Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217K12314 October 1999Revised Positions for DBNPS & Pnpp QA ProgramOffsite Dose Calculation Manual
Coatings
Nondestructive Examination
Process Control Program
Fire Protection Program
ML20212J20130 September 1999Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico
L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with30 September 1999Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with
PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With30 September 1999Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With
L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With2 September 1999LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With
L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with31 August 1999Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with
NUREG-1482, SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant9 August 1999SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power PlantIncorporated by reference
L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With31 July 1999Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.WithZebra Mussel
PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With31 July 1999Monthly Operating Rept for July 1999 for Perry Npp.With
ML20210J38528 July 1999Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second IntervalWeld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld
L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with30 June 1999Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with
PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With30 June 1999Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20209D95327 June 1999Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
ML20196A19517 June 1999Instrument Drift Analysis
ML20207G2747 June 1999Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in ApplicationWeld Overlay
PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With31 May 1999Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With
L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with31 May 1999Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with
PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored12 May 1999Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be ExploredPost Accident Monitoring
L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable3 May 1999Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable
ML20206G6453 May 1999Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment InspCoatings
Nondestructive Examination
L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.WithFlow Induced Vibration
PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With30 April 1999Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20206E22629 April 1999Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at Pnpp & Use of Table IWB-3514Non-Destructive Examination
Weld Overlay
Dissimilar Metal Weld
ML20206D79123 April 1999Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7
ML20205P43715 April 1999Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal BindingPower-Operated Valves
Backfit
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20205L0409 April 1999SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2Boric Acid
Nondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite5 April 1999Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite
PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With31 March 1999Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With
L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with31 March 1999Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with
ML20206D84631 March 1999Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8Shutdown Margin
Anticipated operational occurrence
ML20205S06031 March 1999Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331Fuel cladding
ML20205G42231 March 1999Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1
ML20205C37626 March 1999Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19Exemption Request
ML20205D31026 March 1999Safety Evaluation Supporting Amend 103 to License NPF-58Earthquake
ML20196K79825 March 1999Rev 4 to COLR, for Cycle 8
PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 9902273 March 1999Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227Post Accident Monitoring
L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with28 February 1999Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with
PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With28 February 1999Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20203E11810 February 1999SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description
L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced5 February 1999Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced
ML20203A5962 February 1999Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR
ML20203D48131 January 1999Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With
ML20196F70131 January 1999BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626Hydrostatic
ML20207E66328 January 1999Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13Nondestructive Examination
ML20203A52127 January 1999Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS PumpsSafe Shutdown
Design basis earthquake
Earthquake
Backfit
ML20210G70422 January 1999BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122Boric Acid
Fire Barrier
Temporary Modification
ML20198R8927 January 1999SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable
ML20207E55231 December 1998Annual Rept 1998 for Ohio Edison