Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23249A262 | 6 September 2023 | Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021) | |
RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | 13 July 2022 | Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | Earthquake Fire Protection Program |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel | 20 January 2022 | Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel | Anticipated operational occurrence Post Accident Monitoring Fuel cladding |
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Nondestructive Examination |
SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | 8 October 2020 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | Post Accident Monitoring |
RS-20-086, Renewed Facility Operating License Nos. DPR-29 and DPR-30 | 24 September 2020 | Renewed Facility Operating License Nos. DPR-29 and DPR-30 | Exemption Request Pandemic Coronavirus COVID-19 |
ML20121A133 | 3 March 2020 | Biological Opinion 2019 Annual Incidental Take Report | |
RS-19-049, Submittal of 10 CFR 50.46 Annual Report | 2 May 2019 | Submittal of 10 CFR 50.46 Annual Report | |
ML19064B370 | 5 March 2019 | Enclosure a - QDC-7500-M-2341, Revision 0, Quad Cities Units 1 & 2 Secondary Containment Drawdown Analysis. | Stroke time GOTHIC |
ML19064B371 | 5 March 2019 | Enclosure B - QDC-0000-N-1481, Revision 3, Quad Cities Units 1 & 2 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. | |
RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 14 August 2018 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Safe Shutdown High winds Ultimate heat sink Mission time Time to boil Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Emergency Lighting Functionality Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Time Critical Operator Action Battery sizing B.5.b Mitigating Strategies Flood Hazard Mitigation Strategies Assessment Hardened vent Fuel cladding |
RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | 14 August 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | High winds FLEX Tornado Generated Missile Design basis earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Containment Hardened Vent Battery sizing |
LR-N18-0057, Pressure and Temperature Limits Report, Revision 1 | 8 June 2018 | Pressure and Temperature Limits Report, Revision 1 | Pressure and Temperature Limits Report |
LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary | 9 November 2017 | License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary | Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
LR-N17-0092, Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | 28 April 2017 | Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | Pressure and Temperature Limits Report |
ML17188A267 | 31 March 2017 | Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) | |
LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) | 31 March 2017 | Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) | |
ML17188A265 | 31 December 2016 | Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi | |
LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve | 31 December 2016 | Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi | |
ML16271A324 | 31 October 2016 | Technical Review Documentation for Flooding Hazard Reevaluation of Quad Cities Nuclear Power Station, Units 1 and 2 | Fukushima Dai-Ichi |
ML16256A642 | 31 August 2016 | NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. | Safe Shutdown Earthquake Operating Basis Earthquake Cyber Security |
LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. | 31 August 2016 | NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. | Safe Shutdown Earthquake Operating Basis Earthquake Cyber Security |
ML16256A644 | 30 September 2015 | NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. | |
LR-N15-0178, NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary) | 30 September 2015 | NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary) | |
LR-N16-0113, NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. | 30 September 2015 | NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. | |
ML15251A384 | 31 August 2015 | Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary) | Anticipated operational occurrence Finite Element Analysis |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
ML15030A295 | 22 September 2014 | Table 04, Groundwater Measurements and Elevations - First Quarter 2014 | |
ML15030A294 | 22 September 2014 | Table 03, Effluent Data Tritium Activity | |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
ML14101A228 | 7 April 2014 | Holtec International Report No. HI-2125245, Revision 5, Licensing Report for Quad Cities Criticality Analysis for Inserts. | Fuel cladding |
ML13365A253 | 11 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown High winds Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Containment Hardened Vent Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML14028A074 | 6 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Hope Creek Generating Station, TAC No. MF0867 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
LR-N14-0024, Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | 29 January 2014 | Report SL-011553, Revision 2, Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | 19 December 2013 | Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | Safe Shutdown Reactor Vessel Water Level Mission time Stroke time Post Accident Monitoring Scram Discharge Volume MELLLA |
ML13317A957 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake Hardened vent |
ML13199A038 | 16 July 2013 | Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary Version | Fuel cladding |
ML13052A678 | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | |
ML13052A679 | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | |
ML13052A677 | 30 November 2012 | Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | |
LR-N12-0366, Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | 30 November 2012 | Enclosure 1 to LR-N12-0366, Salem - Hope Creek Kld TR-499, Development of Evacuation Time Estimates, Cover Through Chapter 5 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 6 Through Chapter 9 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | 30 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Chapter 10 Through Appendix G | |
ML13052A682 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix L Through Appendix N | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 | |
ML13052A681 | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-1 Through K-75 | |
LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J | 28 November 2012 | Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix H Through Appendix J |