-4-856A and MOV-4-8568 When asked provide the following cue, "The Co Unit 4 High-Head SI Pump Recirc To RWST MOV-4-8568 control power has been turned CLOSED."
Turn OFF control power to Unit 4 High-Head SI Pump RWST valves MOV MOV-4-8568.
Control Room reports the p Recirc To RWST valves turned OFF."
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 6
Standard:
Comment Page 7 of 9 Notify Unit 3 RCO That The Attachment Has Been Completed.
(3-EOP-ECA-O.2 Attachment 1 Step 2)
Examinee simulates making notification the attachment has completed Terminating The task is complete when the Cue:
the examiner.
Form ES-C-1 I STOP NUREG 1021 Rev 9 Appendix C
Appendix C Page 8 of9 Form ES-C-1 Verification of Completion Job Performance Measure No.
JPM J
~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
(
Examiner's signature and date: __________________________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will satisfied.
INITIAL CONDITIONS:
Both Unit 3 and 4 are in MODE 3 following a Loss of Offsite Power.
Unit 3 A Diesel Generator is OOS for maintenance.
- . Unit 3 B Diesel Generator has sustained an electrical fault resulting in an 86 I A Small Break LOCA is in progress in Unit 3.
Both Unit 3 HHSI pumps are unavailable.
The Unit 3 Unit Supervisor has implemented 3-EOP-ECA-O.2, Loss Required INITIA TlNG CUE:
You have been directed to perform 3-EOP-ECA-0.2 A HEAD SI PUMP SUCTION TO UNIT 3 RWST NUREG 1021 Rev 9 Appendix C
Appendix C Facility:
(
Task
Title:
Job Performance Measure Worksheet
_T,c-u=r...:...:k,-=:ey~P,-:co-,,-in~t ----=:-:-----:-____ Task No:
Locally Start a Diesel Generator JPM No:
KIA
Reference:
064 A4.01 RO 4.0 SRO 4.3 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Form ES-C-1 14200014300 JPMK Simulated Performance X
Actual Performance Classroom Simulator -------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discus complete the task successfully, the objective for this job perfor Initial Conditions:
Unit 3 and Unit 4 are both in MODE 3 followin The Control Room has been evacuated usin Task Standard:
The 48 Diesel Generator AND The 48 4kv bus is o m Evacuation, Attachment 6 NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 11 Form ES-C-1 Initiating Cue:
You have been directed to perform 0-ONOP-105, Control Room Evacuation, Attachme and 17.
0-ONOP-105, Control Room Evacuation, Attachment 6 step 16.a has been co RO.
You have already been obtained a Radio, the NLO key ring, and a high Time Critical Task: No Validation Time:
30 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT NUREG 1021 Rev 9 Appendix C
I Appendix C Page 3 of 11 Form ES-C-1 I SIMULATOR SETUP NUREG 1021 Rev 9 Appendix C
Appendix C STEP 1
Standard:
Comment STEP 2
/
Standard:
Page 4 of 11 Denote critical steps with a check mark( /)
Obtain required materials Examinee obtains 0.,ONOP-105, Control Room Provide the Examinee with a copy of O-ONOP Evacuation, page 4 and 5 of Attachment 6.
Place 48 EDG Master (0-ONOP-105,
" provide the following cue:
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C Page 5 of 11 Form ES-C-1 I STEP 3
Place Isolation Switch, CS-19, to ISOLATE (0-ONOP-105, Attachment 6 step 16.c)
Standard:
Examinee places the Isolation Switch CS-19 to the ISOLATE When the examinee places Isolation Switch CS-19 the following cue:
"Isolation Switch, CS-19, has been placed Comment.
STEP 4
Place Isolation Switch, CS-18, to ISOLATE SAT (0-ONOP-105, A UNSAT Standard:
TE position NUREG 1021 Rev 9 Appendix C
Appendix C STEP 5
Standard:
Comment NOTE:
STEP 6
Standard:
Comment Page 6 of 11 Check 4B EDG - running (O-ONOP-1 05, Attachment 6 step 17)
Examinee observes the 4B EDG is NOT running When asked provide the following cue, "The 4B D 4B Diesel Generator output voltage is 0, 4B D frequency is 0."
Examinee verifies the 4B Diesel Generator NOT transitions to step 17 RNO column.
Verify 4B EDG 1 (O-ONOP-105,
, "The Lockout Relay handle is with an ORANGE flag displayed."
TRIPPED) aminee has simulated resetting the Diesel Generator by turning the switch to the right provide the following handle is at a 90° angle and locked into place, the K." (Indicating the Lock-out Relay is RESET)
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 7
Standard:
Comment.
STEP 8
Standard:
NOTE:
Page 7 of 11 Restart 48 EDG using Emergency Start pushbutton.
(0-ONOP-105, Attachment 6 step 17 RNO b)
Examinee starts the 48 EDG by pushing the Emergency Sta Pushbutton After the examinee has simulated starting the pushing the Emergency Start Pushbutton nrr"lIrlC "The 48 Diesel engine has started, speed is 60 Hz."
Place synchronizing (0-ONOP-105, Examinee places the Syn ON.
the synchronizing switch for lIowing cue, "The Ing lights are OFF."
synchronization plug to operate the sync switch, the other Unit 4 EDG control room.
will be connected to a de-energized bus.
Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
Appendix C STEP 9
Standard:
Comment NOTE:
STEP 10
./
Standard:
Page 8 of 11 Verify with the Shift Manager in the TSC actions are complete prior to energizing the 48 4kv bus.
(0-ONOP-105, Attachment 6 step 17 RNO d)
Examinee simulates consulting the TSC as to the status of of 0-ONOP-1 05 steps.
When asked provide the following cue, "Steps 1 th and Steps 1 through 5 of Attach The Shift Manager would normally be in the TSC Room evacuation efforts at this time.
Close 48 EDG 8 1 handswitch to CLOSE Form ES-C-1 SAT UNSAT NUREG 1021 Rev 9 Appendix C
I Appendix C STEP 11 Standard:
Comment*
STEP 12 Standard:
Page 9 of 11 Place synchronizing switch for diesel output breaker to OFF.
(0-ONOP-1 05, Attachment 6 step 17 RNO f)
Examinee places the synchronizing switch for diesel output OFF.
After the examinee has simulated placing the diesel output breaker to OFF provide the followi synchronizing lights are OFF and the synch position."
Notify Unit 4 RO to rei (0-ONOP-105, Examinee simulates notifi as required by Attachment 4.
equipment Unit 4 RO acknowledges ment 4.
ete when the Examinee returns the cue sheet to Stop Time Form ES-C-1 SAT UNSAT STOP NUREG 1021 Rev 9 Appendix C
Appendix C Page 10 of 11 Form ES-C-1 Verification of Completion Job Performance Measure No.
JPM K
~~~----------------------------~~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Examiner's signature and date: _______________________________ _
NUREG 1021 Rev 9 Appendix C
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure satisfied.
INITIAL CONDITIONS:
Unit 3 and Unit 4 are both in MODE 3 following a trip from 100%
The Control Room has been evacuated using 0-ONOP-105, Control
!NITIA T!NG CUE:
You have been directed to perform 0-ONOP-105, Control and 17.
0-ONOP-105, Control Room Evacuation, Attachme RO.
You have already been obtained a Radio, the NLO key NO THIS PAP R SATISFACT NUREG 1021 Rev 9 Appendix C