Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09182075729 June 2009Non-Disclosure Agreement for a Computer Code of the United States Nuclear Regulatory Commission
ML09173013225 June 200906/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CAArc flash
ML09155035124 June 2009Branch Chief Assignment-James A. FitzPatrick Nuclear Power Plant
JAFP-09-0077, Submittal of Blind Sample Error Investigation Report18 June 2009Submittal of Blind Sample Error Investigation Report
ML09169039712 June 2009ME0727, Comments from Ny State on Application for Exemption from 10 CFR 50, Appendix R Section III.G.2 Requirements Based on Manual ActionsHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Exemption Request
Fire Protection Program
ML11069113211 June 2009E-mail from B. Metzger, NRR to D. Frumkin, NRR on Distribution of OMAs
ML0915503488 June 2009License Amendment, Issuance of Emergency Amendment to Facility Operating License One-Time Extension of AOT in TS 3.8.1, Required Action B.4 Completion TimeSafe Shutdown
High winds
Anticipated operational occurrence
Probabilistic Risk Assessment
Reserve Station Service Transformer
Large early release frequency
Offsite Circuit
JAFP-09-0072, Response to Request for Additional Information Regarding: Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time6 June 2009Response to Request for Additional Information Regarding: Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion TimeProbabilistic Risk Assessment
Reserve Station Service Transformer
JAFP-09-0070, Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time4 June 2009Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion TimeHot Short
Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Reserve Station Service Transformer
Qualified Offsite Circuit
Thermoset
Large early release frequency
Earthquake
Offsite Circuit
ML0915507233 June 2009Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time - (Draft)Hot Short
Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Qualified Offsite Circuit
Thermoset
Large early release frequency
Earthquake
Offsite Circuit
ML0915507682 June 2009ME1387-ME1404, Draft Emergency Amendment Request - Comments from PRA Branch
TAC:ME13872 June 2009
TAC:ME14042 June 2009
ENOC-09-00021, Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses29 May 2009Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses
ML09147048327 May 2009Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders
TAC:ME128627 May 2009
ML11069128522 May 2009E-mail from D. Frumkin, NRR to B. Metzger, NRR FW: Support for Manual Action Exemption Reviews
JAFP-09-0066, Physical Security Plan, Revision 420 May 2009Physical Security Plan, Revision 4
TAC:ME251315 May 2009
TAC:ME251515 May 2009
ENOC-09-00015, Request for Extension of Orders Approving Transfer of Control of Licenses15 May 2009Request for Extension of Orders Approving Transfer of Control of Licenses
ML09134055414 May 2009Summary of Annual Assessment Open-House Public Meeting with Nine Mile Point and FitzPatrickOpen House
ML09134004414 May 2009Annual Assessment Meeting Sign-in Sheet, April 30, 2009
ML09132005912 May 2009Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207)
TAC:ME119812 May 2009
JAFP-09-0060, Summary of Commitment Changes for 2007 and 200811 May 2009Summary of Commitment Changes for 2007 and 2008Emergency Lighting
B.5.b
Scaffolding
JAFP-09-0056, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.4811 May 2009Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.48
IR 05000333/20090027 May 2009IR 05000333-09-002, on 01/01/2009 - 03/31/2009, James A. Fitzpatrick Integrated Inspection ReportHigh winds
High Radiation Area
Fire Barrier
Hydrostatic
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Frazil ice
Fuel cladding
Fire Protection Program
Downpower
ML0910702101 May 2009Inservice Inspection Program Relief Requests Third 10-Year Interval Closeout, Request to No. RR-CRV-1VT-2
Incorporated by reference
IR 05000333/200940230 April 2009IR 05000333-09-402, on 03/23/2009 - 03/27/2009, James A. FitzPatrick Nuclear Power Plant, Security; Access Control. (Letter Only)Significance Determination Process
Affidavit
JAFP-09-0055, Annual Radioactive Effluent Release Report, for the Period of January 1, 2008 Through December 31, 200830 April 2009Annual Radioactive Effluent Release Report, for the Period of January 1, 2008 Through December 31, 2008High winds
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions27 April 2009Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour RestrictionsSafe Shutdown
Fitness for Duty
Press Release-I-09-023, NRC to Conduct Open House on April 30 Regarding Annual Assessment of Performance for Nine Mile Point and FitzPatrick Nuclear Power Plants23 April 2009Press Release-I-09-023: NRC to Conduct Open House on April 30 Regarding Annual Assessment of Performance for Nine Mile Point and FitzPatrick Nuclear Power PlantsOpen House
JAFP-09-0051, 2007 Annual Radioactive Effluent Release Report Revision to Tables 1, 1A, 1B and 2A17 April 20092007 Annual Radioactive Effluent Release Report Revision to Tables 1, 1A, 1B and 2AOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G13 April 2009Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML0909701107 April 2009ME0727, Acceptance Review - Request for Exemption from 10 CFR 50 Appendix R Requirements Based on Manual Actions
ML0909602176 April 2009Notice of Licensee Meeting with Constellation Energy and Entergy Nuclear Northeast to Discuss Nrc'S Assessment of Safety Performance of Nine Mile Point and FitzPatrick for Calendar Year 2008Open House
ML0909200421 April 2009March 4, 2009 NRC Generic Fundamentals Examination (GFE) Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public)Generic Fundamentals Examination
ML0907100081 April 2009Request for Alternative Jaf RR-7, Rev 1 to Install a Weld Overlay on N2C Nozzle to Recirculation Inlet Piping Safe-end Dissimilar Metal WeldWeld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld