ML17348A56614 September 1990Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule.
ML17348A5507 September 1990Forwards Jul 1990 Integrated Schedule Regulatory Rept for FacilitiesBoric Acid
Ultimate heat sink
Stroke time
ML17348A5467 September 1990Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval.VT-2
ML17348A5526 September 1990Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs
ML17348A54331 August 1990Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA
ML17348A53627 August 1990Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners.Process Control Program
ML17348A51724 August 1990Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 RequestSafe Shutdown
Post Accident Monitoring
ML17348A50417 August 1990Forwards fitness-for-duty Program Performance Data for Jan-June 1990Fitness for Duty
ML17348A50515 August 1990Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3
ML20059B01114 August 1990Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813
ML17348A49710 August 1990Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed
ML17348A47027 July 1990Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance TestingFitness for Duty
ML17348A42825 July 1990Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b)
L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)25 July 1990Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)
ML17348A46923 July 1990Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 RequestSafe Shutdown
Commercial Grade Dedication
ML17348A41420 July 1990Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel
ML17348A41920 July 1990Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921
ML17348A42020 July 1990Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr
ML17348A41719 July 1990Forwards May 1990 Integrated Schedule Regulatory Rept for PlantUltimate heat sink
Stroke time
ML17348A41218 July 1990Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount.
ML17348A42517 July 1990Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition
ML17348A41516 July 1990Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated
IR 05000250/199001316 July 1990Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated
ML17348A41616 July 1990Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units
ML20055G86416 July 1990Informs ASLB That Petitioners Ref to Several Telephone Contacts Between J Butler & M Gutman,Of ATI Career Training Inst Is Inadvertent Misstatement & Should Be Changed to Telephone Contact. W/Certificate of Svc
ML17348A39212 July 1990Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPsFitness for Duty
Stroke time
Commercial Grade Dedication
Coatings
Job Performance Measure
Systematic Assessment of Licensee Performance
Generic Fundamentals Examination
Stolen
ML17348A40412 July 1990Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project
L-90-261, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld11 July 1990Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld
L-90-259, Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3))11 July 1990Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3))
ML17348A43211 July 1990Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901
ML17348A3949 July 1990Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe ShutdownSafe Shutdown
Boric Acid
Fire Barrier
Fire Protection Program
ML17348A3885 July 1990Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs
ML17348A4315 July 1990Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons
ML17348A3713 July 1990Responds to NRC 900524 Request for Addl Info on Emergency Power Sys Enhancement ProjectSafe Shutdown Earthquake
ML17348A3673 July 1990Confirms Util Intentions Not to Operate Beyond Refueling Outage That Represents Last Outage Re NRC Bulletin 89-001
ML17348A3853 July 1990Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/90-08 & 50-251/90-08.Corrective Actions:Training Dept Increased Emphasis on Radiological Postings in Radiation Worker Training
ML17348A38429 June 1990Forwards LER 90-11 on 900609 Re hi-hi Steam Generator Water Level Turbine Trip & Subsequent Reactor Trip Due to Failure of Switch in Feedwater Valve Controller Hand/Auto Station. W/O Encl
ML17348A36029 June 1990Responds to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Test Procedures Developed & Under Mgt Review Reflecting Revised Inservice Testing Program
ML17348A36528 June 1990Advises That Completion of safety-related motor-operated Valve Testing & Surveillance Will Be Completed by June 1990, Per Generic Ltr 89-10 Requirements
ML17348A36228 June 1990Notifies That Senior Operator License SOP-20177-2 Will Be Terminated,Effective 900731
ML17348A38627 June 1990Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702
ML17348A36427 June 1990Responds to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions.
ML17348A35927 June 1990Responds to Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09.Corrective Actions:Specialist Counselled on Importance of Stopping Procedure When Steps Conflict W/ Condition of Plant & Procedure Use Guidelines Reviewed
ML17348A35521 June 1990Responds to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Five Untraceable Circuit Breakers Installed in Unit 3 safety-related Sys.All Five Breakers Replaced W/Traceable Breakers
ML20055D92020 June 1990Advises That Sp Frantz Will Represent Licensee in Argument Scheduled for 900710.Certificate of Svc Encl
ML17348A31819 June 1990Forwards Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant, Per NRC Bulletin 88-008Nondestructive Examination
ML17348A29812 June 1990Forwards Rev 16 to Topical QA Rept.
ML17348A2868 June 1990Advises That Info Re Operating History of Select Fuel Assemblies Sent to ORNL Between 900419 & 26,per 900510 Request
ML17348A2878 June 1990Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves or Valves of Similar Design. Bolt Replacement PerformedAnchor Darling
ML17348A2784 June 1990Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info