Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23165A21613 June 2023Enclosure 3: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Revision 11Safe Shutdown
Boric Acid
Loop seal
Non-Destructive Examination
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Squib
Emergency Lighting
Incorporated by reference
Tornado Generated Missile
Earthquake
Pressure Boundary Leakage
Pressure boundary leak
Flow Induced Vibration
ML23165A21813 June 2023Enclosure 8: Vogtle Electric Generating Plant, Units 3 and 4, Technical Requirements Manual (Trm), Revision 20Time of Discovery
Shutdown Margin
Post Accident Monitoring
Emergency Lighting
Fuel cladding
Offsite Circuit
ML23165A21313 June 2023Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual SubmittalIncorporated by reference
ML23165A21513 June 2023Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12Safe Shutdown
Boric Acid
Fitness for Duty
High winds
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Squib
Cyber Security
Emergency Lighting
Incorporated by reference
Test box
Main transformer failure
Significance Determination Process
Job Performance Measure
Scram Discharge Volume
Process Control Program
Safeguards Contingency Plan
Hemyc
License Renewal
Earthquake
Control of Heavy Loads
Power-Operated Valves
Pandemic
Power Operated Valves
Chernobyl
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Fatality
Power Uprate
Failure to Scram
Depleted uranium
NL-23-0456, Enclosure 5: Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information. Enclosure 6: Affidavit from Southern N13 June 2023Enclosure 5: Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information. Enclosure 6: Affidavit from Southern Nuc
ND-22-0882, (VEGP) Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)17 November 2022(VEGP) Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)
ML22326A05931 October 20224 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 2 of 7)Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Aging Management
Earthquake
Power Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Scaffolding
Power change
Coast down
GOTHIC
ML22326A06231 October 20224 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant and Chapter 2, Site Characteristics (Part 1 of 2)Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Met Tower
Operating Basis Earthquake
Nondestructive Examination
VT-2
Incorporated by reference
Abnormal operational transient
Surveillance Frequency Control Program
Battery sizing
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Power Uprate
Measurement Uncertainty Recapture
ML22326A06331 October 20224 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 3 of 7)Safe Shutdown Earthquake
Operating Basis Earthquake
ML22326A12031 October 20224 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 3 of 3); Chapter 9, Auxiliary Systems; and Chapter 10, Steam and Power Conversion System (Part 1 of 2)Safe Shutdown
Boric Acid
High winds
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Aging Management
Tornado Missile Protection
Overtravel
License Renewal
Earthquake
Fuel cladding
Liquid penetrant
Power Uprate
ML22326A11731 October 20224 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 2 of 3)
ML22326A11631 October 20224 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 3 of 3) and Chapter 7, Instrumentation and Controls (Part 1 of 2)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Mission time
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Coatings
Tornado-Generated Missile
Large early release frequency
Earthquake
Power-Operated Valves
Fuel cladding
ML22326A11431 October 20224 to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (Part 2 of 2); Chapter 11, Chapter 12, Chapter 13, Chapter 14, and Chapter 15 (Part 1 of 2)Safe Shutdown
Boric Acid
Fitness for Duty
Shutdown Margin
High Radiation Area
Ultimate heat sink
Mission time
Grab sample
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Temporary Modification
Emergency Lighting
Incorporated by reference
Aging Management
Surveillance Frequency Control Program
Process Control Program
License Renewal
Earthquake
Power-Operated Valves
Fuel cladding
Fire Protection Program
Unidentified leakage
Power Uprate
Measurement Uncertainty Recapture
Exclusive Use
ML22326A06031 October 20224 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 4 of 7)Safe Shutdown Earthquake
Operating Basis Earthquake
ML22326A06431 October 20224 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Part 2 of 2) and Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 1 of 7)Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Tornado-Generated Missile
Tornado Missile Protection
Design basis earthquake
Tornado Missile Risk Evaluator
Earthquake
Turbine Missile
Through-Wall Leakage
Fire Protection Program
Power change
Weak link
ML22326A10731 October 20224 to the Updated Final Safety Analysis Report, Chapter 4, Reactor (Part 2 of 2); Chapter 5, Reactor Coolant System and Connected Systems; and Chapter 6, Engineered Safety Features (Part 1 of 3)
ML22326A06631 October 20224 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 6 of 7)
ML22326A11331 October 20224 to the Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (Part 2 of 2), and Chapter 8, Electric Power (Part 1 of 3)Safe Shutdown
Boric Acid
High winds
Fire Barrier
Operator Manual Action
FLEX
Aging Management
Surveillance Frequency Control Program
Open Phase Condition
Residual voltage transfer
ML22326A06531 October 20224 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 7 of 7) and Chapter 4, Reactor (Part 1 of 2)Safe Shutdown
Boric Acid
Shutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Fuel cladding
Power change
GOTHIC
ML22326A12131 October 20224 to the Updated Final Safety Analysis Report, Chapter 15 (Part 2 of 2), Chapter 16, Chapter 17, Chapter 18, Chapter 19, Table of Contents, Rev 24 EplSafe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Condition Adverse to Quality
Aging Management
Time Critical Operator Action
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Power change
Coast down
GOTHIC
Operability Assessment
Unidentified leakage
Power Uprate
Measurement Uncertainty Recapture
Failure to Scram
NL-22-0810, 4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report31 October 20224 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments ReportSafe Shutdown
Internal Flooding
Temporary Modification
Turbine Missile
Fuel cladding
ML22326A06731 October 20224 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 5 of 7)Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
ML22326A11931 October 20224 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 2 of 3)
ML22179A12015 June 2022Enclosure 5 List of UFSAR and Tier 1 Figures & Sections Containing Security-Related or Proprietary Information, Enclosure 6 SNC Affidavit, and Enclosure 7 Westinghouse Application for Withholding Proprietary Information & Affidavit
ML21179A11215 June 20210 to Updated Final Safety Analysis Report, Chapter 19, Probabilistic Risk AssessmentHot Short
Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Grab sample
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Squib
Finite Element Analysis
Significance Determination Process
Severe Accident Management Guideline
Earthquake
Fuel cladding
Fire Watch
Coast down
ML21179A10615 June 20210 to Updated Final Safety Analysis Report, Chapter 18, Human Factors EngineeringSafe Shutdown
High Radiation Area
Non-Destructive Examination
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Emergency Lighting
Condition Adverse to Quality
Fuel cladding
Scaffolding
ML21179A10415 June 20210 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4A, Observation Well Installation and Development Report
ML21179A09615 June 20210 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Squib
Water level shrink
Incorporated by reference
Fuel cladding
Power change
ML21179A10015 June 20210 to Updated Final Safety Analysis Report, Chapter 16, Technical SpecificationsProbabilistic Risk Assessment
Incorporated by reference
ML21179A10515 June 20210 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4B, Groundwater Model Development & AnalysisMet Tower
ML21179A11315 June 20210 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power ConversionSafe Shutdown
Non-Destructive Examination
Grab sample
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Design basis earthquake
Earthquake
Turbine Missile
Power change
ML21179A12515 June 20210 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Nuclear Island Seismic AnalysesEarthquake
ML21179A10715 June 20210 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2 Thru 2.4Safe Shutdown
Boric Acid
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Annual Radiological Environmental Operating Report
Frazil ice
Earthquake
ML21179A10315 June 20210 to Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionBoric Acid
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Probabilistic Risk Assessment
Coatings
Annual Radioactive Effluent Release Report
Deep Dose Equivalent
Fuel cladding
Scaffolding
ML21179A12315 June 20210 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Boric Acid
Loop seal
Non-Destructive Examination
Stroke time
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Squib
VT-2
Incorporated by reference
Pressure and Temperature Limits Report
Code Reconciliation
Earthquake
Power-Operated Valves
Power Operated Valves
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
Power change
Unidentified leakage
ML21179A11815 June 20210 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and ComponentsSafe Shutdown
Boric Acid
Loop seal
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Squib
Incorporated by reference
Finite Element Analysis
Earthquake
Control of Heavy Loads
Power-Operated Valves
Fuel cladding
Liquid penetrant
Dissimilar Metal Weld
Power change
Loctite
Flow Induced Vibration
Coast down
ML21179A11015 June 20210 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the PlantSafe Shutdown
Boric Acid
Fitness for Duty
High winds
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Squib
Cyber Security
Emergency Lighting
Incorporated by reference
Test box
Main transformer failure
Significance Determination Process
Job Performance Measure
Scram Discharge Volume
Process Control Program
Safeguards Contingency Plan
Hemyc
License Renewal
Earthquake
Control of Heavy Loads
Power-Operated Valves
Pandemic
Power Operated Valves
Chernobyl
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Fatality
Power Uprate
Failure to Scram
Depleted uranium
ML21179A09315 June 20210 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsHot Short
Safe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
Loop seal
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Squib
Emergency Lighting
FLEX
Abnormal operational transient
Overtravel
Earthquake
Control of Heavy Loads
Fire Protection Program
Scaffolding
Power change
Unidentified leak
Siren
Exclusive Use
ML21179A11515 June 20210 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering, (Part 1 of 3)Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Aging Management
Design basis earthquake
Earthquake
ML21179A10115 June 20210 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramSafe Shutdown
Boric Acid
Shutdown Margin
Non-Destructive Examination
Grab sample
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Squib
Emergency Lighting
Pressure boundary leak
Flow Induced Vibration
ML21179A11115 June 20210 to Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationSafe Shutdown
Fitness for Duty
Offsite Dose Calculation Manual
Contraband
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
Process Control Program
Safeguards Contingency Plan
Earthquake
Fire Protection Program
Fire Watch
Power change
ML21179A12215 June 20210 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3H, Auxiliary and Shield Building Critical SectionsSafe Shutdown
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Squib
Finite Element Analysis
Earthquake
ML21179A10915 June 20210 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementSafe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Annual Radioactive Effluent Release Report
Process Control Program
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
ML21179A09815 June 2021Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual SubmittalHot Short
Safe Shutdown
Shutdown Margin
High Radiation Area
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Squib
Cyber Security
Emergency Lighting
Incorporated by reference
Earthquake
Fire Protection Program
Fire Watch
ML21179A11715 June 20210 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A Thru 2.5ESafe Shutdown Earthquake
Earthquake
ML21179A10815 June 20210 to Updated Final Safety Analysis Report, Chapter 17, Quality AssuranceHigh winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Squib
Incorporated by reference
Maintenance Rule Program
Fuel cladding
ML21179A10215 June 20210 to Updated Final Safety Analysis Report, Chapter 15, Accident AnalysesSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Squib
Power-Operated Valves
Fuel cladding
Coast down
ML21179A12415 June 20210 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Thru 3.7Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Squib
Finite Element Analysis
Tornado-Generated Missile
Tornado Missile Protection
Earthquake
Turbine Missile
Pressure Boundary Leakage
Through-Wall Leakage
Offsite Circuit
Power change
Unidentified leakage
ND-21-0486, 0 to Updated Final Safety Analysis Report, Chapter 4, Reactor15 June 20210 to Updated Final Safety Analysis Report, Chapter 4, ReactorBoric Acid
Shutdown Margin
Grab sample
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Nondestructive Examination
Rod Drop Event
Earthquake
Fuel cladding
Power change
ML21179A11915 June 20210 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I StructuresSafe Shutdown
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Finite Element Analysis
Tornado Generated Missile
Earthquake
Fuel cladding
Liquid penetrant
Weak link