MONTHYEARJAFP-09-0025, James A. Fitzpatrick - Request for Exemption from 10 CFR 50 Appendix R Section III.G.2 Requirements Based on Manual Actions2009-02-18018 February 2009 James A. Fitzpatrick - Request for Exemption from 10 CFR 50 Appendix R Section III.G.2 Requirements Based on Manual Actions Project stage: Request ML0907700582009-03-20020 March 2009 ME0727 - Request for Supplemental Information Required for Completion of Acceptance Review Project stage: Acceptance Review JAFP-09-0038, Response to the Request for Supplemental Information to Complete Acceptance Review - Request for Exemption from 10 CFR, Appendix R, Section III.G.2 Requirements Based on Manual Actions (Redacted Version)2009-03-30030 March 2009 Response to the Request for Supplemental Information to Complete Acceptance Review - Request for Exemption from 10 CFR, Appendix R, Section III.G.2 Requirements Based on Manual Actions (Redacted Version) Project stage: Supplement ML0909602142009-03-30030 March 2009 James A. FitzPatrick, Response to Request for Information Required for Acceptance Review Regarding: Request for Exemption Project stage: Response to RAI ML0909701102009-04-0707 April 2009 ME0727, Acceptance Review - Request for Exemption from 10 CFR 50 Appendix R Requirements Based on Manual Actions Project stage: Acceptance Review ML0916903972009-06-12012 June 2009 ME0727, Comments from Ny State on Application for Exemption from 10 CFR 50, Appendix R Section III.G.2 Requirements Based on Manual Actions Project stage: Other ML0925906182009-08-16016 August 2009 ME0727, RAIs from Afpb on Request for Exemption from 10 CFR 50, Appendix R, Section III.G.2 Based on Manual Actions Project stage: RAI ML0932700752009-11-17017 November 2009 James A. FitzPatrick Nuclear Power Plant - Response to Request for Additional Information Re Request for Exemption from 10 CFR 50, App R, Section III.G.2 Project stage: Response to RAI JAFP-09-0130, Response to Request for Additional Information on Exemption2009-11-17017 November 2009 Response to Request for Additional Information on Exemption Project stage: Response to RAI JAFP-09-0144, Response to Request for Additional Information Regarding: Request for Exemption2009-12-11011 December 2009 Response to Request for Additional Information Regarding: Request for Exemption Project stage: Response to RAI ML1001312422010-01-13013 January 2010 ME0727, Follow-up RAI Request for Exemption from Requirements of 10 CFR 50, Appendix R, Section III.G.2 for Manual Action Project stage: RAI JAFP-10-0011, Response to Request for Additional Information Regarding: Request for Exemption2010-01-19019 January 2010 Response to Request for Additional Information Regarding: Request for Exemption Project stage: Response to RAI ML0912401422010-03-0404 March 2010 Environmental Assessment and Finding of No Significant Impact Project stage: Other ML1003406702010-03-11011 March 2010 Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.2 Project stage: Approval ML1003406612010-03-11011 March 2010 FRN: General Notice. James A. FitzPatrick Nuclear Power Plant, ME0727, Exemption from Appendix R Section G.III.2 Requirements for a Manual Action Project stage: Approval NRC-2010-0095, FRN: General Notice. James A. FitzPatrick Nuclear Power Plant, ME0727, Exemption from Appendix R Section G.III.2 Requirements for a Manual Action2010-03-11011 March 2010 FRN: General Notice. James A. FitzPatrick Nuclear Power Plant, ME0727, Exemption from Appendix R Section G.III.2 Requirements for a Manual Action Project stage: Approval 2009-04-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21246A2112021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-505 ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21014A5112021-01-12012 January 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-545 Revision 3 ML20352A2752020-12-17017 December 2020 Request for Additional Information Regarding FitzPatrick Primary Containment Isolation Valve Amendment Request ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20294A0372020-10-19019 October 2020 Request for Additional Information Primary Containment Isolation Valve License Amendment Request ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20217L3882020-08-0404 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Modify Primary Containment Isolation Valve TS (EPID L-2020-LLA-0145) (E-Mail) ML20204A9692020-07-22022 July 2020 Acceptance of Requested Licensing Action License Amendment Request to Adopt-TSTF-478 Revision 2 ML20122A2302020-05-0101 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of Fleet License Amendment Request to Adopt TSTF-566 ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment ML20056E7992020-02-25025 February 2020 Request for Additional Information for LAR on Primary Containment Hydrodynamic Loads ML20035D5762020-02-0303 February 2020 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence ML20027A0672020-01-24024 January 2020 Accepted for Review - Fitzpatrick License Amendment Request to Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20027A0112020-01-23023 January 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19353A9452019-12-19019 December 2019 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML19319C3582019-11-15015 November 2019 NRR E-mail Capture - Accepted for Review - FitzPatrick License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19322A0062019-11-15015 November 2019 NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly Valves ML19316A0162019-11-0404 November 2019 NRR E-mail Capture - Revised Staff Hours Estimate - FitzPatrick License Amendment Request on Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads 2024-01-24
[Table view] |
Text
From: Alyse L. Peterson [alp@nyserda.org]
Sent: Friday, June 12, 2009 2:12 PM To: Vaidya, Bhalchandra
Subject:
FitzPatrick fire protection exemption request Attachments: FitzPatrick Fire_Safety exemption comments.doc Good afternoon, We have reviewed the February 18, 2009 request for exemption from 10CFR 50 Appendix R Section III.G.2 Requirements Based on Manual Actions for the FitzPatrick nuclear power plant. Our comments are presented in the attached file. Thank you for the opportunity to comment.
Sincerely, Alyse Peterson, P.E.
Senior Project Manager Nuclear Coordination and Radioactive Waste Policy NYSERDA 17 Columbia Circle Albany, NY 12233-6399 t 518-862-1090 x3274 f 518-862-1091 E-mail Properties Mail Envelope Properties (636C67B366068442AC5897B38307CCD403A4E52111)
Subject:
FitzPatrick fire protection exemption request Sent Date: 06/12/2009 2:14:04 PM Received Date: 06/12/2009 2:14:04 PM From: Alyse L. Peterson Created By: alp@nyserda.org Recipients:
Bhalchandra.Vaidya@nrc.gov (Vaidya, Bhalchandra)
Tracking Status: None Post Office:
albexchange01.nyserda.org Files Size Date & Time MESSAGE 41101 06/12/2009 FitzPatrick Fire_Safety exemption comments.doc 27528 Options
Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:
[ATTACHEMENT TO THE E-MAIL FROM ALYSE PETERSON]
[COMMENTS FROM THE STATE OF NEW YORK]
[ON THE EXEMPTION REQUEST FROM JAMES A. FITZPATRICK NUCLEAR POWER PLANT]
6/12/09 The State of New York has some concerns about the requested exemption from the 1980 fire safety regulations for the FitzPatrick nuclear power plant, dated February 18, 2009.
The facility in question is a MARK 1 boil water reactor that received its initial operating license in October 1974. As such, it is subject to 10 C.F.R. § 50.48 and Appendix R to Part 50 Appendix R (Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979).
Public Notice and Opportunity to Request a Hearing It appears that the requested action will effectively amend the facilitys operating license as well as the operative regulation, 10 C.F.R. § 50.48 and Appendix R to Part 50 Appendix R,Section III.G. Thus, regardless of what words are used to refer to the requested change, notice of the request should be published in the Federal Register and the public should be offered an opportunity to comment on the environmental impacts and request a hearing. Such transparency and opportunity for participation is consistent with the Atomic Energy Act, the National Environmental Policy Act, the Administrative Procedure Act, the federal Council on Environmental Quality regulations, and the Commissions commitment to public participation in its administrative matters.
The Fire Safety Regulation Specifically, paragraph III.G.2 of 10 C.F.R., Appendix R requires that, where electrical cables or equipment, including associated non-safety circuits that could prevent operation or cause maloperation as a result of hot shorts, open circuits, or shorts to ground of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area outside of primary containment, one of the following means of ensuring that one of the redundant trains is free of fire damage shall be provided:
(a) separation of cables and equipment by a fire barrier having a 3-hour rating,
(b) separation of cables and equipment by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards and with fire detectors and an automatic fire suppression system in the fire area, and (c) enclosure of cables and equipment in a fire barrier having a 1-hour rating and with fire detectors and an automatic fire suppression system in the fire area.
Paragraph III.G.2 of Appendix R does not list operator manual actions as a means of ensuring that one of the redundant trains is free of fire damage.
This regulation has been applicable since November 1980 when it was promulgated by NRC. According to RIS 2006-10, in 2000, the NRC implemented the Reactor Oversight Process which included systematic inspections of licensees safe shutdown capability.
During these inspections, fire protection inspectors noticed that many licensees had not upgraded or replaced Thermo-Lag 330-1 fire barrier material or had not provided the required separation distance between redundant safe shutdown trains, in order to satisfy the requirements in paragraph III.G.2 of Appendix R to 10 CFR Part 50.
In the present situation, the licensee states that the Safety Relief Valve electrical trains or cables, which control the emergency depressurization system, do not meet the required minimum separation distances prescribed in Appendix R. (The issue of fire insulation material does not come in to play here since the facility does not use significant amounts of such insulation around electric cables or trains.)
The Proposed Operator Manual Action According to the February 2009 filing, the licensee relies upon an Operator Manual Action that is not allowed per 10 C.F.R. Part 50, Appendix R, Section III.G.2. Further, the NRC has stated that manual actions are not specifically authorized by Appendix R,Section III.G.2.
If a fire were to occur, the manual action proposed by the licensee requires an operator to leave the control room, travel to a local control panel located in the reactor building, and then operate up to eleven (11) valves that are essential for the depressurization system and the emergency core cooling system.
Based on the submissions, it appears that it could take up to
fifteen minutes for an operator to reach the local control panel in the reactor building.
While it may be appropriate to regularize and formalize the proposal to have an employee manually operate the safety related valves, the February 2009 application seeks to do so in a way that avoids the opportunity for the public to request a proceeding or comment on potential environmental impacts. Also, the application does not appear to discuss the impact of the proposed change on the defense and security of the facility and host community, the feasibility of the proposed change during a significant fire event, or the cumulative effect of the proposed change given the several previous changes to the fire protection program at the facility. It would seem appropriate to address these issues via a public forum under the AEA, APA, and NEPA before reaching any final decision.