Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20199C188 | 8 January 1999 | Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan | |
ML20207J962 | 18 December 1998 | Rev 1 to TRM for Wolf Creek Generating Station,Unit 1 | Boric Acid Shutdown Margin High Radiation Area Grab sample Annual Radioactive Effluent Release Report Earthquake |
ML20195E767 | 10 November 1998 | Rev 0 to EPP 01-2.4, Core Damage Assessment Guidance | |
ML20202F036 | 26 November 1997 | Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval | Safe Shutdown Ultimate heat sink Stroke time Hydrostatic Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding |
ML20138F337 | 30 April 1997 | Rev 0 to Offsite Dose Calculation Manual | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML20140F015 | 26 December 1996 | Rev 6 to RSP-0008, ODCM Procedure | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20134J989 | 6 September 1996 | Fuel Assembly Insp Program Phase 2 | |
ML20116P134 | 8 August 1996 | Technical Requirements Manual | Safe Shutdown Time of Discovery Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Hydrostatic Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Earthquake Pressure Boundary Leakage Fire Protection Program Fire Watch Early Warning Fire Detection Power change Unidentified leakage |
ML20113F227 | 12 June 1996 | Rev 0 to Calculation PI-0103-00203.002-101, Ampacity Derating Evaluation | Fire Barrier |
ML20134J950 | 3 May 1996 | EOC-8 Fuel Assembly/Rcca Insp Program | |
B130180, Surveillance Specimen Program Evaluation for River Bend Station | 30 April 1996 | Surveillance Specimen Program Evaluation for River Bend Station | |
ML20134B211 | 26 March 1996 | Rev 28 to Shifting Charging Pumps | |
ML20134B215 | 10 January 1996 | Rev 14 to Chemical & Volume Control Sys Inservice Valve Test | Boric Acid Stroke time |
ML20108B594 | 1 October 1995 | Rev 5A to River Bend Station Offsite Dose Calculation Manual Procedure | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20092K199 | 20 September 1995 | Corrected Pages to Second Ten Yr Interval ISI Program, Including Pages D-153 to D-167,D-169 to D-170 & D-179 to D-184 | |
ML20091P464 | 30 August 1995 | Second Interval ISI Program Plan | Boric Acid High Radiation Area Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding Backfit |
ML20091Q251 | 18 August 1995 | Rev 11 of WCOP-02, IST Program for Pumps & Valves | Boric Acid Stroke time |
ML20134B233 | 9 November 1994 | Rev 4 to CVCS Inservice Valve Test | Fire Protection Program |
ML20134B240 | 9 November 1994 | Rev 0 to CCP Discharge Check Valve Inservice Test | Fire Protection Program |
ML20134B225 | 8 November 1994 | Rev 12 to CVCS Inservice Check Valve Test | |
ML20076K916 | 27 October 1994 | Updates to IST Pump & Valve Program Manual | Safe Shutdown Stroke time Scram Discharge Volume Cold shutdown justification Power Operated Valves |
ML20134B220 | 15 September 1994 | Rev 24 to Shifting Charging Pumps | |
ML20059A850 | 23 December 1993 | Near-Term Performance Improvement Plan | Emergency Lighting |
ML20058N730 | 13 October 1993 | Rev 10 to WCOP-02, IST Program for Pumps & Valves | Boric Acid Stroke time |
ML20128D922 | 29 January 1993 | Rev 6 to Pump & Valve Inservice Testing Plan for River Bend Station First 10-Yr Insp Interval | |
ML20045E031 | 19 August 1992 | Change 92-01 to Rev 3 to RSP-0008, Odcm. | |
ML20114D071 | 19 August 1992 | Rev 3 to Odcm | |
ML20114C385 | 20 April 1992 | Rev 9 to Offsite Dose Calculation Manual for Wolf Creek Generating Station | Offsite Dose Calculation Manual |
ML20090A906 | 4 December 1991 | Rev 8 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20086G841 | 2 October 1991 | Rev 5 to Inservice Insp Plan for River Bend Station - Unit 1 | |
ML20082M006 | 9 August 1991 | Rev 4 to RWS-0204, Radwaste Processing Control Program | Process Control Program |
RBG-35-380, Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests Encl | 26 July 1991 | Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests Encl | High Radiation Area Hydrostatic Cold shutdown justification |
ML20085C208 | 21 March 1991 | Rev 7 to Wolf Creek Generating Station Odcm | Grab sample Power change |
ML20029B784 | 6 March 1991 | Station,Inservice Insp Plan,Summary Rept Refuel Outage RF-3 Second Period,First Interval, Vols 1 & 2 | Non-Destructive Examination VT-2 Liquid penetrant |
ML20070U772 | 26 February 1991 | Rev 4 to River Bend Station Inservice Insp Plan (First Interval) | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Scaffolding |
ML20070S271 | 3 October 1990 | Rev 0 to RPP 07-102, Solid Radwaste Process Control Program | Process Control Program |
ML20012A251 | 27 November 1989 | Rev 5 to ODCM for Wolf Creek Generating Station. | Grab sample Offsite Dose Calculation Manual |
ML20245F010 | 24 April 1989 | Rev 2 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20114B741 | 8 March 1989 | Rev 5 to Procedure RWS-0304, Radwaste Handling & Control | High Radiation Area Process Control Program |
ML20245F004 | 14 February 1989 | Rev 3 to Offsite Dose Calculation Manual Procedure | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20154C985 | 16 August 1988 | Rev 3 to Inservice Insp-First Interval | Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Scaffolding |
ML18053A710 | 22 March 1988 | Rev 5 to Pump & Valve Inservice Testing Plan,First 10 Yr Insp Interval. W/880422 Ltr | |
ML20153C818 | 15 October 1987 | Rev 1 to Procedure Mpe E009Q-01, 13.8 Kv & 4.16 Kv Switchgear Insp & Testing | |
ML20234F300 | 31 August 1987 | Revised Radiological Emergency Response Plan Implementing Procedures,Including Table of Contents,Rev 5 to EPP 01-2.1, Emergency Classification & Rev 5 to EPP 01-2.2, Activation of Emergency Plan/Organization | |
ML20238C365 | 13 August 1987 | Rev 1 to Station Operating Procedure RSP-0008, Offsite Dose Calculation Manual Procedure | Offsite Dose Calculation Manual |
RBG-26506, Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid | 29 July 1987 | Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid | |
ML20235Y059 | 16 July 1987 | Rev 2 to Radwaste Processing Control Program | Process Control Program |
ML20237K610 | 19 June 1987 | 1987 Emergency Preparedness Field Exercise Objectives & Guidelines | |
RBG-26044, Rev 2 to Inservice Insp Plan - First Interval | 2 June 1987 | Rev 2 to Inservice Insp Plan - First Interval | Non-Destructive Examination Hydrostatic Nondestructive Examination Liquid penetrant Scaffolding |
ML20114B728 | 14 May 1987 | Rev 3 to Procedure RWS-0307, Radwaste Segregation |