Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212J631 | 1 October 1999 | SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 | Incorporated by reference |
ML20217G372 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With | |
ML20217F992 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20212F564 | 23 September 1999 | SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits | Fire Barrier |
ML20212F476 | 23 September 1999 | Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively | |
ML20212F083 | 23 September 1999 | Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval | Safe Shutdown VT-2 Incorporated by reference |
ML20211Q317 | 9 September 1999 | Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 | |
ML20216E488 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With | |
ML20212C476 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With | |
ML20210L436 | 2 August 1999 | Cycle 9 12-Month SG Insp Rept | |
ML20210L445 | 31 July 1999 | Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept | |
ML20216E378 | 31 July 1999 | Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20211A692 | 31 July 1999 | Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20210G663 | 28 July 1999 | Cycle 9 90-Day ISI Summary Rept | |
ML20209J196 | 12 July 1999 | Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented | |
ML20196K498 | 1 July 1999 | Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable | High Radiation Area Stroke time Incorporated by reference Foreign Material Exclusion Power-Operated Valves Scaffolding |
ML20209G069 | 30 June 1999 | Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20209H383 | 30 June 1999 | Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With | |
ML20211F903 | 30 June 1999 | Cycle 9 Refueling Outage | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20196J852 | 28 June 1999 | Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) | Non-Destructive Examination Incorporated by reference |
ML20195K295 | 31 May 1999 | Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20196A116 | 31 May 1999 | Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With | |
ML20206Q895 | 5 May 1999 | Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 | |
ML20206R503 | 30 April 1999 | Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With | |
ML20206Q483 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With | |
ML20206J120 | 30 April 1999 | Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators | |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205P877 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20205P981 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
ML20207K514 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20205B663 | 28 February 1999 | Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys | |
ML20204C311 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20203H738 | 18 February 1999 | Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions | Shutdown Margin |
ML20211A202 | 31 January 1999 | Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections | Weak link |
ML20206T799 | 31 January 1999 | Iodine Revolatizitation in Grand Gulf Loca | |
ML20206D772 | 31 December 1998 | South Mississippi Electric Power Association 1998 Annual Rept | |
ML20207A830 | 31 December 1998 | 1998 Annual Operating Rept for Ggns,Unit 1 | Fire Watch |
ML20206R950 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20199G364 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20198S730 | 31 December 1998 | Cycle 10 Voltage-Based Repair Criteria 90-Day Rept | |
ML20197J562 | 3 December 1998 | Unit 1 Cycle 9 90-Day ISI Summary Rept | Packing leak Hydrostatic |
ML20197K116 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20198E248 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20195F412 | 13 November 1998 | Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam) | Safe Shutdown Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Finite Element Analysis Condition Adverse to Quality |
ML20195C484 | 6 November 1998 | SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program | Temporary Modification Process Control Program |
ML20195C279 | 5 November 1998 | BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 | |
ML20195F480 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20195F806 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With |