Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20140H579 | 10 December 1996 | Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station | Safe Shutdown Loop seal Mission time Internal Flooding Probabilistic Risk Assessment Emergency Lighting Severe Accident Management Guideline |
ML20116A484 | 30 September 1992 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant | Stroke time Probabilistic Risk Assessment |
ML20113H105 | 30 November 1991 | Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant | Probabilistic Risk Assessment |
ML20091K100 | 19 November 1991 | Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation | Safe Shutdown Emergency Lighting Battery sizing Earthquake |
ML20082P829 | 30 June 1991 | Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept | Boric Acid Stroke time Cold shutdown justification Power Operated Valves |
ML20151K789 | 30 April 1988 | Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept | Boric Acid Anticipated operational occurrence Fuel cladding |
ML20195J152 | 31 December 1987 | Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept | Boric Acid Stroke time Power Operated Valves |
ML20235L915 | 30 June 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept | |
ML20245B539 | 31 May 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept | |
ML20214S039 | 31 March 1987 | Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept | Loop seal Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20245A432 | 10 March 1987 | Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds | Weak link |
ML20211K510 | 30 November 1986 | Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 | |
ML20204G192 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe | |
ML20211G743 | 31 May 1986 | Conformance to Reg Guide 1.97,VC Summer Nuclear Station, Informal Rept | Boric Acid Fuel cladding |
ML20205F054 | 29 October 1985 | Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based On...Atws Events),Item 1.2, `Post-Trip Review,' Data & Info Capabilities for VC Summer Nuclear Station Unit 1 | |
ML20138J949 | 30 September 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 | |
ML20078D073 | 31 August 1983 | Control of Heavy Loads at Nuclear Power Plants,Vc Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept | Safe Shutdown Coatings Control of Heavy Loads |
ML20127D738 | 31 August 1983 | Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20087Q085 | 13 July 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept | |
ML20028B492 | 31 October 1982 | Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept | |
ML20054E896 | 31 March 1982 | Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1, Draft | Safe Shutdown Control of Heavy Loads |
ML20009A086 | 30 June 1981 | V.C. Summer Nuclear Station Unit 1 Emergency Feedwater System Reliability Study Evaluation | Fire Barrier Earthquake |
ML20005B172 | 31 May 1981 | Environ Statements Project, Monthly Progress Rept for May 1981 | |
ML19347E925 | 31 March 1981 | Environ Statements Project, Progress Rept for Mar 1981 | |
ML20003F957 | 28 February 1981 | Environ Statements Project, Monthly Progress Rept for Feb 1981 | |
ML19339D047 | 12 February 1981 | Power Sys Coordination & Integration Agreement Between Sc Public Svc Authority & Central Electric Power Cooperative,Inc. | |
ML19341C698 | 31 December 1980 | Environ Statements Project, Monthly Progress Rept for Dec 1980 | |
ML19294B288 | 31 December 1979 | Environ Statements Project, Monthly Progress Rept for Dec 1979 |