Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08176052727 June 2008Fleet - Ria Re - Security Bulletin 2007-01
TAC:MD757027 June 2008
ML08176030416 June 2008Amergen Energy Company, LLC Quality Assurance Topical Report, NO-AA-10, Revision 81Safe Shutdown
Fitness for Duty
Shutdown Margin
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Operability Determination
Maintenance Rule Program
Fire Protection Program
RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I9 June 2008Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item ImIncorporated by reference
Scram Discharge Volume
Overtravel
IR 05000373/20085026 June 2008IR 05000373-08-502, 05000374-08-502, on 04/28/2008 - 05/02/2008, LaSalle County Station, Units 1 and 2, Biennial Emergency Preparedness Exercise Baseline Inspection
ML0812007842 June 2008Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting.
ML0812007572 June 2008Summary of Category 1 Meeting with Exelon to Discuss Current and Planned Licensing Activities and ProcessesPandemic
RA08-036, Cycle 13 Startup Test Report Summary28 May 2008Cycle 13 Startup Test Report SummaryShutdown Margin
RA08-035, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report28 May 2008Post-Outage 90-Day Inservice Inspection (ISI) Summary ReportNon-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
EVT-1
Liquid penetrant
ML08119047028 May 2008Relief Request for 13R-11 for Third Ten-Year Inservice Inspection IntervalVT-2
Through-Wall Leak
Scaffolding
ML08137039021 May 2008Co., Llc., Amergen Energy Co., Llc., Correction of Safety Evaluation Supporting Relief Request Authorization to Use Boiling-Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code RequirementsEVT-1
TAC:MD636419 May 2008
RA08-034, Annual Radiological Environmental Operating Report15 May 2008Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
TAC:MD790013 May 2008
RS-08-063, Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System13 May 2008Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management SystemAnticipated operational occurrence
Cyber Security
Affidavit
ML0809301227 May 2008Request for Relief from ASME OM Code for the Third Inservice Testing IntervalIncorporated by reference
IR 05000373/20084026 May 2008IR 05000373-08-402, (Drs), IR 05000374-08-402, (Drs), on 04/11/2008, for Lasalle County Station
RS-08-062, Request for a License Amendment to Technical Specification 3.8.3, Diesel Fuel Oil and Starting Air to Relocate Stored Fuel Oil Volumes to Licensee Control2 May 2008Request for a License Amendment to Technical Specification 3.8.3, Diesel Fuel Oil and Starting Air to Relocate Stored Fuel Oil Volumes to Licensee ControlSafe Shutdown
Anticipated operational occurrence
RA08-027, Annual Radioactive Effluent Release Report30 April 2008Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML08098031130 April 2008Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines..Incorporated by reference
EVT-1
ML08094021529 April 2008RR 13R-01, Associated with the Third 10-Year IntervalProbabilistic Risk Assessment
Large early release frequency
Exemption Request
RA-08-030, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report29 April 2008Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation ReportPost Accident Monitoring
IR 05000373/200800228 April 2008IR 05000373-08-002, 05000374-08-002, on 1/01/2008 - 3/31/202008, LaSalle County Station, Units 1 & 2, Maintenance Effectiveness and Identification and Resolution of ProblemsHigh Radiation Area
Stroke time
Water Inventory Control
Safe Shutdown Earthquake
Enforcement Discretion
Operating Basis Earthquake
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Earthquake
Control of Heavy Loads
Fire Watch
Substantial potential for overexposure
Coast down
Overexposure
ML08122020825 April 2008County Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information 05000373/2008004 and 05000374/2008004
ML08115041622 April 2008Pandemic Planning Utility Interface with NRC Slide PresentationPandemic
RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.21 April 2008Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.Fitness for Duty
Offsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML08114069618 April 2008Ltr. 04/18/08 LaSalle Re Confirmation of Initial License Examination
ML08113076717 April 2008U.S. Dept of Homeland Security/Review of the Updated Illinois Plan for Radiological Accidents (IPRA) - LaSalle, Volume III, Dated 04/08/Letter
ML08108001016 April 2008Summary of Public Meeting with NRC and Exelon Generation Company LaSalle Performance Assessment, with Presentation Slides
ML08106003215 April 2008Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 35 of 41 - Sheet 39 of 41)14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 35 of 41 - Sheet 39 of 41)
ML08133007714 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 35 of 41 - Sheet 39 of 41)
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 32 of 41 - Sheet 34 of 41)14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 32 of 41 - Sheet 34 of 41)
ML08133007614 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 32 of 41 - Sheet 34 of 41)
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 29 of 41 - Sheet 31 of 41)14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 29 of 41 - Sheet 31 of 41)
ML08133007514 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 29 of 41 - Sheet 31 of 41)
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 23 of 41 - Sheet 25 of 41)14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 23 of 41 - Sheet 25 of 41)
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 26 of 41 - Sheet 28 of 41)14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 26 of 41 - Sheet 28 of 41)
ML08133007914 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1a Through Figure 9.5-7
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1a Through Figure 9.5-714 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1a Through Figure 9.5-7
ML08133007414 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Figure 9.5-1 (Sheet 26 of 41 - Sheet 28 of 41)
ML08133008014 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 10.0 - Steam and Power Conversion SystemSafe Shutdown
Loop seal
Hydrostatic
Abnormal operational transient
Fuel cladding
Biofouling
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 10.0 - Steam and Power Conversion System14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 10.0 - Steam and Power Conversion SystemSafe Shutdown
Loop seal
Hydrostatic
Abnormal operational transient
Fuel cladding
Biofouling
ML08133008214 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 12.0 - Radiation ProtectionHigh Radiation Area
Grab sample
Anticipated operational occurrence
Coatings
Locked High Radiation Area
Deep Dose Equivalent
Fuel cladding
Power Uprate
ML08133008614 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 16.0 - Technical Specifications
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 16.0 - Technical Specifications14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 16.0 - Technical Specifications
ML08133008714 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 17.0 - Quality Assurance
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 17.0 - Quality Assurance14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 17.0 - Quality Assurance
ML08133008814 April 2008Updated Final Safety Analysis Report (Ufsar), Revision 17, Appendix a Through Appendix NHot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Finite Element Analysis
Abnormal operational transient
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Power change
Coast down
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Appendix a Through Appendix N14 April 2008LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Appendix a Through Appendix NHot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Finite Element Analysis
Abnormal operational transient
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Power change
Coast down