ML23275A111 | 2 October 2023 | Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Pressure Boundary Leakage |
ML23275A119 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 | Unanalyzed Condition Boric Acid Shutdown Margin Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage Power Uprate |
ML23275A118 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 | Safe Shutdown Shutdown Margin Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel |
ML23275A121 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Stroke time Coatings Surveillance Frequency Control Program Process Control Program Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Recently irradiated fuel |
ML23275A120 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 | Boric Acid Shutdown Margin Stroke time Surveillance Frequency Control Program Fuel cladding Power Uprate |
ML23275A117 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 | Anticipated operational occurrence Missed surveillance Surveillance Frequency Control Program Fuel cladding Power change |
ML23275A116 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 | Boric Acid Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Fuel cladding Power change |
ML23275A122 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Incorporated by reference Missed surveillance Surveillance Frequency Control Program Operability Determination Earthquake Control of Heavy Loads Recently irradiated fuel Power change |
ML23275A113 | 2 October 2023 | Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database - Volume 3 | Shutdown Margin Packing leak Offsite Dose Calculation Manual Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage Unidentified leakage |
ML23275A115 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 | Safe Shutdown Time of Discovery Fire Barrier Tornado Missile Internal Flooding Incorporated by reference Missed surveillance Turbine Missile Offsite Circuit |
ML23275A114 | 2 October 2023 | Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 | Anticipated operational occurrence Fuel cladding |
ML23275A112 | 2 October 2023 | Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 | Offsite Dose Calculation Manual Surveillance Frequency Control Program |
ML23275A124 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 | Boric Acid Shutdown Margin Time to boil Probabilistic Risk Assessment Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel |
ML23275A123 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 | Safe Shutdown Shutdown Margin Stroke time Anticipated operational occurrence Probabilistic Risk Assessment Qualified Offsite Circuit Surveillance Frequency Control Program Battery sizing Control of Heavy Loads Recently irradiated fuel Offsite Circuit |
ML23275A125 | 2 October 2023 | Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 | |
ML23275A126 | 2 October 2023 | Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 | Shutdown Margin Packing leak High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Nonconservative Technical Specifications Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Fire Protection Program |
L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal | 2 October 2023 | Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal | Shutdown Margin Offsite Dose Calculation Manual Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan License Renewal Fire Protection Program |
L-2022-014, Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements | 13 January 2022 | Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements | |
ML22013A660 | 11 November 2021 | Amendment 31 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | |
L-2021-159, Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal | 15 September 2021 | Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal | Surveillance Frequency Control Program |
ML21265A288 | 15 September 2021 | Enclosure 2 - Volume 3 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 1.0 Use and Application, Revision 0 | Shutdown Margin Packing leak Offsite Dose Calculation Manual Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage Unidentified leakage |
ML21265A286 | 15 September 2021 | Enclosure 2 - Volume 1 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion Application of Selection Criteria to the St. Lucie Plant Units 1 and 2 Technical Specifications, Revision 0 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Pressure Boundary Leakage |
ML21265A289 | 15 September 2021 | Enclosure 2 - Volume 4 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 2.0 Safety Limits, Revision 0 | Anticipated operational occurrence Fuel cladding |
ML21265A301 | 15 September 2021 | Enclosure 2 - Volume 16 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 5.0 Administrative Controls, Revision 0 | Shutdown Margin Packing leak High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Fire Protection Program |
ML21265A292 | 15 September 2021 | Enclosure 2 - Volume 7 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.2 Power Distribution Limits, Revision 0 | Anticipated operational occurrence Incorporated by reference Missed surveillance Surveillance Frequency Control Program Fuel cladding Power change |
ML21265A299 | 15 September 2021 | Enclosure 2 - Volume 14 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.9 Refueling Operations, Revision 0 | Boric Acid Shutdown Margin Time to boil Probabilistic Risk Assessment Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel |
ML21265A300 | 15 September 2021 | Enclosure 2 - Volume 15 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 4.0 Design Features, Revision 0 | |
ML21265A298 | 15 September 2021 | Enclosure 2 - Volume 13 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.8 Electrical Systems, Revision 0 | Safe Shutdown Shutdown Margin Stroke time Anticipated operational occurrence Probabilistic Risk Assessment Qualified Offsite Circuit Surveillance Frequency Control Program Battery sizing Control of Heavy Loads Recently irradiated fuel Offsite Circuit |
ML21265A295 | 15 September 2021 | Enclosure 2 - Volume 10 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.5 Emergency Core Cooling Systems (Eccs), Revision 0 | Boric Acid Shutdown Margin Stroke time Incorporated by reference Surveillance Frequency Control Program Fuel cladding Power Uprate |
ML21265A297 | 15 September 2021 | Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Incorporated by reference Missed surveillance Surveillance Frequency Control Program Operability Determination Earthquake Control of Heavy Loads Recently irradiated fuel Power change |
ML21265A294 | 15 September 2021 | Enclosure 2 - Volume 9 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.4 Reactor Coolant System (Rcs), Revision 0 | Unanalyzed Condition Boric Acid Shutdown Margin Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
ML21265A293 | 15 September 2021 | Enclosure 2 - Volume 8 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.3 Instrumentation, Revision 0 | |
ML21265A291 | 15 September 2021 | Enclosure 2 - Volume 6 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.1 Reactivity Control Systems, Revision 0 | Boric Acid Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Fuel cladding Power change |
ML21265A290 | 15 September 2021 | Enclosure 2 - Volume 5 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.0 LCO and SR Applicability, Revision 0 | Safe Shutdown Time of Discovery Fire Barrier Tornado Missile Internal Flooding Incorporated by reference Missed surveillance Surveillance Frequency Control Program Turbine Missile Offsite Circuit |
ML21265A296 | 15 September 2021 | Enclosure 2 - Volume 11 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.6 Containment Systems, Revision 0 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Stroke time Coatings Surveillance Frequency Control Program Process Control Program Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Recently irradiated fuel |
ML20141L664 | 4 May 2020 | Amendment 30 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | |
ML19203A166 | 26 July 2019 | Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator | Safe Shutdown High winds Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency Maintenance Rule Program Offsite Circuit Continuous fire watch Very Early Warning Fire Detection |
ML18274A224 | 2 November 2018 | Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map | |
L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications | 29 May 2018 | Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications | Safe Shutdown Time of Discovery Shutdown Margin Ultimate heat sink Stroke time Incorporated by reference Surveillance Frequency Control Program Pressure Boundary Leakage Offsite Circuit |
L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b | 1 February 2018 | Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Fire Protection Program Very Early Warning Fire Detection |
ML16341C175 | 19 December 2016 | Correction to Amendment No. 237 Regarding the Update to Appendix B to the Renewed Facility Operating Licenses to Incorporate the 2016 Biological Opinion | |
ML16166A424 | 5 October 2016 | St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses | Surveillance Frequency Control Program |
ML16183A138 | 19 September 2016 | Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle | Shutdown Margin Fuel cladding |
ML16124A383 | 25 May 2016 | St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) | |
ML16063A121 | 19 April 2016 | Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Exemption Request Fuel cladding Power change |
ML15344A346 | 31 March 2016 | Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) | Hot Short Safe Shutdown Boric Acid High Radiation Area Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Coatings Operator Manual Action Cyber Security Multiple Spurious Operation Emergency Lighting B.5.b Thermoset Process Control Program Large early release frequency Safeguards Contingency Plan Hemyc Cable Tray Ignition Exemption Request Earthquake Fire Protection Program Early Warning Fire Detection Very Early Warning Fire Detection Fatality |
ML16034A080 | 7 March 2016 | Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents | Unanalyzed Condition Shutdown Margin Probabilistic Risk Assessment Operator Manual Action |
L-2015-303, Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps | 15 December 2015 | Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps | Surveillance Frequency Control Program |