Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20059L016 | 18 September 1990 | Forwards Corrected Monthly Operating Rept for Aug 1990 for Big Rock Point Plant,Consisting of Corrections to Grey Book | |
ML18057A481 | 17 September 1990 | Confirms 900718 Telcon Notification Re Westinghouse Agreement to Join Utils as Equity Investor in Plant | |
ML20059K238 | 7 September 1990 | Forwards Info in Response to Request for fitness-for-duty Policy & Procedures,Per NRC | |
ML18057A455 | 6 September 1990 | Forwards Proprietary Info Re Dept of Labor Decision on Discharge of Former Employee of Util,Per NRC 900809 Request. No 10CFR50.7 Violation Occurred Since Job Performance Was Reason for Discharge.Encl Withheld (Ref 10CFR2.790(a)(6)) | |
ML20059F503 | 5 September 1990 | Forwards Description of Scope & Objectives for 1990 Emergency Exercise Scheduled for 901204.Region III Will Participate | |
IR 05000255/1990010 | 4 September 1990 | Submits Addl Info Re Circuit & Raceway Schedule Enhancement Project,Per Insp Rept 50-255/90-10.Electrical Cable Separation & Channelization Anomalies Identified During Review of Physical Raceway Installations Will Be Evaluated | |
ML18057A452 | 4 September 1990 | Submits Addl Info Re Circuit & Raceway Schedule Enhancement Project,Per Insp Rept 50-255/90-10.Electrical Cable Separation & Channelization Anomalies Identified During Review of Physical Raceway Installations Will Be Evaluated | |
ML18057A438 | 31 August 1990 | Forwards Info Re Contamination of South Radwaste Area,Per 10CFR20.302,in Response to NRC 900112 Request.Approval Requested to Dispose of Low Level Radwaste in Place | |
ML18057A437 | 31 August 1990 | Forwards Analysis Concluding That Plant Reactor Beltline Matl Upper Shelf Energy Will Remain Greater than 50ft-lbs Until Yr 2032,per 900716 Commitment | Fire Protection Program |
ML20059E000 | 29 August 1990 | Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990 | |
ML18057A420 | 24 August 1990 | Forwards Revised Application for Amend to License DPR-20, Changing Tech Specs Re Incore Analysis Program.Request Revised Per NRC Comments During 900709 Meeting | |
ML20059B622 | 22 August 1990 | Forwards Missing Pages 25 & 26 Omitted from Facility Decommissioning Funding Rept,Consisting of Attachment a to Exhibit E | |
ML20059B632 | 22 August 1990 | Forwards Revised Engineering Analysis of Generic Ltr 88-01 on Plant Temp Pressure Limits in Support of Licensee 900110 Tech Spec Change Request,Per NRC Request | |
ML20059B637 | 22 August 1990 | Forwards Correction to 900628 Response to Generic Ltr 90-04 Re Status of Generic Safety Issues (Gsis).Response Contained Some Errors in That Some Palisades Plant Related Info Inadvertently Substituted Into GSI Table for Big Rock Point | |
ML18057A402 | 22 August 1990 | Forwards Missing Pages from Decommissioning Funding Rept, Consisting of Pages 25 & 26 of Attachment a to Exhibit E | |
ML18057A424 | 21 August 1990 | Forwards Application for Amend to License DPR-20,changing Tech Spec 4.5.1 Re Statement on Integrated Leak Rate Test | |
ML18057A418 | 21 August 1990 | Forwards Description of Changes Being Made to Plant Site Emergency Plan & Emergency Plan Changes.Change Allows Reduction in Shift Staffing During Cold Shutdown for Stated Staff | Minimum staff |
ML18057A412 | 21 August 1990 | Forwards Application for Amend to License DPR-20,changing Tech Specs to Revise Wording for Reactor Protective Sys Trip Setting Limits for Steam Generator Low Water Level | |
ML18057A407 | 21 August 1990 | Forwards Tech Specs Change Request to License DPR-20,to Remove Redundant Requirements & Change Basis Statements No Longer Applicable | Hydrostatic |
ML18057A391 | 17 August 1990 | Forwards Replacement Pages,To Palisades Second 10-Yr Interval Inservice Insp Program. | |
ML18057A385 | 17 August 1990 | Forwards Addl Info in Support of NRC Development of SER for full-term OL for Plant,Including Date of SER Providing Provisional OL to Plant & Summary of Valid Exemptions from 10CFR Regulations,Per Telcon | Exemption Request |
ML18057A384 | 17 August 1990 | Provides Addl Info Re Transfer of Plant Ownership to Palisades Generating Co,Per NRC 900725 Ltr | Safe Shutdown |
ML18057A382 | 14 August 1990 | Requests That Bechtel-KWU Rept 128901/MJS, Full Flow Testing of Motor-Operated Valve MO-1042A, Be Withheld (Ref 10CFR2.790(b)(1)) | |
ML18057A372 | 8 August 1990 | Forwards Addl Info Re Util Request for Exemption from Separation Criteria of 10CFR50,App R,Section III.G.2 Re Containment Air Room | Safe Shutdown FLEX Exemption Request |
ML20058L989 | 6 August 1990 | Provides Util Comments Re SALP 9 Board Rept.Declining Trend in Radiological Controls Noted in Cover Ltr Needs to Be Reevaluated | |
ML20056A349 | 3 August 1990 | Updates Response to NRC Bulletin 90-002, Loss of Thermal Margin Due to Channel Bow | |
05000155/LER-1990-002, Requests Extension of Due Date for Radiation on-the-job Training to 901101,per 900518 LER-90-002 Describing Violation Involving Unqualified Technician Assigned to Shift Compliment.Delay Due to Forced Outage | 1 August 1990 | Requests Extension of Due Date for Radiation on-the-job Training to 901101,per 900518 LER-90-002 Describing Violation Involving Unqualified Technician Assigned to Shift Compliment.Delay Due to Forced Outage | |
ML20055J384 | 26 July 1990 | Forwards Certification of Financial Assurances for Decommissioning | |
ML20055J142 | 26 July 1990 | Responds to Commitment Oversight Issue Resulting from Insp Rept 50-255/90-08.Commitment Mgt Seminar Training Will Be Complete Prior to 901001 | |
ML18057A356 | 26 July 1990 | Forwards Certification of Financial Assurance for Decommissioning | |
ML18057A341 | 18 July 1990 | Forwards Revised Proposed Tech Spec Page 6-3,now Designated as Page 6-1b,adding Section 6.3.4,now Designated as Section 6.3.5 to Remove Organization Charts,Per Generic Ltr 88-06 | |
ML18057A338 | 16 July 1990 | Advises That Util Does Not Foresee Need to Rely on Section V.C of App G to Remain in Compliance W/Upper Shelf Energy (Use) Requirements Re Use of Matl in Reactor Beltline | |
ML18057A328 | 13 July 1990 | Responds to Request for Addl Info Re Second 10-yr Interval Insp Program,Per 900418 Telcon.Util 900329 Response Revised to Reflect That Certain Components in Class 2 Sys Should Not Be Exempted,Per IWC-1220 of 1974 ASME Code Section XI | Boric Acid |
ML18057A319 | 9 July 1990 | Forwards Performance Indicator Trend Graphs for Jan 1989 - May 1990 | |
ML18057A320 | 6 July 1990 | Discusses Reassessment of Control Room Temp Following Station Blackout Event.Results of Analysis Indicate That Control Room Temp Will Remain Below 112 F for 4 H After Onset of Blackout | |
ML18057A317 | 3 July 1990 | Provides Summary of Upgrades Made to Plant Electrical Distribution Sys,Per 870714 Loss of Offsite Power Event When Inadvertent Actuation of Water Deluge Spray Sys for 1-2 Startup Transformer Resulted in Bus to Ground Fault | |
ML20058K377 | 2 July 1990 | Forwards Rev 26 to Security Plan.Rev Withheld (Ref 10CFR73.21(c)) | |
ML20055E021 | 29 June 1990 | Requests NRC Approval of Encl Simulation Facility Application for Plant,Per 10CFR55.45(b) | |
ML18057A311 | 25 June 1990 | Forwards Endorsements 116 & 117 to Nelia Policy NF-179 & Endorsements 102 & 103 to Maelu Policy MF-50 | |
ML18057A310 | 25 June 1990 | Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements on Corrective Actions. | Scram Discharge Volume |
ML18057A303 | 22 June 1990 | Provides Addl Info Re Environ Qualification of Instrument Circuit Associated W/Steam Generator Pressure Channel PT-0752D,per Insp Rept 50-255/90-05.Circuits Spliced Directly to Pigtail from Electrical Penetration Connector | |
ML18057A300 | 21 June 1990 | Concurs W/Nrc Change in Terminology & Submits Revised Proposed Section 4.14 of Tech Specs | |
ML18057A277 | 15 June 1990 | Forwards Corrected NRC Form 474 Re Simulation Facility Certification,Indicating Exceptions to Ansi/Ans 3.5 | |
ML18057A290 | 13 June 1990 | Forwards Application for Amend to License DPR-20,revising Tech Spec 3.3.1.b Re Safety Injection Tank Min Level | |
ML18057A294 | 12 June 1990 | Advises That Submittal of Second Interval Inservice Insp Program Delayed from 900615 to 900715,per 900418 Telcon | |
ML18057A259 | 11 June 1990 | Forwards Palisades Simulator Certification Submittal. | |
ML18057A264 | 11 June 1990 | Provides Response to NRC Requalification Exam Rept Dtd 900410 on NRC Concerns Re Facility & Training Ctr Staffing. Adequate Staffing Will Be Maintained to Ensure Operator Requalification Program Successful | Job Performance Measure |
ML18057A271 | 11 June 1990 | Requests Temporary Waiver of Compliance from Tech Spec 3.1.1i in Order to Maintain Plant in Hot Shutdown While Repair Made to Pressurizer Heater Power Supply.Request Based on 900608 Failure of Heater Transformer 15 | Safe Shutdown |
ML18057A263 | 10 June 1990 | Requests Temporary Waiver of Compliance from Tech Spec 3.1.1i to Enable Plant to Be Maintained in Hot Shutdown While Repair Made to Pressurizer Heater Power Supply.Waiver Requested for 900611-18 | Safe Shutdown |
ML18057A257 | 8 June 1990 | Responds to NRC 900509 Ltr Re Violations Noted in Insp Rept 50-255/90-12.Corrective Actions:Continuing Training Program Will Be Developed for Supervisors That Will Discuss Fire Protection Program Implementation Topics | Fire Protection Program |