Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20081A668 | 17 February 1995 | Final Rept Orise 95/B-80, Confimatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny | |
ML20081A693 | 17 February 1995 | Final Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny | |
ML20081B594 | 17 February 1995 | Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny | |
ML20081A945 | 16 February 1995 | Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny | |
ML20081A705 | 27 January 1995 | Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny | |
ML20081A715 | 27 January 1995 | Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny | |
ML20077M846 | 31 October 1994 | Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny | |
ML20076F929 | 30 September 1994 | Final Rept, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shorham Nuclear Power Station Brookhaven,Ny | |
ML20072P403 | 17 August 1994 | Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant | |
ML20064C142 | 28 February 1994 | Draft Confirmatory Survey of Turbine Bldg,Site Ground & Site Exteriors Shoreham Nuclear Power Station Brookhaven, Ny | |
ML20057B109 | 7 September 1993 | Mod 1,revising Estimated Completion Date,To Acquisition of Shoreham Simulator | |
ML20056E893 | 25 June 1993 | Contract Aquisition of Shoreham Simulator, Awarded to Long Island Lighting Co | Incorporated by reference Stolen |
ML20046B364 | 31 May 1993 | Draft Rept Entitled Confirmatory Survey of Turbine Internal Components Snps Brookhaven,Ny. | |
ML20217C753 | 22 April 1991 | Mod 7,providing 1991 Funding & Extending Period of Performance & Revising Statement of Work,To Maint & Operation of Lpdr | |
ML20217C745 | 22 April 1991 | Notification of Contract Execution,Mod 7,to Maint & Operation of Lpdr. Contractor:Shoreham-Wading River Public Library | |
ML20070U270 | 31 March 1991 | Containment Venting Analysis for the Shoreham Nuclear Power Station | |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML20235E598 | 26 June 1987 | Assessment of Shoreham Nuclear Power Station Secondary Containment Severe Accident Mitigation Capability, Final Ltr Rept | Reactor Vessel Water Level Probabilistic Risk Assessment |
ML20215K713 | 12 June 1987 | Considerations Re Certain Aspects of Severe Accident Mitigation Afforded by Operation of Shoreham at Reduced Power, Final Ltr Rept | Reactor Vessel Water Level Probabilistic Risk Assessment |
ML20215H635 | 12 June 1987 | Considerations Re Certain Aspects of Severe Accident Mitigation Afforded by Operation of Shoreham at Reduced Power, Final Ltr Rept | Reactor Vessel Water Level Probabilistic Risk Assessment |
ML20005D623 | 31 May 1987 | Shoreham Nuclear Power Station PRA-Based Sys Insp Plans. | |
ML19325C115 | 30 November 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Shoreham Nuclear Power Station. | |
ML20238B221 | 31 March 1986 | Conformance to Reg Guide 1.97 Shoreham Nuclear Power Station,Unit 1 | Squib Fuel cladding |
ML20136F653 | 31 December 1985 | Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept | Nondestructive Examination |
ML20210K645 | 30 November 1985 | PRA Insights | Safe Shutdown Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Earthquake Turbine Missile Fatality |
ML20138K680 | 30 November 1985 | a Review of the Shoreham Nuclear Power Station Probabilistic Risk Assessment.Internal Events and Core Damage Frequency | Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment Scram Discharge Volume Feedwater Controller Failure Grace period |
ML20138K824 | 31 October 1985 | Review of Design Review & Quality Revalidation Rept for Tdi Diesel Generators at Shoreham Nuclear Power Station Unit 1, Technical Evaluation Rept | Hydrostatic Nondestructive Examination Breakaway torque Earthquake Liquid penetrant Locktite |
ML20128H779 | 30 June 1985 | Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept | |
ML20140G744 | 18 June 1985 | Evaluation of Unisolated LOCA Outside Drywell in Shoreham Nuclear Power Station, Technical Rept | |
ML20126E986 | 31 May 1985 | Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept | |
ML20136G269 | 31 March 1985 | Conformance to Reg Guide 1.97,Shoreham Nuclear Power Station,Unit 1 | Fuel cladding |
ML20128Q051 | 28 February 1985 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Feb 1985.Related Info Encl | Probabilistic Risk Assessment |
ML20127C607 | 28 February 1985 | Draft Evaluation of Unisolated LOCA Outside Drywell in Shoreham Nuclear Power Station | |
ML20128Q031 | 31 January 1985 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Jan 1985 | Probabilistic Risk Assessment |
ML20111A655 | 31 December 1984 | Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Shoreham Nuclear Power Station Unit 1 | Weld Overlay Nondestructive Examination Finite Element Analysis Breakaway torque Liquid penetrant |
ML20128Q012 | 31 December 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Dec 1984 | Probabilistic Risk Assessment |
ML20128P994 | 30 November 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Nov 1984 | Probabilistic Risk Assessment |
ML20128Q477 | 31 October 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Oct 1984 | |
ML20128P988 | 30 September 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Sept 1984 | Probabilistic Risk Assessment |
ML20128P984 | 31 August 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Aug 1984 | Probabilistic Risk Assessment |
ML20128P901 | 30 June 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for June 1984 | Probabilistic Risk Assessment |
ML20128P963 | 31 May 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for May 1984 | Probabilistic Risk Assessment |
ML20128P941 | 30 April 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Apr 1984 | Probabilistic Risk Assessment |
ML20127B641 | 30 April 1984 | Review of Sequences Following Release of Excessive Water in Elevation 8 of Reactor Bldg in Shoreham Nuclear Power Station, Ltr Rept | Internal Flooding |
ML20087P939 | 6 April 1984 | Evaluation of Diesel Generator Failure at Shoreham Unit 1, Failure Cause Evaluation, Final Technical Evaluation Rept | Safe Shutdown |
ML20128P921 | 31 March 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Mar 1984 | Probabilistic Risk Assessment |
ML20128P892 | 29 February 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Feb 1984 | Probabilistic Risk Assessment |
ML20128P871 | 31 January 1984 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Jan 1984 | Probabilistic Risk Assessment |
ML20128P861 | 31 December 1983 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Dec 1983 | Probabilistic Risk Assessment |
ML20128Q089 | 30 November 1983 | Review of PRA for Shoreham Nuclear Power Plant, Monthly Highlights for Nov 1983 | Probabilistic Risk Assessment |