Issue date | Title | Topic | |
---|---|---|---|
ML24025A099 | 25 January 2024 | Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements | |
ML24018A248 | 18 January 2024 | License Amendment Request to Modify the Implementation Date of License Amendment No. 238 | |
WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | 26 December 2023 | Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | Cyber Security Fire Watch |
ML23334A250 | 30 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23331A497 | 27 November 2023 | Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 | Safe Shutdown Operator Manual Action Emergency Lighting Fire Protection Program |
ML23325A211 | 20 November 2023 | Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 | Exemption Request |
ML23320A277 | 16 November 2023 | License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 | |
ML23305A347 | 1 November 2023 | Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) | Pressure Boundary Leakage |
ML23292A359 | 19 October 2023 | License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 | Safe Shutdown Operator Manual Action Emergency Lighting Fire Protection Program |
ML23292A357 | 19 October 2023 | Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation | Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Maintenance Rule Program Fire Protection Program Backfit |
ML23275A171 | 16 October 2023 | October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station | High winds Internal Flooding Probabilistic Risk Assessment |
ML23276B455 | 3 October 2023 | Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report | Post Accident Monitoring |
ML23264A868 | 21 September 2023 | Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L | |
ML23243A000 | 31 August 2023 | Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements | Exemption Request |
ML23232A001 | 19 August 2023 | Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 | |
ML23221A393 | 9 August 2023 | Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements | |
ML23220A422 | 8 August 2023 | Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements | Safe Shutdown Emergency Lighting Fire Protection Program |
ML23171B131 | 20 June 2023 | Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | High Radiation Area Nondestructive Examination |
ML23151A416 | 31 May 2023 | Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) | |
WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 17 May 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components | 17 May 2023 | CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components | |
ML23132A153 | 12 May 2023 | Transmittal of 2022 Annual Financial Reports | |
WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) | 10 May 2023 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) | |
WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis | 8 May 2023 | Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Cyber Security |
ML23135A173 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Anticipated operational occurrence Water Inventory Control Safe Shutdown Earthquake Met Tower Temporary Modification Incorporated by reference Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML23135A195 | 8 May 2023 | Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Cyber Security |
ML23135A206 | 8 May 2023 | Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Cyber Security |
ML23135A126 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted | |
ML23135A205 | 8 May 2023 | Quality Program Manual, Wcqpm, Rev 13 | Safe Shutdown Non-Destructive Examination Offsite Dose Calculation Manual Hydrostatic Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Process Control Program Maintenance Rule Program Fire Protection Program Grace period |
ML23135A168 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | |
ML23135A171 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features | Safe Shutdown Boric Acid Packing leak Ultimate heat sink Stroke time Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Nondestructive Examination Emergency Lighting Incorporated by reference Tornado Missile Protection Thermoset Frazil ice Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Scaffolding GOTHIC |
ML23135A166 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 2, Site Characteristics | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Incorporated by reference Frazil ice Earthquake |
ML23135A200 | 8 May 2023 | Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown |
ML23135A175 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid High winds Shutdown Margin Loop seal Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Incorporated by reference Finite Element Analysis B.5.b Tornado Generated Missile Tornado Missile Protection Design basis earthquake Excess Flow Check Valve Frazil ice Earthquake Power-Operated Valves Fuel cladding Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection Scaffolding Grace period Power change Exit Sign |
ML23135A180 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 14, Initial Test Program | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Hydrostatic Temporary Modification Emergency Lighting |
ML23135A176 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Offsite Dose Calculation Manual Tornado Missile Hydrostatic Incorporated by reference Tornado Missile Protection Fast acting solenoid valve Earthquake Power-Operated Valves Turbine Missile |
ML23135A189 | 8 May 2023 | Report, M-6630-00017A, Revision W08, Structural Steel Fireproofing Data | Safe Shutdown Boric Acid Fire Barrier Coatings Fire Protection Program |
ML23135A202 | 8 May 2023 | Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis | Safe Shutdown Cyber Security |
ML23135A174 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 8, Electric Power | Hot Short Safe Shutdown Boric Acid Fire Barrier Anticipated operational occurrence Temporary Modification Emergency Lighting Incorporated by reference Open Phase Condition |
ML23135A170 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Boric Acid Loop seal Stroke time Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Scaffolding Power change |
ML23135A128 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 18, Figures | |
ML23135A167 | 8 May 2023 | 6 to Updated Safety Analysis Report, Figures | |
ML23135A125 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 2, Figures | |
ML23135A117 | 8 May 2023 | Redacted Version of Revision 36 to Updated Safety Analysis Report | Fire Barrier Incorporated by reference |
ML23135A169 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 4, Reactor | |
ML23135A178 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 12, Radiation Protection | Safe Shutdown Boric Acid High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Coatings Incorporated by reference Fuel cladding Pressure Boundary Leakage Scaffolding |
ML23135A203 | 8 May 2023 | Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Operator Manual Action Cyber Security Multiple Spurious Operation Emergency Lighting Pressure Boundary Leakage Fire Protection Program Backfit |
ML23135A179 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations | Offsite Dose Calculation Manual Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Incorporated by reference Job Performance Measure Process Control Program Safeguards Contingency Plan License Renewal Exemption Request Fire Protection Program Scaffolding Grace period |
ML23135A127 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted |