Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TAC:ME176530 June 2009
ML09181067730 June 2009Clarification Needed on MPS3 ISI Intervak RR No. IR-3-08
ML09209021630 June 2009WCAP-16896-NP, Rev 2, Millstone Unit 2 RCS Surge, Spray, Shutdown Cooling, Safety Injection, Charging Inlet, and Letdown/Drain Nozzles Structural Weld Overlay Qualification.Boric Acid
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
Dissimilar Metal Weld
DM weld
TAC:ME176630 June 2009
ML09182027230 June 2009Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46Loop seal
ML09159022625 June 2009Summary of May 26, 2009, Category 1 Pre-Application Meeting with Dominion to Discuss the Proposed License Amendment Request Regarding Charging Pumps at Millstone Power Station, Unit No. 2
ML09180106625 June 2009ISFSI, Millstone, Units 1, 2, 3 and ISFSI, North Anna, Units 1, 2 and Isfsl, Surry, Units 1 and 2 and Isfsl, SGI and OUO Correspondence Distribution Request Update
ML09188051025 June 2009Update of Information Pertaining to Foreign Interests
ML09175099725 June 2009Acceptance Review Regarding Third 10 Year Inservice Inspection Program Interval
ML09175101424 June 2009Acceptance Review for RR for Temporary Non-Code Repair
ML10342058223 June 20092008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1Reserve Station Service Transformer
ML09190036623 June 2009Comment (36) of C.L. Funderburk on Behalf of Dominion on Draft Regulatory Guide DG-4014, Radiological Surveys and Monitoring During Operations. in Regards to Pr 20,30,40,50,70 and 72, Decommissioning Planning
ML09174045023 June 2009Email Regarding Electronic Copy of Presentation Material for MPS2
ML09174045622 June 2009Request to Return Electronic Copy of Presentation
ML09169065218 June 2009Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML0913104285 June 2009Request for Withholding Information from Public Disclosure
ML0916000555 June 2009Requalification Program Inspection Millstone Power Station, Unit 3
ML0915902364 June 2009ISFSI, North Anna, Units 1, 2, & ISFSI, Surry, Units 1, 2, & ISFSI, Kewaunee & ISFSI, Correspondence Distribution Request Change Update
ML09154020429 May 2009Comment (1) of Raymond A. West on Behalf of Dominion Resources Services, Inc., on Draft Regulatory Guide DG-1192 - Request for Inclusion of ASME Code Case N-513-3 - (Proposed Revision 16 of Regulatory Guide 1.147, Dated October 2007)Functionality Assessment
TAC:JO028728 May 2009
ML09152061828 May 2009ISFSI, Proposed Change to Emergency Plan
ML10138004228 May 2009Alternative Request IR-3-12 for the Use of ASME Code Cade N-513-2Functionality Assessment
ML09154001727 May 2009ISFSI - Major Revision 007, Minor Revision 0, to Emergency Plan Procedure, MP-26-EPI-FAP07, Notifications and CommunicationsFitness for Duty
Met Tower
Earthquake
ML09187082322 May 2009Fauske and Associates LLC Letter from Robert E. Henry, 05/22/2009 Response to NRC Request for Fai Proprietary Report (09-44) and Non-Proprietary Version (09-44R) Dated 03/20/2009
ML09191045922 May 2009Enclosure 3 - Fauske and Associates LLC Letter from Robert E. Henry, May 22, 2009 Application for Withholding AW-09-01 with Proprietary Information Notice and One Copy of Affidavit
ML09154020320 May 2009Response to Request for Additional Information 2008 Steam Generator Tube Inspections
IR 05000336/200930118 May 2009Er 05000336/2009301, January 26 - February 24, 2009, Millstone Power Station, Unit 2, Initial Operator Licensing Examination ReportJob Performance Measure
ML09134013315 May 2009Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps from the Technical Specifications for Millstone Power Station, Unit No. 2
IR 05000336/200900214 May 2009IR 05000336-09-002, 05000423-09-002; on 01/01/09 - 03/31/09, Millstone Power Station Integrated Inspection Report and Exercise of Enforcement DiscretionHigh Radiation Area
Non-Destructive Examination
Fire Barrier
Internal Flooding
Enforcement Discretion
Reserve Station Service Transformer
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Operability Determination
Fire Protection Program
Downpower
ML09133063813 May 2009Ltr. to Mr. John Caruso, Dated 5/13/09, Plan for Reactor Operators Return to Active Status
ML09141044911 May 2009Correction to Date of Letter Serial No. 09-248 Independent Spent Fuel Storage Installation Submittal of Cask Registration for Spent Fuel Storage
ML0912802327 May 2009Summary of April 23, 2009, Annual Assessment Meeting with Dominion Nuclear Connecticut, Inc. and the Connecticut Nuclear Energy Advisory Council (Neac)
ML0912601596 May 2009Senior Reactor and Reactor Operator Initial Examinations - (Millstone Power Station, Unit 3)
ML0913805056 May 2009Burton V. USNRC; No. 09-1901-ag - Petition to Review an Order
ML0912502405 May 2009Response to Request for Additional Information Regarding 10 CFR 50.55a Relief Request 89-65 and 89-66; Temporary Non-Code Repair of the Class 3 Service Water System Emergency Diesel Generator Jacket Water Heat Exchanger and Cooler.Time of Discovery
Nondestructive Examination
ML09362008630 April 2009WCAP-17071-NP, Rev 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F)Finite Element Analysis
ML09127025030 April 2009Final Qa/Related Forms (Folder 1)
ML09133024030 April 20092008 Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Power change
ML09135021730 April 2009Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
Fuel cladding
ML09132046028 April 20092008 Occupational Radiation Exposure Information
ML09131066628 April 2009Third 10-year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief RequestsBoric Acid
High Radiation Area
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
DM weld
Scaffolding
Weak link
ML09132056127 April 2009Annual Environmental Protection Plan Operating ReportGrab sample
ML09120016727 April 2009Units 1, 2 & 3; North Anna, Units 1 & 2 and Surry Power, Units 1 & 2 - Submittal of Dominion'S Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation (Isfsi).
ML09105062323 April 2009NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides
ML09134026323 April 2009ISFSI - Major Revision 005, Minor Revision 0 to Emergency Plan Procedure, MP-26-EPI-FAP02, Technical Support Center Activation and OperationSevere Accident Management Guideline
Minimum staff
ML09222038721 April 2009Summary of NRC Comments on Draft Operating Test (Folder 2)
ML09117013820 April 2009Test Results for Gas-Water Transport Tests
ML09112000617 April 2009NRC Operator Licensing Initial Exam Results, Millstone Power Station, Unit 2 (Cover Letter Publicly Available; Enclosures Non-Public)
Press Release-I-09-022, NRC to Discuss Annual Assessment for Millstone Nuclear Plant at Two Public Meetings Set for April 23 in Waterford, Conn17 April 2009Press Release-I-09-022: NRC to Discuss Annual Assessment for Millstone Nuclear Plant at Two Public Meetings Set for April 23 in Waterford, Conn
ML09105066015 April 2009Notice of Public Meeting with Nuclear Energy Advisory Council, to Discuss Nrc'S Assessment of Safety Performance of Millstone for Cy 2008