ML20199G840 | 6 November 1997 | Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits | Safe Shutdown Boric Acid Fire Barrier |
ML20140G572 | 24 April 1997 | Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits | Fire Barrier |
ML20117E220 | 28 June 1996 | Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept | Fire Barrier |
ML20094A484 | 31 August 1995 | Technical Evaluation Rept,Rev 6 for Plant Odcm | Offsite Dose Calculation Manual |
ML20080J184 | 28 February 1995 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 | |
ML20059F429 | 31 December 1993 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant | Packing leak Stroke time Probabilistic Risk Assessment |
ML20080G313 | 31 March 1993 | Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl | Unanalyzed Condition Loop seal Temporary Modification Missed surveillance |
ML20082M577 | 31 August 1991 | a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning | Hot Short Safe Shutdown Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Chernobyl |
ML20084T334 | 31 January 1991 | Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation | Safe Shutdown Boric Acid Emergency Lighting |
ML20059N794 | 30 June 1990 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 | Incorporated by reference |
ML19332B617 | 30 November 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. | |
ML20012A991 | 30 November 1989 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. | Incorporated by reference |
ML20235M002 | 30 June 1987 | Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept | Safe Shutdown Earthquake |
ML20235M380 | 30 June 1987 | Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept | |
ML20215M109 | 31 May 1987 | TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept | Loop seal Stroke time Anticipated operational occurrence Earthquake |
ML20215M306 | 31 May 1987 | Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20235M040 | 31 March 1987 | 1 Sqrt Rept, Informal Rept | Safe Shutdown Safe Shutdown Earthquake Finite Element Analysis Earthquake |
ML20214R379 | 28 February 1987 | Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept | Mission time |
ML20207N246 | 16 December 1986 | Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 | |
ML20211K510 | 30 November 1986 | Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 | |
ML20215M891 | 20 October 1986 | Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 | |
ML20204G192 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe | |
ML20207F159 | 8 July 1986 | Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 | |
ML20140G453 | 30 September 1985 | Draft Conformance to Reg Guide 1.97 South Texas Project, Units 1 & 2 | Boric Acid |
ML20104A726 | 19 July 1984 | Technical Evaluation Rept of Detailed Control Room Design Review,South Texas Project | Safe Shutdown Post Accident Monitoring |
ML20093C661 | 31 May 1984 | Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase II) | Safe Shutdown Boric Acid Control of Heavy Loads |
ML20093C665 | 31 May 1984 | Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase I), Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20087M642 | 31 January 1984 | Draft, Mitigative Techniques & Analysis of Generic Site Conditions for Groundwater Contamination Associated W/ Severe Accidents | High winds Hydrostatic Fuel cladding |
ML20079P159 | 6 January 1984 | Technical Evaluation of PRA for Tornado & Hurricane Missile Hazard to Containment Isolation Valve Compartment Equipment, South Texas Project | |
ML20055A306 | 28 June 1982 | Mod 1,clarifying Period of Performance to Commence 820301, to Expert Consultation & Witness Svc for South Tx Project Hearings | |
ML20055A302 | 28 June 1982 | Notification of Contract Execution,Mod 1 to Expert Consultation & Witness Svc for South Tx Project Hearings. Contractor:W Hubacek | |
ML19341C698 | 31 December 1980 | Environ Statements Project, Monthly Progress Rept for Dec 1980 |