ML22013A660
From kanterella
Jump to navigation
Jump to search
ML22013A660 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 11/11/2021 |
From: | Florida Power & Light Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML22013A681 | List:
|
References | |
L-2021-177 | |
Download: ML22013A660 (2) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Technical Specifications
MONTHYEARML23275A1112023-10-0202 October 2023
[Table view]Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1132023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database - Volume 3 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 L-2022-014, Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements2022-01-13013 January 2022 Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements ML22013A6602021-11-11011 November 2021 Amendment 31 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21265A2952021-09-15015 September 2021 Enclosure 2 - Volume 10 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.5 Emergency Core Cooling Systems (Eccs), Revision 0 ML21265A2962021-09-15015 September 2021 Enclosure 2 - Volume 11 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.6 Containment Systems, Revision 0 ML21265A2902021-09-15015 September 2021 Enclosure 2 - Volume 5 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.0 LCO and SR Applicability, Revision 0 ML21265A2912021-09-15015 September 2021 Enclosure 2 - Volume 6 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.1 Reactivity Control Systems, Revision 0 ML21265A2932021-09-15015 September 2021 Enclosure 2 - Volume 8 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.3 Instrumentation, Revision 0 ML21265A2942021-09-15015 September 2021 Enclosure 2 - Volume 9 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.4 Reactor Coolant System (Rcs), Revision 0 L-2021-159, Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal2021-09-15015 September 2021 Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal ML21265A3012021-09-15015 September 2021 Enclosure 2 - Volume 16 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 5.0 Administrative Controls, Revision 0 ML21265A2972021-09-15015 September 2021 Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0 ML21265A2982021-09-15015 September 2021 Enclosure 2 - Volume 13 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.8 Electrical Systems, Revision 0 ML21265A3002021-09-15015 September 2021 Enclosure 2 - Volume 15 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 4.0 Design Features, Revision 0 ML21265A2992021-09-15015 September 2021 Enclosure 2 - Volume 14 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.9 Refueling Operations, Revision 0 ML21265A2922021-09-15015 September 2021 Enclosure 2 - Volume 7 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.2 Power Distribution Limits, Revision 0 ML21265A2892021-09-15015 September 2021 Enclosure 2 - Volume 4 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 2.0 Safety Limits, Revision 0 ML21265A2882021-09-15015 September 2021 Enclosure 2 - Volume 3 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 1.0 Use and Application, Revision 0 ML21265A2862021-09-15015 September 2021 Enclosure 2 - Volume 1 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion Application of Selection Criteria to the St. Lucie Plant Units 1 and 2 Technical Specifications, Revision 0 ML20141L6642020-05-0404 May 2020 Amendment 30 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b ML16341C1752016-12-19019 December 2016 Correction to Amendment No. 237 Regarding the Update to Appendix B to the Renewed Facility Operating Licenses to Incorporate the 2016 Biological Opinion ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) ML16034A0802016-03-0707 March 2016 Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2015-303, Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps2015-12-15015 December 2015 Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps ML15280A4222015-10-19019 October 2015 Unit 2 Technical Specification Pages 6-15b ML15191A4032015-08-31031 August 2015 Issuance of Amendments to Adopt TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiative 6B and 6C 2023-10-02 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23254A1642023-09-0606 September 2023
[Table view]Amendment 28 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23254A1792023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23254A1822023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23254A1772023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23254A1592023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A, Section 3, Intermediate Zone (60-150 Ft) ML23254A1612023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A, Boring Logs & Data Summaries ML23254A1622023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23254A1602023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls L-2023-109, Amendment 28 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant2023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML23254A1732023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Time-Limited Aging Analyses Activities ML23249A1922023-09-0606 September 2023 Submittal of Amendment 28 to Updated Final Safety Analysis Report and License Renewal 10CFR54.37(b) Report ML23254A1782023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23254A1812023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23254A1632023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23254A1672023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23254A1712023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 6, Section 6.3 Emergency Core Cooling System ML23254A1722023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23254A1662023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 15.6, Decrease in Reactor Coolant Inventory ML23254A1682023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23254A1762023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, List of Table of Contents ML23254A1802023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23254A1742023-09-0606 September 2023 Amendment 28 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23205A1262023-08-0303 August 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Public) ML23208A0092023-04-0303 April 2023 Unit 1 Amendment 32 to Updated Final Safety Analysis Report, Cover Letter ML23096A0432023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant Site Characteristics ML23096A0252023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23096A0402023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML23096A0362023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23096A0442023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management System ML23096A0302023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Volume 1 ML23096A0282023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23096A0332023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Time-Limited Aging Analyses Activities ML23096A0342023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML23096A0272023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 9.5A, Fire Protection Program Report ML23096A0312023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23096A0372023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System ML23096A0352023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23096A0322023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23096A0262023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23096A0392023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Volume 2 ML23096A0422023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23096A0452023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23096A0412023-04-0101 April 2023 Amendment 32 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A1172022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems L-2022-018, Submittal of Updated Final Safety Analysis Report Amendment No. 27 and License Renewal 10 CFR 54.37(b) Report2022-03-0404 March 2022 Submittal of Updated Final Safety Analysis Report Amendment No. 27 and License Renewal 10 CFR 54.37(b) Report ML22111A1122022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 6, Section 6.3, Emergency Core Cooling System ML22111A1092022-03-0404 March 2022 Amendment 27 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications 2023-09-06 |
Text
LIST OF EFFECTIVE PAGES
CHAPTER 16
TECHNICAL SPECIFICATIONS
Page Amendment
16-1 28
Replacement Sheet 0
UNIT 1 16-1 Amendment No. 28 (05/17)
CHAPTER 16
ST. LUCIE PLANT UNIT NO. 1 This chapter is replaced by TECHNICAL SPECIFICATIONS APPENDIX "A" TO LICENSE NO. DPR-67
Retrieved from "https://kanterella.com/w/index.php?title=ML22013A660&oldid=3737784"