Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22263A41220 September 2022Attachment 1 - Information Removed from DBNPS, Unit 1 UFSARFukushima Dai-Ichi
ML22263A41620 September 2022Enclosure D - DBNPS UFSAR, Rev. 34, Drawings Incorporated by Reference (Public)Incorporated by reference
FLEX
ML20302A31825 September 20203 to Updated Final Safety Analysis Report, Section 11, Radioactive Waste Management
ML21104A35425 September 20203 to Updated Final Safety Analysis Report, Section 3, Design Criteria- Structures, Components, Equipment, and Systems, Part 1 of 3 (Redacted)Safe Shutdown
Boric Acid
High winds
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Abnormal operational transient
Design basis earthquake
Earthquake
Turbine Missile
GOTHIC
ML20302A32025 September 20203 to Updated Final Safety Analysis Report, Section 15, Accident AnalysisSafe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Abnormal operational transient
Earthquake
Fuel cladding
ML20302A29125 September 20203 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems, Drawings, Part 2 of 3
ML20302A32125 September 20203 to Updated Final Safety Analysis Report, Section 13, Conduct of OperationsSafe Shutdown
Offsite Dose Calculation Manual
Process Control Program
Safeguards Contingency Plan
Fire Protection Program
ML20302A28425 September 20203 to Updated Final Safety Analysis Report, Section 5, Reactor Coolant SystemSafe Shutdown
Boric Acid
Weld Overlay
Post Accident Monitoring
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Power change
Flow Induced Vibration
ML21104A36625 September 20203 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems (Redacted)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Grab sample
Tornado Missile
Time to boil
Coatings
Nondestructive Examination
Zebra Mussel
Emergency Lighting
Incorporated by reference
FLEX
Tornado-Generated Missile
Test box
Tornado Missile Protection
Earthquake
Control of Heavy Loads
Fire Protection Program
Power change
Power Uprate
Measurement Uncertainty Recapture
Exclusive Use
L-20-234, 3 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted)25 September 20203 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted)
ML20302A34325 September 20203 to Updated Final Safety Analysis Report, Drawings - Part 2 of 7FLEX
ML20302A33725 September 20203 to Updated Final Safety Analysis Report, Drawings - Part 1 of 7
ML20302A33925 September 20203 to Updated Final Safety Analysis Report, Drawings - Part 3 of 7
ML21104A07425 September 20203 to Updated Final Safety Analysis Report, Section 1, Introduction General Description of Station (Redacted)Safe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Fire Barrier
Incorporated by reference
Earthquake
Turbine Missile
Fuel cladding
Offsite Circuit
ML20302A34625 September 20203 to Updated Final Safety Analysis ReportIncorporated by reference
ML20302A29325 September 20203 to Updated Final Safety Analysis Report, List of Table of Contents
ML20302A29625 September 20203 to Updated Final Safety Analysis Report, Section 14, Initial Tests and OperationBoric Acid
Shutdown Margin
Hydrostatic
ML20302A31925 September 20203 to Updated Final Safety Analysis Report, Section 16, Technical SpecificationsIncorporated by reference
ML20302A29025 September 20203 to Updated Final Safety Analysis Report, Section 2, Site CharacteristicsSafe Shutdown
High winds
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Operating Basis Earthquake
Incorporated by reference
FLEX
Annual Radiological Environmental Operating Report
Frazil ice
Earthquake
Environment Report
ML20302A28225 September 20203 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems, Part 3 of 3Safe Shutdown
Shutdown Margin
Loop seal
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Tornado Generated Missile
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Offsite Circuit
Power change
GOTHIC
ML20302A28525 September 20203 to Updated Final Safety Analysis Report, Section 7, Instrumentation and Control
ML20302A31325 September 20203 to Updated Final Safety Analysis Report, Section 18, Managing the Effects of Component AgingBoric Acid
Fire Barrier
Weld Overlay
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Pressure and Temperature Limits Report
Foreign Material Exclusion
Moisture barrier
License Renewal
Earthquake
Maintenance Rule Program
Control of Heavy Loads
EVT-1
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
Flow Induced Vibration
Power Uprate
Measurement Uncertainty Recapture
ML20302A34125 September 20203 to Updated Final Safety Analysis Report, Drawings - Part 4 of 7
ML21104A35725 September 20203 to Updated Final Safety Analysis Report, Section 6, Engineered Safety Features (Redacted)Boric Acid
Loop seal
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Coatings
Earthquake
Power Operated Valves
Fuel cladding
Liquid penetrant
Scaffolding
ML20302A28925 September 20203 to Updated Final Safety Analysis Report, Section 4, ReactorSafe Shutdown
Boric Acid
Shutdown Margin
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Finite Element Analysis
Earthquake
Fuel cladding
Liquid penetrant
ML20302A29925 September 20203 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion SystemSafe Shutdown
Loop seal
Grab sample
Offsite Dose Calculation Manual
Tornado Missile
Hydrostatic
Earthquake
Power Operated Valves
Turbine Missile
ML21104A36525 September 20203 to Updated Final Safety Analysis Report, Section 8, Electrical Power (Redacted)Safe Shutdown
Fire Barrier
Emergency Lighting
Open Phase Condition
Battery sizing
ML20302A34025 September 20203 to Updated Final Safety Analysis Report, Drawings - Part 5 of 7Boric Acid
ML20302A33825 September 20203 to Updated Final Safety Analysis Report, Drawings - Part 6 of 7
ML20302A29525 September 20203 to Updated Final Safety Analysis Report, Section 17, Quality Assurance Program for Station OperationIncorporated by reference
ML21104A37225 September 20203 to Updated Final Safety Analysis Report, Section 12, Radiation Protection (Redacted)Boric Acid
High Radiation Area
Grab sample
Hydrostatic
Locked High Radiation Area
Design basis earthquake
Power Uprate
L-18-206, Revision 32 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems24 September 2018Revision 32 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems
L-17-262, First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 2120 November 2017First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 21Offsite Dose Calculation Manual
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Aging Management
Process Control Program
License Renewal
Fire Protection Program
Grace period
ML17045A49221 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00031, Rev 9
ML17045A48721 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-0001, Rev 12
ML17045A55821 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00064, Rev 12
ML17045A51921 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00057, Rev 7
ML17045A50321 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00041, Rev 8
ML17045A51621 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00054, Rev 11
ML17039A76621 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00016, Rev 21
ML17045A50121 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00039, Rev 14
ML17045A50721 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00045, Rev 9
ML17039A64421 November 2016Revision 31 to Updated Final Safety Analysis Report, Fire Hazard Analysis Report, Rev. 27, Section 6, Emergency Lighting and CommunicationsSafe Shutdown
Emergency Lighting
ML17045A57021 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00075, Rev 11
ML17045A51721 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00055, Rev 11
ML17045A49621 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00035, Rev 9
ML17045A51221 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00050, Rev 6
ML17045A55421 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00060, Rev 6
ML17045A51521 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00053, Rev 7
ML17045A51421 November 2016Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00052, Rev 6