Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17328A448 | 21 September 1990 | Requests Withdrawal of Mode 6 Proposed Tech Spec Change Since Issue Currently Being Addressed by New STSs | |
ML20059L010 | 19 September 1990 | Provides Addl Response to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per .Corrective Action:Operations & Compliance Mgt Further Examined Event & Concluded That Trains Vc/Yc Inoperable Per Special Order | |
ML20059L009 | 18 September 1990 | Informs of Delay in Response to Violations Noted in Insp Repts 50-369/90-14 & 50-370/90-14.Delay Due to Ongoing Review | |
ML20059K666 | 17 September 1990 | Forwards Evaluation That Provides Details of Plug Cracks & Justification for Continued Operation Until 1993 | Safe Shutdown |
ML20059J712 | 14 September 1990 | Forwards Monthly Operating Rept for Aug 1990 for McGuire Nuclear Station Units 1 & 2 & Monthly Operating Status Rept for Jul 1990 | |
ML20059L552 | 14 September 1990 | Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) | Affidavit |
ML20059L549 | 14 September 1990 | Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld | |
ML20065D467 | 11 September 1990 | Informs of Delay in Response to Violation Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per Commitment in | |
ML20059H403 | 10 September 1990 | Discusses Plant Design Baseline & Verification Program Deficiency D.4.3-3 Noted in Insp Repts 50-327/86-27 & 50-328/86-27.Evaluation Concluded That pre-restart Walkdown Data,Loops 1 & 2 Yielded Adequate Design Input | |
ML20064A803 | 10 September 1990 | Responds to NRC Ltr Re Violations Noted in Insp Repts 50-369/90-13 & 50-370/90-13.Corrective Actions:Procedures Dealing W/Fuel Handling Will Be Enhanced by Adding Sign Off to Sections Which Ref Fuel Handling in Tech Specs | |
ML20064A574 | 4 September 1990 | Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) | |
ML20059G301 | 4 September 1990 | Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire | |
ML20064A567 | 1 September 1990 | Advises That Corrective Actions Re Violation of Insp Rept 50-369/89-01 & 50-370/89-01 Will Be Completed by 910101 | |
ML20059H183 | 31 August 1990 | Forwards Nonproprietary PFE-F26NP & Proprietary PFE-F26, Sequoyah Nuclear Plan Unit 1,Cycle 5 Restart Physics Test Summary, Re Testing Following Vantage 5H Fuel Assembly installation.PFE-F26 Withheld (Ref 10CFR2.790(b)(4)) | |
ML18033B503 | 31 August 1990 | Forwards Financial Info Required to Assure Retrospective Premiums,Per 10CFR140 & 771209 Ltr | |
ML20059E288 | 31 August 1990 | Forwards Addl Info Re Alternate Testing of Reactor Vessel Head & Internals Lifting Rigs,Per NUREG-0612.Based on Listed Hardships,Util Did Not Choose 150% Load Test Option | Non-Destructive Examination Nondestructive Examination Liquid penetrant |
ML20059E185 | 31 August 1990 | Responds to NRC Re Violations Noted in Insp Repts 50-327/90-22 & 50-328/90-22.Corrective Actions:Extensive Mgt Focus Being Applied to Improve Overtime Use Controls | Condition Adverse to Quality Fire Protection Program |
ML20059D346 | 30 August 1990 | Forwards Semiannual Effluent Release Rept for First Half of CY90 & Revs to Process Control Program | Process Control Program |
ML20028G834 | 28 August 1990 | Forwards Calculation SCG1S361, Foundation Investigation of ERCW Pumping Station Foundation Cells. | Operating Basis Earthquake |
ML17328A433 | 27 August 1990 | Informs of Preliminary Assessment of 900713 Electrical Contact Accident at Facility.Investigation Concludes That No Safety Rules Violated | |
ML17334B378 | 24 August 1990 | Forwards Info to Certify Plant Simulator Facility.Results of Evaluation of Dual Unit Simulation Facilities Demonstrate That Plant Simulator Performance Compares Favorably W/Units | Backfit |
ML17328A400 | 24 August 1990 | Responds to 900725 Ltr Re Commitments Made in Response to Generic Ltr 88-14 on Instrument Air Supply Problems Affecting safety-related Equipment.Simulator Training to Be Provided as Stated | |
ML16259A239 | 22 August 1990 | Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo | |
ML20059G914 | 22 August 1990 | Forwards Public Version of Revised Epips,Including Change 0 to RP/O/A/5700/01,Change 0 to RP/O/A/5700/02 & Change 0 to RP/O/A/5700/03 | |
ML20059D190 | 22 August 1990 | Responds to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11.Corrective Actions:Valves VC-1,VC-2,VC-3,VC-4, VC-9,VC-10,VC-11 & VC-12 Reopened Upon Discovery of VC-1 - VC-4 Being Closed & Procedure IP/0/13/3006/09 Revised | |
ML17328A423 | 21 August 1990 | Forwards Under Separate Cover,Semiannual Radioactive Effluent Release Rept for Jan-June 1990 | |
ML20056B518 | 20 August 1990 | Responds to NRC Re Order Imposing Civil Monetary Penalty & Violations Noted in Insp Repts 50-327/90-01 & 50-328/90-01.Corrective Actions:Organizational Capabilities Reviewed.Payment of Civil Penalty Wired to NRC | Condition Adverse to Quality |
ML20063Q247 | 20 August 1990 | Submits Implementation Schedule for Cable Tray Support Program.Util Proposes Deferral of Portion of Remaining Activities Until After Current Unit 2 Cycle 4 Refueling Outage,Per 900817 Meeting.Tva Presentation Matl Encl | |
ML20059B445 | 20 August 1990 | Requests That NRC Approval of Original Relief Request 89-02 Be Extended to Include Changes to Mods MG-22233 & MG-22243 as Described.Hydrostatic Testing Impractical Due to Inadequacy of Test Boundaries | Hydrostatic |
ML20059C120 | 20 August 1990 | Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement | |
ML20063Q246 | 17 August 1990 | Forwards Cable Test Program Resolution Plan to Resolve Issues Re Pullbys,Jamming & Vertical Supported Cable & TVA- Identified Cable Damage.Tva Commits to Take Actions Prior to Startup to Verify Integrity of safety-related Cables | Condition Adverse to Quality |
ML20059C159 | 17 August 1990 | Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld | |
ML17328A390 | 17 August 1990 | Responds to NRC 900720 Ltr Re Violations Noted in Onsite Audit of Spds.Corrective Actions:Apparent Disparity in Selection of Reactor Trip & Sys Capacity or Anticipatory Values Rectified | |
ML17328A389 | 15 August 1990 | Forwards Performance Data Sheets for Plant fitness-for-duty Program for Period Jan-June 1990,per 10CFR26.Encl Includes Statistics on Various Categories of Testing,Substances Tested for & cut-off Levels Used | Fitness for Duty |
ML20063Q090 | 15 August 1990 | Forwards Monthly Operating Repts for Jul 1990 for McGuire Nuclear Station Units 1 & 2 & Revised Rept for June 1990 | |
ML20059A512 | 15 August 1990 | Provides Clarification of Implementation of Replacement Items Project at Plant for Previously Procured Warehouse Inventory.Util Committed to 100% Dedication of Commercial Grade,Qa,Level Ii,Previous Procurement Warehouse Spare | |
ML20063Q267 | 14 August 1990 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo | |
ML20058N018 | 8 August 1990 | Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire | |
ML20058M232 | 7 August 1990 | Forwards Rept of 900709 Fishkill,Per Requirements in App B, Environ Tech Spec,Subsections 4.1.1 & 5.4.2.Sudden Water Temp Increase Killed Approximately 150 Fish in Plant Diffuser Pond | |
ML20058N236 | 7 August 1990 | Confirms That Requalification Program Evaluation Ref Matl Delivered to Rd Mcwhorter on 900801.Ref Matl Needed to Support NRC Preparation for Administering Licensed Operator Requalification Exams in Sept 1990 | |
ML20063Q018 | 7 August 1990 | Confirms That Planned Corrective Actions Listed in Paragraph 3 of Insp Repts 50-369/90-10 & 50-370/90-10,appropriately Described | |
ML17328A357 | 2 August 1990 | Responds to Open Items in Safety Evaluation of Util Response to Unresolved Issues on post-fire Safe Shutdown Methodology. Open Items 1 & 21 Will Be Closed by Implementing Plant Procedures Providing Equivalent Degree of Protection | Safe Shutdown Fire Barrier |
ML20056A954 | 1 August 1990 | Provides Final Response to NUREG-0737,Item II.D.1, Performance Testing of Safety Relief Valves. Util Will Change Seal Configuration for Existing Valves to Seal on Steam Medium & Install Continuous Drain for Loop Piping | |
ML20058L181 | 1 August 1990 | Forwards Safety Evaluation of Large Break LOCA Event Reanalysis Per 10CFR50.46 Re Peak Clad Temp Increases | Stroke time |
ML20058L406 | 1 August 1990 | Forwards Rev 0 to Inservice Insp Rept Unit 1 McGuire 1990 Refueling Outage 6 | |
ML20059K029 | 1 August 1990 | Forwards Comments on Reactor Operator & Senior Reactor Operator Written Exams Administered on 900730 | |
ML20058M011 | 27 July 1990 | Forwards Addl Info Re Plant Condition Adverse to Quality Rept Concerning Operability Determination.Probability of Cable Damage During Installation Low.No Programmatic Cable Installation Problems Exist | Safe Shutdown Condition Adverse to Quality |
ML20058M447 | 27 July 1990 | Responds to Unresolved Items Which Remain Open from Insp Repts 50-327/90-18 & 50-328/90-18.TVA in Agreement W/Nrc on Scope of Work Required to Address Concerns W/Exception of Design Basis Accident & Zero Period Accelaration Effects | |
ML20055J353 | 27 July 1990 | Forwards Revised Commitment to Resolve EOP Step Deviation Document Review Comments | |
ML20055J077 | 26 July 1990 | Requests Termination of Senior Reactor Operator License SOP-20830 for Jh Sullivan Due to Resignation from Util |