Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212J6311 October 1999SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1Incorporated by reference
ML20217G37230 September 1999Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With
ML20217F99230 September 1999Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20212F56423 September 1999SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity LimitsFire Barrier
ML20212F47623 September 1999Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively
ML20212F08323 September 1999Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI IntervalSafe Shutdown
VT-2
Incorporated by reference
ML20211Q3179 September 1999Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996
ML20216E48831 August 1999Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With
ML20212C47631 August 1999Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With
ML20210L4362 August 1999Cycle 9 12-Month SG Insp Rept
ML20210L44531 July 1999Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept
ML20216E37831 July 1999Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20211A69231 July 1999Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20210G66328 July 1999Cycle 9 90-Day ISI Summary Rept
ML20209J19612 July 1999Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented
ML20196K4981 July 1999Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI AcceptableHigh Radiation Area
Stroke time
Incorporated by reference
Foreign Material Exclusion
Power-Operated Valves
Scaffolding
ML20209G06930 June 1999Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20209H38330 June 1999Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With
ML20211F90330 June 1999Cycle 9 Refueling Outage
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20196J85228 June 1999Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i)Non-Destructive Examination
Incorporated by reference
ML20195K29531 May 1999Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20196A11631 May 1999Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With
ML20206Q8955 May 1999Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10
ML20206R50330 April 1999Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With
ML20206Q48330 April 1999Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With
ML20206J12030 April 1999Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20205P87731 March 1999Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20205P98131 March 1999Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results
ML20207K51428 February 1999Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20205B66328 February 1999Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys
ML20204C31128 February 1999Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20203H73818 February 1999Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed ConditionsShutdown Margin
ML20211A20231 January 1999Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP IntersectionsWeak link
ML20206T79931 January 1999Iodine Revolatizitation in Grand Gulf Loca
ML20206D77231 December 1998South Mississippi Electric Power Association 1998 Annual Rept
ML20207A83031 December 19981998 Annual Operating Rept for Ggns,Unit 1Fire Watch
ML20206R95031 December 1998Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With
ML20199G36431 December 1998Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20198S73031 December 1998Cycle 10 Voltage-Based Repair Criteria 90-Day Rept
ML20197J5623 December 1998Unit 1 Cycle 9 90-Day ISI Summary ReptPacking leak
Hydrostatic
ML20197K11630 November 1998Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20198E24830 November 1998Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With
ML20195F41213 November 1998Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam)Safe Shutdown
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Finite Element Analysis
Condition Adverse to Quality
ML20195C4846 November 1998SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA ProgramTemporary Modification
Process Control Program
ML20195C2795 November 1998BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006
ML20195F48031 October 1998Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With
ML20195F80631 October 1998Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With