ML23165A216 | 13 June 2023 | Enclosure 3: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Revision 11 | Safe Shutdown Boric Acid Loop seal Non-Destructive Examination Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Squib Emergency Lighting Incorporated by reference Tornado Generated Missile Earthquake Pressure Boundary Leakage Pressure boundary leak Flow Induced Vibration |
ML23165A218 | 13 June 2023 | Enclosure 8: Vogtle Electric Generating Plant, Units 3 and 4, Technical Requirements Manual (Trm), Revision 20 | Time of Discovery Shutdown Margin Post Accident Monitoring Emergency Lighting Fuel cladding Offsite Circuit |
ML23165A213 | 13 June 2023 | Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal | Incorporated by reference |
ML23165A215 | 13 June 2023 | Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12 | Safe Shutdown Boric Acid Fitness for Duty High winds Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Coatings Operating Basis Earthquake Squib Cyber Security Emergency Lighting Incorporated by reference Test box Main transformer failure Significance Determination Process Job Performance Measure Scram Discharge Volume Process Control Program Safeguards Contingency Plan Hemyc License Renewal Earthquake Control of Heavy Loads Power-Operated Valves Pandemic Power Operated Valves Chernobyl Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Fatality Power Uprate Failure to Scram Depleted uranium |
NL-23-0456, Enclosure 5: Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information. Enclosure 6: Affidavit from Southern N | 13 June 2023 | Enclosure 5: Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information. Enclosure 6: Affidavit from Southern Nuc | |
ND-22-0882, (VEGP) Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) | 17 November 2022 | (VEGP) Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) | |
ML22326A059 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 2 of 7) | Safe Shutdown Boric Acid Shutdown Margin Loop seal Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Aging Management Earthquake Power Operated Valves Turbine Missile Fuel cladding Liquid penetrant Scaffolding Power change Coast down GOTHIC |
ML22326A062 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant and Chapter 2, Site Characteristics (Part 1 of 2) | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Met Tower Operating Basis Earthquake Nondestructive Examination VT-2 Incorporated by reference Abnormal operational transient Surveillance Frequency Control Program Battery sizing License Renewal Earthquake Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Fire Protection Program Power Uprate Measurement Uncertainty Recapture |
ML22326A063 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 3 of 7) | Safe Shutdown Earthquake Operating Basis Earthquake |
ML22326A120 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 3 of 3); Chapter 9, Auxiliary Systems; and Chapter 10, Steam and Power Conversion System (Part 1 of 2) | Safe Shutdown Boric Acid High winds Loop seal Ultimate heat sink Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Emergency Lighting Aging Management Tornado Missile Protection Overtravel License Renewal Earthquake Fuel cladding Liquid penetrant Power Uprate |
ML22326A117 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 2 of 3) | |
ML22326A116 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 3 of 3) and Chapter 7, Instrumentation and Controls (Part 1 of 2) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Packing leak Ultimate heat sink Mission time Grab sample Fire Barrier Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Coatings Tornado-Generated Missile Large early release frequency Earthquake Power-Operated Valves Fuel cladding |
ML22326A114 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (Part 2 of 2); Chapter 11, Chapter 12, Chapter 13, Chapter 14, and Chapter 15 (Part 1 of 2) | Safe Shutdown Boric Acid Fitness for Duty Shutdown Margin High Radiation Area Ultimate heat sink Mission time Grab sample Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Temporary Modification Emergency Lighting Incorporated by reference Aging Management Surveillance Frequency Control Program Process Control Program License Renewal Earthquake Power-Operated Valves Fuel cladding Fire Protection Program Unidentified leakage Power Uprate Measurement Uncertainty Recapture Exclusive Use |
ML22326A060 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 4 of 7) | Safe Shutdown Earthquake Operating Basis Earthquake |
ML22326A064 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Part 2 of 2) and Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 1 of 7) | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Tornado-Generated Missile Tornado Missile Protection Design basis earthquake Tornado Missile Risk Evaluator Earthquake Turbine Missile Through-Wall Leakage Fire Protection Program Power change Weak link |
ML22326A107 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 4, Reactor (Part 2 of 2); Chapter 5, Reactor Coolant System and Connected Systems; and Chapter 6, Engineered Safety Features (Part 1 of 3) | |
ML22326A066 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 6 of 7) | |
ML22326A113 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (Part 2 of 2), and Chapter 8, Electric Power (Part 1 of 3) | Safe Shutdown Boric Acid High winds Fire Barrier Operator Manual Action FLEX Aging Management Surveillance Frequency Control Program Open Phase Condition Residual voltage transfer |
ML22326A065 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 7 of 7) and Chapter 4, Reactor (Part 1 of 2) | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Earthquake Fuel cladding Power change GOTHIC |
ML22326A121 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 15 (Part 2 of 2), Chapter 16, Chapter 17, Chapter 18, Chapter 19, Table of Contents, Rev 24 Epl | Safe Shutdown Boric Acid Health Physics Network Shutdown Margin Loop seal Ultimate heat sink Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Weld Overlay Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Incorporated by reference Condition Adverse to Quality Aging Management Time Critical Operator Action License Renewal Earthquake Turbine Missile Fuel cladding Pressure Boundary Leakage Fire Protection Program Power change Coast down GOTHIC Operability Assessment Unidentified leakage Power Uprate Measurement Uncertainty Recapture Failure to Scram |
NL-22-0810, 4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report | Safe Shutdown Internal Flooding Temporary Modification Turbine Missile Fuel cladding |
ML22326A067 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 5 of 7) | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake |
ML22326A119 | 31 October 2022 | 4 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 2 of 3) | |
ML22179A120 | 15 June 2022 | Enclosure 5 List of UFSAR and Tier 1 Figures & Sections Containing Security-Related or Proprietary Information, Enclosure 6 SNC Affidavit, and Enclosure 7 Westinghouse Application for Withholding Proprietary Information & Affidavit | |
ML21179A112 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 19, Probabilistic Risk Assessment | Hot Short Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Grab sample Fire Barrier Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Squib Finite Element Analysis Significance Determination Process Severe Accident Management Guideline Earthquake Fuel cladding Fire Watch Coast down |
ML21179A106 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering | Safe Shutdown High Radiation Area Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting Condition Adverse to Quality Fuel cladding Scaffolding |
ML21179A104 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4A, Observation Well Installation and Development Report | |
ML21179A096 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Squib Water level shrink Incorporated by reference Fuel cladding Power change |
ML21179A100 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | Probabilistic Risk Assessment Incorporated by reference |
ML21179A105 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4B, Groundwater Model Development & Analysis | Met Tower |
ML21179A113 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion | Safe Shutdown Non-Destructive Examination Grab sample Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Design basis earthquake Earthquake Turbine Missile Power change |
ML21179A125 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Nuclear Island Seismic Analyses | Earthquake |
ML21179A107 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2 Thru 2.4 | Safe Shutdown Boric Acid Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Annual Radiological Environmental Operating Report Frazil ice Earthquake |
ML21179A103 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Probabilistic Risk Assessment Coatings Annual Radioactive Effluent Release Report Deep Dose Equivalent Fuel cladding Scaffolding |
ML21179A123 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Loop seal Non-Destructive Examination Stroke time Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Squib VT-2 Incorporated by reference Pressure and Temperature Limits Report Code Reconciliation Earthquake Power-Operated Valves Power Operated Valves Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Scaffolding Power change Unidentified leakage |
ML21179A118 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components | Safe Shutdown Boric Acid Loop seal Stroke time Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Squib Incorporated by reference Finite Element Analysis Earthquake Control of Heavy Loads Power-Operated Valves Fuel cladding Liquid penetrant Dissimilar Metal Weld Power change Loctite Flow Induced Vibration Coast down |
ML21179A110 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | Safe Shutdown Boric Acid Fitness for Duty High winds Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Coatings Operating Basis Earthquake Squib Cyber Security Emergency Lighting Incorporated by reference Test box Main transformer failure Significance Determination Process Job Performance Measure Scram Discharge Volume Process Control Program Safeguards Contingency Plan Hemyc License Renewal Earthquake Control of Heavy Loads Power-Operated Valves Pandemic Power Operated Valves Chernobyl Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Fatality Power Uprate Failure to Scram Depleted uranium |
ML21179A093 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Hot Short Safe Shutdown Boric Acid Health Physics Network Shutdown Margin Loop seal High Radiation Area Ultimate heat sink Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Squib Emergency Lighting FLEX Abnormal operational transient Overtravel Earthquake Control of Heavy Loads Fire Protection Program Scaffolding Power change Unidentified leak Siren Exclusive Use |
ML21179A115 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering, (Part 1 of 3) | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Aging Management Design basis earthquake Earthquake |
ML21179A101 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Safe Shutdown Boric Acid Shutdown Margin Non-Destructive Examination Grab sample Fire Barrier Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Squib Emergency Lighting Pressure boundary leak Flow Induced Vibration |
ML21179A111 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operation | Safe Shutdown Fitness for Duty Offsite Dose Calculation Manual Contraband Probabilistic Risk Assessment Cyber Security Incorporated by reference Process Control Program Safeguards Contingency Plan Earthquake Fire Protection Program Fire Watch Power change |
ML21179A122 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3H, Auxiliary and Shield Building Critical Sections | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Squib Finite Element Analysis Earthquake |
ML21179A109 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Safe Shutdown Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Annual Radioactive Effluent Release Report Process Control Program Fuel cladding Pressure Boundary Leakage Pressure boundary leak |
ML21179A098 | 15 June 2021 | Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal | Hot Short Safe Shutdown Shutdown Margin High Radiation Area Ultimate heat sink Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Squib Cyber Security Emergency Lighting Incorporated by reference Earthquake Fire Protection Program Fire Watch |
ML21179A117 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A Thru 2.5E | Safe Shutdown Earthquake Earthquake |
ML21179A108 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Squib Incorporated by reference Maintenance Rule Program Fuel cladding |
ML21179A102 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Safe Shutdown Boric Acid Shutdown Margin Packing leak Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Squib Power-Operated Valves Fuel cladding Coast down |
ML21179A124 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Thru 3.7 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Squib Finite Element Analysis Tornado-Generated Missile Tornado Missile Protection Earthquake Turbine Missile Pressure Boundary Leakage Through-Wall Leakage Offsite Circuit Power change Unidentified leakage |
ND-21-0486, 0 to Updated Final Safety Analysis Report, Chapter 4, Reactor | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Boric Acid Shutdown Margin Grab sample Safe Shutdown Earthquake Probabilistic Risk Assessment Nondestructive Examination Rod Drop Event Earthquake Fuel cladding Power change |
ML21179A119 | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structures | Safe Shutdown Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Finite Element Analysis Tornado Generated Missile Earthquake Fuel cladding Liquid penetrant Weak link |