Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24025A09925 January 2024Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements
ML24018A24818 January 2024License Amendment Request to Modify the Implementation Date of License Amendment No. 238
WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-00826 December 2023Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008Cyber Security
Fire Watch
ML23334A25030 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
ML23331A49727 November 2023Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237Safe Shutdown
Operator Manual Action
Emergency Lighting
Fire Protection Program
ML23325A21120 November 2023Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55Exemption Request
ML23320A27716 November 2023License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11
ML23305A3471 November 2023Revision of One Form That Implements the Radiological Emergency Response Plan (RERP)Pressure Boundary Leakage
ML23292A35919 October 2023License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237Safe Shutdown
Operator Manual Action
Emergency Lighting
Fire Protection Program
ML23292A35719 October 2023Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety EvaluationSafe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Maintenance Rule Program
Fire Protection Program
Backfit
ML23275A17116 October 2023October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating StationHigh winds
Internal Flooding
Probabilistic Risk Assessment
ML23276B4553 October 2023Technical Specification 5.6.8 Post Accident Monitoring (PAM) ReportPost Accident Monitoring
ML23264A86821 September 2023Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L
ML23243A00031 August 2023Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 RequirementsExemption Request
ML23232A00119 August 2023Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13
ML23221A3939 August 2023Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements
ML23220A4228 August 2023Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program RequirementsSafe Shutdown
Emergency Lighting
Fire Protection Program
ML23171B13120 June 2023Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsHigh Radiation Area
Nondestructive Examination
ML23151A41631 May 2023Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations17 May 2023Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations
ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components17 May 2023CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components
ML23132A15312 May 2023Transmittal of 2022 Annual Financial Reports
WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)10 May 2023Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)
WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis8 May 2023Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A1738 May 20236 to Updated Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Met Tower
Temporary Modification
Incorporated by reference
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML23135A1958 May 2023Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A2068 May 2023Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A1268 May 20236 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted
ML23135A2058 May 2023Quality Program Manual, Wcqpm, Rev 13Safe Shutdown
Non-Destructive Examination
Offsite Dose Calculation Manual
Hydrostatic
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Maintenance Rule Program
Fire Protection Program
Grace period
ML23135A1688 May 20236 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23135A1718 May 20236 to Updated Safety Analysis Report, Chapter 6, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Tornado Missile Protection
Thermoset
Frazil ice
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Scaffolding
GOTHIC
ML23135A1668 May 20236 to Updated Safety Analysis Report, Chapter 2, Site CharacteristicsSafe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Incorporated by reference
Frazil ice
Earthquake
ML23135A2008 May 2023Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
ML23135A1758 May 20236 to Updated Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
Finite Element Analysis
B.5.b
Tornado Generated Missile
Tornado Missile Protection
Design basis earthquake
Excess Flow Check Valve
Frazil ice
Earthquake
Power-Operated Valves
Fuel cladding
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Early Warning Fire Detection
Scaffolding
Grace period
Power change
Exit Sign
ML23135A1808 May 20236 to Updated Safety Analysis Report, Chapter 14, Initial Test ProgramSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Hydrostatic
Temporary Modification
Emergency Lighting
ML23135A1768 May 20236 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Offsite Dose Calculation Manual
Tornado Missile
Hydrostatic
Incorporated by reference
Tornado Missile Protection
Fast acting solenoid valve
Earthquake
Power-Operated Valves
Turbine Missile
ML23135A1898 May 2023Report, M-6630-00017A, Revision W08, Structural Steel Fireproofing DataSafe Shutdown
Boric Acid
Fire Barrier
Coatings
Fire Protection Program
ML23135A2028 May 2023Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A1748 May 20236 to Updated Safety Analysis Report, Chapter 8, Electric PowerHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Anticipated operational occurrence
Temporary Modification
Emergency Lighting
Incorporated by reference
Open Phase Condition
ML23135A1708 May 20236 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsBoric Acid
Loop seal
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Pressure and Temperature Limits Report
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
Power change
ML23135A1288 May 20236 to Updated Safety Analysis Report, Chapter 18, Figures
ML23135A1678 May 20236 to Updated Safety Analysis Report, Figures
ML23135A1258 May 20236 to Updated Safety Analysis Report, Chapter 2, Figures
ML23135A1178 May 2023Redacted Version of Revision 36 to Updated Safety Analysis ReportFire Barrier
Incorporated by reference
ML23135A1698 May 20236 to Updated Safety Analysis Report, Chapter 4, Reactor
ML23135A1788 May 20236 to Updated Safety Analysis Report, Chapter 12, Radiation ProtectionSafe Shutdown
Boric Acid
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Coatings
Incorporated by reference
Fuel cladding
Pressure Boundary Leakage
Scaffolding
ML23135A2038 May 2023Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) AnalysisHot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
Pressure Boundary Leakage
Fire Protection Program
Backfit
ML23135A1798 May 20236 to Updated Safety Analysis Report, Chapter 13, Conduct of OperationsOffsite Dose Calculation Manual
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Incorporated by reference
Job Performance Measure
Process Control Program
Safeguards Contingency Plan
License Renewal
Exemption Request
Fire Protection Program
Scaffolding
Grace period
ML23135A1278 May 20236 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted