Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K123 | 14 October 1999 | Revised Positions for DBNPS & Pnpp QA Program | Offsite Dose Calculation Manual Coatings Nondestructive Examination Process Control Program Fire Protection Program |
ML20212J201 | 30 September 1999 | Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico | |
L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | |
PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With | |
L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | 2 September 1999 | LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | |
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With | |
L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | |
NUREG-1482, SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant | 9 August 1999 | SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant | Incorporated by reference |
L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | Zebra Mussel |
PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Perry Npp.With | |
ML20210J385 | 28 July 1999 | Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval | Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with | 30 June 1999 | Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with | |
PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With | |
ML20209D953 | 27 June 1999 | Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 | Boric Acid Hydrostatic Nondestructive Examination VT-2 |
ML20196A195 | 17 June 1999 | Instrument Drift Analysis | |
ML20207G274 | 7 June 1999 | Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application | Weld Overlay |
PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With | |
L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with | |
PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored | 12 May 1999 | Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored | Post Accident Monitoring |
L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable | 3 May 1999 | Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable | |
ML20206G645 | 3 May 1999 | Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp | Coatings Nondestructive Examination |
L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With | Flow Induced Vibration |
PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With | |
ML20206E226 | 29 April 1999 | Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at Pnpp & Use of Table IWB-3514 | Non-Destructive Examination Weld Overlay Dissimilar Metal Weld |
ML20206D791 | 23 April 1999 | Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7 | |
ML20205P437 | 15 April 1999 | Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding | Power-Operated Valves Backfit |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205L040 | 9 April 1999 | SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite | 5 April 1999 | Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite | |
PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With | |
L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with | |
ML20206D846 | 31 March 1999 | Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8 | Shutdown Margin Anticipated operational occurrence |
ML20205S060 | 31 March 1999 | Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 | Fuel cladding |
ML20205G422 | 31 March 1999 | Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 | |
ML20205C376 | 26 March 1999 | Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 | Exemption Request |
ML20205D310 | 26 March 1999 | Safety Evaluation Supporting Amend 103 to License NPF-58 | Earthquake |
ML20196K798 | 25 March 1999 | Rev 4 to COLR, for Cycle 8 | |
PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 | 3 March 1999 | Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 | Post Accident Monitoring |
L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with | |
PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With | |
ML20203E118 | 10 February 1999 | SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description | |
L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced | 5 February 1999 | Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced | |
ML20203A596 | 2 February 1999 | Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR | |
ML20203D481 | 31 January 1999 | Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With | |
ML20196F701 | 31 January 1999 | BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 | Hydrostatic |
ML20207E663 | 28 January 1999 | Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 | Nondestructive Examination |
ML20203A521 | 27 January 1999 | Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps | Safe Shutdown Design basis earthquake Earthquake Backfit |
ML20210G704 | 22 January 1999 | BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 | Boric Acid Fire Barrier Temporary Modification |
ML20198R892 | 7 January 1999 | SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable | |
ML20207E552 | 31 December 1998 | Annual Rept 1998 for Ohio Edison |